Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Data Center Management
- Event source
- Identity source
- Equipment inventory
Data Center Management keeps service ownership, equipment, rack placement and cable work alongside the service team's incident, change and request records. A service has an owner and criticality; an asset belongs to a service; a rack position belongs to an asset.
Incidents in one list
The Request Coordinator approves or rejects submitted service work.
Every feature works on the same records. Pick one to see the screen your team works in.
Connect service ownership, equipment, location and operating state.
Investigating waits for the service manager
| Summary | Priority | Service | Asset | Assigned to | Opened at | |
|---|---|---|---|---|---|---|
| Replace Rack B11 PDU | Low | Monitoring and alerts | Rack C03 console server | Ravi Shah | 24 Oct | |
| Investigate east fabric loss | Medium | Identity access platform | Rack C03 console server | Nadia Chen | 19 Oct | |
| Restore failed backup disk | High | Customer application hosting | Rack D02 backup appliance | Ravi Shah | 21 Oct | |
| Tune west aisle cooling | Critical | Object storage gateway | Rack A12 compute node 03 | Priya Nair | 02 Nov | |
| Patch firewall pair | Low | Private network transit | Rack A08 firewall pair A | Luis Romero | 21 Oct |
Record rack code, occupied units and power against an asset.
Rack positions
| Rack code | Start u | Height u | Power watts | Asset | |
|---|---|---|---|---|---|
| H1-A12 | 410 | 780 | 390 | Rack B11 power distribution unit | |
| H1-B04 | 210 | 850 | 20 | Rack A08 firewall pair A | |
| H2-C07 | 550 | 90 | 610 | Rack C03 console server | |
| H1-A08 | 910 | 250 | 770 | Rack C03 console server | |
| H2-D02 | 530 | 720 | 330 | Rack A12 compute node 03 |
Record ports, cable identity and installation date against incident work.
Cable connections
| Cable ID | From port | To port | Cable type | Installed at | Operational record | |
|---|---|---|---|---|---|---|
| FIB-A12-B04-01 | A12-SW1 Eth1/1 | B04-SW1 Eth1/12 | Single-mode fiber | 20 Oct | West aisle temperature spike | |
| FIB-A12-B04-02 | B04-SW2 Eth1/8 | A12-SW2 Eth1/2 | Multimode fiber | 18 Oct | Compute node 08 unreachable | |
| COP-C07-D02-01 | C07-ST1 Port 2 | D02-BK1 Port 4 | Cat6 copper | 14 Oct | East fabric packet loss | |
| FIB-A08-B04-03 | A08-FW1 Port 3 | B04-SW2 Eth1/20 | Cat6a copper | 18 Oct | Backup appliance disk failure | |
| COP-B11-PDU-02 | B11-PDU Outlet 6 | A15-COMP PSU 1 | Direct attach copper | 04 Nov | East fabric packet loss |
Triage service disruptions with assigned people, affected assets and dated updates.
Incidents
| Summary | Priority | Status | Service | Asset | Opened at | |
|---|---|---|---|---|---|---|
| Replace Rack B11 PDU | Low | Open | Monitoring and alerts | Rack B11 power distribution unit | 01 Nov | |
| Investigate east fabric loss | Medium | Acknowledged | Customer application hosting | Rack B04 top-of-rack switch | 15 Oct | |
| Restore failed backup disk | High | Investigating | Object storage gateway | Rack A15 compute node 08 | 17 Oct | |
| Tune west aisle cooling | Critical | Resolved | Virtual machine cluster | Rack C03 console server | 18 Oct | |
| Patch firewall pair | Low | Closed | Managed firewall service | Rack B04 top-of-rack switch | 04 Nov |
Review service changes with risk, scheduled start and end, and a rollback plan.
Approval waits for the change manager
| Summary | Risk | Scheduled start | Scheduled end | Rollback plan | Service | |
|---|---|---|---|---|---|---|
| Replace Rack B11 PDU | Low | 24 Oct | 26 Oct | Restore prior switch config | Identity access platform | |
| Investigate east fabric loss | Medium | 12 Oct | 16 Oct | Move traffic to backup uplink | Customer application hosting | |
| Restore failed backup disk | High | 23 Oct | 28 Oct | Reinstall previous firmware | Managed firewall service | |
| Tune west aisle cooling | Low | 04 Nov | 11 Nov | Return cooling setpoint to 22 C | Backup storage platform | |
| Patch firewall pair | Medium | 22 Oct | 25 Oct | Fail back to standby firewall | Monitoring and alerts |
Move service requests from submission through approval, delivery and completion.
Approval conditions
| Request type | Requester | Service | Requested at | Due at | Status | |
|---|---|---|---|---|---|---|
| Rack installation | Jonah Brooks | Customer application hosting | 16 Oct | 25 Oct | Submitted | |
| Cross-connect request | Luis Romero | Private network transit | 25 Oct | 02 Nov | Submitted | |
| Power capacity review | Omar Haddad | Monitoring and alerts | 28 Oct | 02 Nov | Submitted | |
| Remote hands support | Omar Haddad | Identity access platform | 11 Oct | 19 Oct | Submitted | |
| Asset removal | Ravi Shah | Customer application hosting | 26 Oct | 03 Nov | Submitted |
Track service root causes and the outcome of received external events.
Problems
Service request to completed work ships ready to use. One step needs a named approval before the work moves on: Request approval (Request Coordinator).
Confirm the owned service and the equipment involved.
Record requester, type, service and due date.
The Request Coordinator decides whether work may proceed.
The technician begins approved work.
Record the actual finish of work.
Compare the outcome with the service and original request.
Open any incident to see its cable connections, the roles that work on it, its process stages and its approvals on one page.
Status, Service, Asset and Assigned to.
Each line is linked to this incident.
Admin, Service Manager and Incident Coordinator, each with their own permissions.
Incident intake and Incident acknowledgment, with the role that acts.
Request approval, with who decides.
Virtual machine cluster · Low
| Cable ID | From port | To port |
|---|---|---|
| FIB-A12-B04-01 | A12-SW1 Eth1/1 | B04-SW1 Eth1/12 |
| FIB-A12-B04-02 | B04-SW2 Eth1/8 | A12-SW2 Eth1/2 |
| COP-C07-D02-01 | C07-ST1 Port 2 | D02-BK1 Port 4 |
Signed in as Request Coordinator
| Decision | Approver | |
|---|---|---|
| Request approvalThe Request Coordinator decides whether work may proceed. | Request Coordinator | |
| Approve service requests | Request Coordinator |
Everyone opens Data Center Management to the work that is theirs. Pick a role to see what it starts with.
Configures access, references and imports across the app.
Owns service records and reviews operational outcomes.
This is the first screen this role sees.
Changes · Service Manager
| Summary | Status | Scheduled start | Scheduled end | Service | Risk | |
|---|---|---|---|---|---|---|
| Replace Rack B11 PDU | Approved | 24 Oct | 28 Oct | Managed firewall service | Low | |
| Investigate east fabric loss | Implementing | 15 Oct | 19 Oct | Private network transit | Medium | |
| Restore failed backup disk | Approved | 24 Oct | 30 Oct | Monitoring and alerts | High | |
| Tune west aisle cooling | Implementing | 24 Oct | 26 Oct | Identity access platform | Low | |
| Patch firewall pair | Approved | 01 Nov | 04 Nov | Backup storage platform | Medium |
Triage owner for affected services and assets.
This is the first screen this role sees.
Incidents · Incident Coordinator
Records assigned response, rack and cable work.
This is the first screen this role sees.
Changes · Service Technician
| Summary | Status | Scheduled start | Scheduled end | Service | Risk | |
|---|---|---|---|---|---|---|
| Replace Rack B11 PDU | Approved | 24 Oct | 28 Oct | Managed firewall service | Low | |
| Investigate east fabric loss | Implementing | 15 Oct | 19 Oct | Private network transit | Medium | |
| Restore failed backup disk | Approved | 24 Oct | 30 Oct | Monitoring and alerts | High | |
| Tune west aisle cooling | Implementing | 24 Oct | 26 Oct | Identity access platform | Low | |
| Patch firewall pair | Approved | 01 Nov | 04 Nov | Backup storage platform | Medium |
Reviews planned changes and their recorded controls.
This is the first screen this role sees.
Changes · Change Manager
| Summary | Status | Scheduled start | Scheduled end | Service | Risk | |
|---|---|---|---|---|---|---|
| Replace Rack B11 PDU | Approved | 24 Oct | 28 Oct | Managed firewall service | Low | |
| Investigate east fabric loss | Implementing | 15 Oct | 19 Oct | Private network transit | Medium | |
| Restore failed backup disk | Approved | 24 Oct | 30 Oct | Monitoring and alerts | High | |
| Tune west aisle cooling | Implementing | 24 Oct | 26 Oct | Identity access platform | Low | |
| Patch firewall pair | Approved | 01 Nov | 04 Nov | Backup storage platform | Medium |
Reviews submitted requests and follows delivery.
This is the first screen this role sees.
Service requests · Request Coordinator
| Request type | Requester | Service | Requested at | Due at | Status | |
|---|---|---|---|---|---|---|
| Rack installation | Jonah Brooks | Customer application hosting | 16 Oct | 25 Oct | Submitted | |
| Cross-connect request | Luis Romero | Private network transit | 25 Oct | 02 Nov | Submitted | |
| Power capacity review | Omar Haddad | Monitoring and alerts | 28 Oct | 02 Nov | Submitted | |
| Remote hands support | Omar Haddad | Identity access platform | 11 Oct | 19 Oct | Submitted | |
| Asset removal | Ravi Shah | Customer application hosting | 26 Oct | 03 Nov | Submitted |
Maintains equipment and placement context.
This is the first screen this role sees.
Assets · Asset Manager
Review incident load, planned work, rack power and event outcomes.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Open | 41 | ||
| Acknowledged | 29 | 71% | |
| Investigating | 17 | 59% | |
| Resolved | 10 | 59% |
Sample counts per stage
Count incidents by priority and status for each affected service.
Compare incident opening and acknowledgment dates by service and assignee.
Group open and investigating incidents by service, asset and assigned person.
List approved and implementing changes with their scheduled start and end dates.
Compare requested, due and completed dates by service and request type.
List recorded power by rack code, unit start and linked asset.
Group cable identities and ports under their linked incident.
Compare open, investigating and known-error problems by service and owner.
Count integration receipts by provider and receipt status.
See how Data Center Management fits your kind of team.
Each stage of service request to completed work names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Prepare service operations review with the people responsible for each decision.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Name the services in scope, their owners, criticality and the Request Coordinator who approves requests and the Change Manager who checks planned work.
Compare asset tags, serial numbers and locations with the physical equipment. Agree rack code, port label and power conventions.
Add people and services first, then assets, rack positions and a sample incident with updates and cable work.
Run a submitted request through approval and completion. Review a complete and incomplete change plan. Check an incident with missing priority and an already advanced case.
If a source sends events, reconcile provider and external identity across received, applied, rejected and failed receipts.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Data Center Management for your business. Pilot one owned service, a known set of tagged assets, an incident and a request with named decision owners.
Rack positions hold a rack code, starting unit, occupied height, power and linked asset. Cable connections hold endpoints, cable identity, type, installation date and a linked incident.
Yes. An incident links to a service, asset and assigned person. Dated updates retain their author and incident reference.
The Request Coordinator reviews submitted work. Approved requests can enter delivery; in-progress requests can be completed with the actual finish date.
A change in review needs risk, a scheduled start and end, and a rollback plan. The Change Manager reviews the planned work for the affected service.
A problem record keeps the service, owner, statement, root cause and investigation state. It sits alongside the immediate incident response.
Integration receipts retain the provider, external event identity, received date, payload hash and processing state. Agree the sender and event mapping during setup.
Yes, after agreeing stable asset tags, service references, location text and the source of each value. Reconcile a pilot group against physical labels.
Give authorized Service Technicians access to those screens and check their submissions against the linked asset or incident and observed values.
Use the pricing page for the current platform policy and plan any imports, connections and agent usage during implementation.
Start free, then use Proto to change fields, steps and approvals before your team goes live.