1. E-library / Digital Repository
  2. Features
  3. Content intake
Feature · Content intake

Content intake

Register content against the right organization, project and owner.

OverviewSubmitted revisions
E-library / Digital Repository · Content intake

Submitted revisions

Verified waits for the digital repository reviewer

New
NumberTitleRevisionOwnerSubmitted date
CI-25251Submitted ci-1063008 Oct
CI-74516Submitted ci-10148020 Oct
CI-87274Submitted ci-5677012 Oct
CI-24096Submitted ci-85447025 Oct
CI-27806Submitted ci-30492011 Oct
6 of 6 records
Submitted ci-106Content items · CI-25251
Revision30
Submitted date08 Oct
Example screen with sample data

What you can do

Give each content item a clear home

An operator opens a content item for a specific project and organization. The item number and title identify the record the team will review; the assigned owner is responsible for preparing it. Start it as Draft, then use the Content Items and Details workspace to keep its status and revision visible alongside the work. A title alone is a poor handoff. The project tells the reviewer which collection definition applies, and the organization establishes the operational scope.

A typical case is a digitized thesis assigned to a repository project. The operator records its number, title, submitting date and owner, then begins the requirement lines and evidence files. The reviewer can open the selected item from the board and inspect its current revision without searching across separate lists. If a later correction is needed, the original item remains the point of reference.

How the work is organized

  • One item per submission. The item connects its project, organization, owner and supporting work.
  • Visible revision. A decision belongs to the revision it reviewed, so an amended item cannot silently inherit an earlier approval.
  • Recorded status. Draft, Submitted, Verified, Decided and Delivered give the team an agreed reading of progress.

What to agree during setup

Decide how item numbers are assigned and how a submission is matched to a project. Agree which organization owns each project and which operator may prepare its items. Establish when a title or source reference is sufficient to create the draft, and when the operator should wait for the underlying document. Map existing repository identifiers before importing open work so the same item is not opened under several numbers.

Agree who checks that an item is ready to submit. A draft can be useful while evidence is being gathered; submission is the handoff to independent review. The selected project’s policy reference gives the reviewer context for that decision. Prepare a case with incomplete evidence as well as a complete case, so the distinction is clear to the team.

Check the handoff on an actual case

The operator creates a thesis item under an active project and assigns an owner. A supporting file arrives later. The operator attaches it and completes the associated requirement line, then submits the revision. The reviewer opens the submitted item, confirms the title and project, and checks that the requirement and file refer to the same source. If a correction changes the material, the revised item needs its own review decision. The history should show the path without erasing the earlier work.

What your team sees

  • Content intake board — Items grouped by their working status, with owner, project and revision visible.
  • My content items — The operator’s assigned records for preparation and follow-up.
  • Submitted revisions — Items ready for the reviewer to inspect.

Follow the work through

Content intake to decision follows the submission and review handoff. Correction and supersession covers a changed revision.

What it keeps track of

Data model
Content items
Content items submitted for a project and tracked through draft, review, approval and delivery.
Projects
Repository projects and collection definitions offered by an organization.
Organizations
Agencies, departments and repository organizations that own projects and content items.
People
Staff, officers, reviewers and assigned team members.
State history
Immutable workflow-written status transition history for each content item.

Who uses it

Permissions
Digital Repository Operator
Prepares the item; Digital Repository Reviewer examines submitted work; Digital Repository Administrator maintains the project definition.

Set up E-library / Digital Repository your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started