All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

Environmental Conservation · Available now

Conservation management for sites and field evidence.

Environmental Conservation keeps a site register, surveyed habitat boundaries, restoration cycles and the field work attached to them. A conservation manager selects a site and plans a cycle.

  • No per-user fees
  • Manual work is free
  • Configure it in Proto
OverviewTasks Awaiting Approval
Environmental Conservation · Field tasks

Tasks Awaiting Approval

approval waits for the conservation manager

New field task
Field tasks in view
6
Planting
2
Irrigation
1
Feeding
1
Task typeSiteCycleAssigned toDue dateStatus
PlantingWillow Bend marshPine Hollow stream repair, 2026Mara Velez14 NovPlanned
IrrigationNorth Fork riparian corridorPine Hollow stream repair, 2026Sofia Rahman23 NovPlanned
FeedingCedar Hollow wet meadowPine Hollow stream repair, 2026Mara Velez13 NovPlanned
InspectionPine Hollow headwatersJuniper Ridge native seeding, fall 2026Owen Mercer05 NovPlanned
HarvestWillow Bend marshWillow Bend reed removal, spring 2026Priya Sen24 NovPlanned
6 of 6 records
Willow Bend marshField tasks · FT-99112
Planting
CyclePine Hollow stream repair, 2026
Assigned toMara Velez
Due date14 Nov
StatusPlanned
Task approvalFT-99112 · Willow Bend marsh

Conservation Manager decides whether the planned field task can begin.

Waiting for Conservation Manager
ApproveReturn
Example screen with sample data
Tables, ready to use
11
Saved views
12
Roles with set permissions
6
Reports and dashboards
8
Features

Work from the site record

Every feature works on the same records. Pick one to see the screen your team works in.

Sites and habitats

Keep each conservation location connected to its surveyed boundary and area.

  • Site identity
  • Availability
  • Survey evidence
  • Sites
  • Habitat sites
  • Observations
  • Restoration cycles
Explore sites and habitats
OverviewHabitat Survey Register
Environmental Conservation · Sites and habitats

Habitat Survey Register

Habitat sites

New
SiteSurvey dateArea hectaresGeo JSON
Pine Hollow headwaters05 Nov430willow-bend-boundary.geojson
Redbank floodplain06 Nov490north-fork-transects.geojson
Willow Bend marsh16 Nov410juniper-ridge-plots.geojson
Willow Bend marsh16 Nov400cedar-hollow-wetland.geojson
Redbank floodplain17 Nov600heron-flats-shore.geojson
6 of 6 records
willow-bend-boundary.geojsonHabitat sites · HS-68879
SitePine Hollow headwaters
Survey date05 Nov
Area hectares430
Example screen with sample data
Process

Follow restoration through review

Site restoration to reviewed finding ships ready to use. 2 steps need a named approval before the work moves on: Task approval (Conservation Manager) and Finding review (Finding Reviewer).

Drag a card to another stage, or focus it and use the arrow keys. It updates to match the stage.

  1. Site selection

    Check the site's location and availability before planning work.

    Willow Bend marshFT-99112 · Conservation Manager
    Site selectionBy Conservation Manager
  2. Cycle plan

    Name the restoration effort and expected completion for that site.

    Willow Bend marshFT-99112 · Conservation Manager
    Cycle planBy Conservation Manager
  3. Task approval

    Conservation Manager reviews the planned assignment and field conditions.

    Willow Bend marshFT-99112 · Conservation Manager
    Task approvalBy Conservation Manager
    ApprovalConservation Manager decides whether the planned field task can begin.
  4. Field execution

    Field Operator records progress, completion and any treatment used.

    Willow Bend marshFT-99112 · Field Operator
    Field executionBy Field Operator
  5. Finding review

    Finding Reviewer checks the measured quantity and linked cycle.

    Willow Bend marshFT-99112 · Finding Reviewer
    Finding reviewBy Finding Reviewer
    ApprovalFinding Reviewer decides whether the finding is accepted for its cycle.
  6. Cycle close

    Conservation Manager reviews work and accepted findings before recording completion.

    Willow Bend marshFT-99112 · Conservation Manager
    Cycle closeBy Conservation Manager
Inside a record

Connect field evidence

Open any field task to see the roles that work on it, its process stages and its approvals on one page.

  1. 1
    Record details

    Cycle, Assigned to, Due date and Status.

  2. 2
    Linked records

    Records linked to this field task.

  3. 3
    Who works on it

    Conservation Manager, Field Operator and Stock Custodian, each with their own permissions.

  4. 4
    Process stages

    Task planning, with the role that acts.

  5. 5
    Approvals

    Task approval and Finding review, with who decides.

Tasks Awaiting ApprovalWillow Bend marsh
Environmental Conservation · Field tasks

Willow Bend marsh

Pine Hollow stream repair, 2026 · Planting

Log activity
1
Record details
CyclePine Hollow stream repair, 2026
Assigned toMara Velez
Due date14 Nov
StatusPlanned
3

Who works on it

  • Conservation ManagerManage Sites, restoration cycles, field tasks
  • Field OperatorManage field tasks, treatment usage
  • Stock CustodianManage treatment stocks, treatment usage, treatment applications
4

Process stages

  • Task planningConservation Manager
5

Approvals

  • Task approvalConservation Manager
    Approved
  • Finding reviewFinding Reviewer
    Waiting
Example screen with sample data
Approvals

Name the field decision

OverviewApprovals
Environmental Conservation · Overview

Approvals

Signed in as Conservation Manager

Waiting for you

4 To review1 Overdue2 Decided todayOnly mine
0 selectedApproveReturn
  • FT-99112Willow Bend marsh
    Pine Hollow stream repair, 2026Requested by Mara Velez
    Planting2dActions
  • FT-41963North Fork riparian corridor
    Pine Hollow stream repair, 2026Requested by Sofia Rahman
    Irrigation2dActions
  • FT-87120Cedar Hollow wet meadow
    Pine Hollow stream repair, 2026Requested by Mara Velez
    Feeding2dActions
  • FT-19546Pine Hollow headwaters
    Juniper Ridge native seeding, fall 2026Requested by Owen Mercer
    Inspection6dActions

Who approves what

DecisionApprover
Task approvalConservation Manager reviews the planned assignment and field conditions.Conservation Manager
Finding reviewFinding Reviewer checks the measured quantity and linked cycle.Finding Reviewer
Approve field tasksConservation Manager
Approve FindingsFinding Reviewer
4 approval rules · set per role in Proto
Example screen with sample data
Roles

A workspace for each role

Everyone opens Environmental Conservation to the work that is theirs. Pick a role to see what it starts with.

Conservation Manager

Owns site availability, restoration plans and task approval.

This is the first screen this role sees.

OverviewApproved Field Work

Approved Field Work

Field tasks · Conservation Manager

Planting2
Cedar Hollow wet meadowWillow Bend reed removal, spring 2026
14 Nov
Willow Bend marshCedar Hollow wetland recovery, 2026
08 Nov
Add
Irrigation1
Juniper Ridge grasslandPine Hollow stream repair, 2026
05 Nov
Add
Feeding1
Juniper Ridge grasslandRedbank invasive control, 2026
23 Nov
Add
Inspection1
Juniper Ridge grasslandStone Creek oak regeneration, 2026
20 Nov
Add
Harvest1
Cedar Hollow wet meadowPine Hollow stream repair, 2026
15 Nov
Add
Example screen with sample data
Reports

Read the measured result

Review site availability, cycle progress, field work and measured evidence.

Overview
Environmental Conservation · Overview

Environmental Conservation dashboard

This quarter

Restoration cycles in view
6
In Progress
2
Establishing
2
Closing
2

Field tasks by status

How far records got this quarter

StageReachedStep
Planned37
Approved2259%
In progress1568%
Completed1173%

Number of field tasks by status

Sample counts per stage

600
30Planned
20Approved
60In progress
40Completed
30Cancelled
Example screen with sample data
  1. 01Site availability

    Which locations are ready for work, resting or restricted?

  2. 02Restoration cycle progress

    Group cycles by Status and compare planned and actual completion dates.

  3. 03Task completion

    Compare field tasks by task type, assigned to and Status.

  4. 04Habitat survey area

    Compare habitat sites area hectares by Site and survey date.

  5. 05Observation measures

    Review Value and Unit by Site, observation type and observed at.

  6. 06Finding quantities by reviewer

    Group Findings Quantity and Unit by Cycle and accepted by.

  7. 07Treatment stock position

    Review quantity on hand, Unit and expiry date by treatment name and lot number.

  8. 08Treatment use by task

    Group treatment usage Quantity by Task and Treatment lot.

Controls

Keep references and units sound

Each stage of site restoration to reviewed finding names the role that acts and the status it records, so a change is never anonymous.

OverviewSite restoration to reviewed finding
Environmental Conservation · Process

Site restoration to reviewed finding

Each stage, the role that acts and the status it records

Process stages
9
Approval steps
2
Roles involved
4
Tables touched
6
Task approvalApproval
Conservation Manager
StatusPlanned → Approved
RecordsSites
Field execution
Field Operator
StatusApproved → in progress → Completed
Cycle close
Conservation Manager
StatusClosing → Closed
RecordsFindings
Site restoration to reviewed finding
  1. Start
    Task approvalPlanned → Approved
    Sites
  2. Step
    Field executionApproved → in progress → Completed
    Field Operator
  3. Approval
    Finding reviewFinding Reviewer
    Findings
  4. Step
    Cycle closeClosing → Closed
    Findings
Example screen with sample data
AI agent

Prepare reviews with Proto

Prepare site work and review conservation evidence with Proto.

It can

  • Conservation Manager: Show planned tasks by site and cycle before the approval meeting.
  • Habitat Surveyor: Compare dated survey areas and recent observations for a selected site.
  • Finding Reviewer: List findings with their cycle, recorded date, quantity, unit and condition for review.
  • Stock Custodian: Group lots by expiry date and show quantity on hand beside task use.

Stays with a person

  • The manager approves site work and the reviewer accepts findings.
  • A generated summary cannot stand in for checking the live site, cycle, lot or measured record.
  • Use the signed-in person's permissions and preserve who made each decision.
  • Ask a human to resolve an ambiguous unit, source reference or boundary before changing an operating record.
Integrations

Connects to the tools you use

Set up connections through ERP.AI and Proto workflows, with every change logged.

  • Environmental Conservation
  • Mapping source
  • Identity provider
  • Treatment purchasing
  • Field capture
Data model

Your data, in tables you can change

Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.

Browse all 11 tables
11tables
  • Sites and habitats4
  • Restoration cycles4
  • Field tasks6
  • Observations and findings5
  • Treatments6
  • People and access5
Implementation

Roll out one team at a time

Start with one team and one process, then add the rest once the basics are running.

  1. Agree the site scope

    Choose a location, its field code, availability and survey source. Name the manager, surveyor, operator and finding reviewer.

  2. Map the records

    Connect people to user accounts, surveys to sites, tasks to cycles and treatment use to lots. Keep units and dates with measurements.

  3. Configure a bounded pilot

    Start one site cycle with a surveyed boundary, planned task and expected completion.

  4. Rehearse decisions

    Check an unavailable site, expired stock lot, wrong unit, duplicate use request and finding with a missing unit. Confirm the decision returns to the appropriate person.

  5. Reconcile and release

    Compare the source site and lot balances with accepted records. Review access from each role and retain a copy of the original import before opening further sites.

Pricing

$0per user

The base account and everyday work in the ERP.AI app are free, for every user.

  • No per-user or per-seat fees
  • Viewing, editing, approving and exporting records in the app is free
  • Pay only for machine work: API calls, imports, workflows and AI agents
  • Prepaid credits from $5. Purchased credits never expire

Pricing details

Machine work rate card Included per $1

Machine work rate card
UsagePer $1
Record reads (list, filter, get)20,000
Search or aggregate queries4,000
Record writes4,000
Imported or synced records200,000
Workflow runs2,000
AI agent runs2,000
Scheduled jobs or webhooks20,000
File uploads (MB)2,000
CSV or PDF exports100
FAQ

Questions, answered

Scope, rollout and pricing for Environmental Conservation.

All questions
How do I get started?

Click Get started, then use Proto to configure Environmental Conservation for your business. Pilot one site, a surveyed boundary and a planned restoration cycle with a reviewed field task.

Can we keep more than one survey for a site?

Yes. Habitat records carry the linked site, survey date, geometry and measured area. Keep each dated capture available when comparing boundaries.

How are field tasks assigned?

Each task links a site, restoration cycle and named person, with task type, due date and status. The manager reviews planned work before approval.

Can operators see their own work?

Use the Field Tasks by Assignee view to locate approved and ongoing work by named person. Test access with a linked user and person account during setup.

What is the difference between an observation and a finding?

An observation is a dated site scouting measure with notes. A finding belongs to a restoration cycle and carries the quantity, unit, condition and accepting person used for review.

How is treatment use traced?

A use record links a stock lot to the field task and records the consumed quantity and date. A site application separately names the applicator and treatment at the site.

Can we track stock expiry?

The stock lot records expiry, unit and quantity on hand. The custodian checks those values before approving material for field work.

Can we import existing site data?

Prepare stable site identities, survey dates, boundary geometry, people and units. Rehearse a small import and inspect its links before adding more sites.

Who decides a finding is accepted?

The named Finding Reviewer checks the linked cycle, recorded date, quantity, unit and condition, then records their acceptance through the person reference.

What drives the cost?

Review the current pricing page for ordinary work and metered agent, import or integration activity. Scope implementation around the sites and field processes you plan to use.

Set up Environmental Conservation your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appEnvironmental Conservation

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.