Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Environmental Conservation
- Mapping source
- Identity provider
- Treatment purchasing
- Field capture
Environmental Conservation keeps a site register, surveyed habitat boundaries, restoration cycles and the field work attached to them. A conservation manager selects a site and plans a cycle.
approval waits for the conservation manager
| Task type | Site | Cycle | Assigned to | Due date | Status | |
|---|---|---|---|---|---|---|
| Planting | Willow Bend marsh | Pine Hollow stream repair, 2026 | Mara Velez | 14 Nov | Planned | |
| Irrigation | North Fork riparian corridor | Pine Hollow stream repair, 2026 | Sofia Rahman | 23 Nov | Planned | |
| Feeding | Cedar Hollow wet meadow | Pine Hollow stream repair, 2026 | Mara Velez | 13 Nov | Planned | |
| Inspection | Pine Hollow headwaters | Juniper Ridge native seeding, fall 2026 | Owen Mercer | 05 Nov | Planned | |
| Harvest | Willow Bend marsh | Willow Bend reed removal, spring 2026 | Priya Sen | 24 Nov | Planned |
Conservation Manager decides whether the planned field task can begin.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep each conservation location connected to its surveyed boundary and area.
Habitat sites
| Site | Survey date | Area hectares | Geo JSON | |
|---|---|---|---|---|
| Pine Hollow headwaters | 05 Nov | 430 | willow-bend-boundary.geojson | |
| Redbank floodplain | 06 Nov | 490 | north-fork-transects.geojson | |
| Willow Bend marsh | 16 Nov | 410 | juniper-ridge-plots.geojson | |
| Willow Bend marsh | 16 Nov | 400 | cedar-hollow-wetland.geojson | |
| Redbank floodplain | 17 Nov | 600 | heron-flats-shore.geojson |
Plan and follow a site's restoration work through close.
Field tasks
| Task type | Site | Cycle | Assigned to | Due date | Status | |
|---|---|---|---|---|---|---|
| Planting | Willow Bend marsh | Cedar Hollow wetland recovery, 2026 | Owen Mercer | 07 Nov | Planned | |
| Irrigation | Stone Creek oak grove | North Fork bank stabilization, 2026 | Sofia Rahman | 17 Nov | Approved | |
| Feeding | Redbank floodplain | Pine Hollow stream repair, 2026 | Tomas Ibarra | 17 Nov | In progress | |
| Inspection | Willow Bend marsh | Juniper Ridge native seeding, fall 2026 | Sofia Rahman | 08 Nov | Completed | |
| Harvest | Stone Creek oak grove | Pine Hollow stream repair, 2026 | Jun Park | 09 Nov | Planned |
Assign and approve work against a site and restoration cycle.
Treatment stocks
| Treatment name | Lot number | Quantity on hand | Unit | Expiry date | |
|---|---|---|---|---|---|
| Native sedge plugs, 72-cell tray | L26-0849 | 460 | square meters | 06 Nov | |
| Willow stakes, 18-inch bundle | L26-1722 | 910 | hectares | 13 Nov | |
| Erosion blanket, coir roll | L26-9384 | 80 | centimeters | 11 Nov | |
| Pollinator seed mix, 25 lb bag | L26-2983 | 900 | stems | 05 Nov | |
| Tree shelter sleeves, 4 ft | L26-9168 | 850 | kilograms | 10 Nov |
Separate site scouting notes from reviewed restoration findings.
Observations
| Site | Observed at | Observation type | Value | Unit | Notes | |
|---|---|---|---|---|---|---|
| Pine Hollow headwaters | 15 Nov | Vegetation cover | 770 | square meters | Sedge cover improved along the east transect | |
| Redbank floodplain | 14 Nov | Water depth | 690 | hectares | Recheck bank edge after the next storm | |
| Willow Bend marsh | 09 Nov | Bird activity | 90 | centimeters | Fresh willow growth at three sample points | |
| Redbank floodplain | 11 Nov | Soil moisture | 680 | stems | Remove new reed shoots near the culvert | |
| North Fork riparian corridor | 11 Nov | Bank erosion | 780 | kilograms | Standing water remains in the lower basin |
Connect stocked treatment lots to task use and site applications.
Field tasks
Tie assignments, applications and finding review to named people.
Findings
| Cycle | Recorded at | Quantity | Unit | Condition | Accepted by | |
|---|---|---|---|---|---|---|
| Redbank invasive control, 2026 | 15 Nov | 390 | square meters | Stable bank | Anika Shah | |
| Pine Hollow stream repair, 2026 | 12 Nov | 330 | hectares | Moderate erosion | Nadia Okafor | |
| Pine Hollow stream repair, 2026 | 16 Nov | 940 | centimeters | Dense native cover | Tomas Ibarra | |
| Stone Creek oak regeneration, 2026 | 10 Nov | 820 | stems | Sparse regeneration | Tomas Ibarra | |
| North Fork bank stabilization, 2026 | 05 Nov | 630 | kilograms | Seasonal inundation | Anika Shah |
Site restoration to reviewed finding ships ready to use. 2 steps need a named approval before the work moves on: Task approval (Conservation Manager) and Finding review (Finding Reviewer).
Check the site's location and availability before planning work.
Name the restoration effort and expected completion for that site.
Conservation Manager reviews the planned assignment and field conditions.
Field Operator records progress, completion and any treatment used.
Finding Reviewer checks the measured quantity and linked cycle.
Conservation Manager reviews work and accepted findings before recording completion.
Open any field task to see the roles that work on it, its process stages and its approvals on one page.
Cycle, Assigned to, Due date and Status.
Records linked to this field task.
Conservation Manager, Field Operator and Stock Custodian, each with their own permissions.
Task planning, with the role that acts.
Task approval and Finding review, with who decides.
Pine Hollow stream repair, 2026 · Planting
Signed in as Conservation Manager
| Decision | Approver | |
|---|---|---|
| Task approvalConservation Manager reviews the planned assignment and field conditions. | Conservation Manager | |
| Finding reviewFinding Reviewer checks the measured quantity and linked cycle. | Finding Reviewer | |
| Approve field tasks | Conservation Manager | |
| Approve Findings | Finding Reviewer |
Everyone opens Environmental Conservation to the work that is theirs. Pick a role to see what it starts with.
Owns site availability, restoration plans and task approval.
This is the first screen this role sees.
Field tasks · Conservation Manager
Carries out assigned site tasks and records work performed.
This is the first screen this role sees.
Field tasks · Field Operator
Maintains surveyed boundaries and dated site observations.
This is the first screen this role sees.
Sites · Habitat Surveyor
Checks measured findings against the linked cycle and accepts them.
This is the first screen this role sees.
Restoration cycles · Finding Reviewer
Maintains treatment lot quantities and reconciles use against approved work.
This is the first screen this role sees.
Treatment stocks · Stock Custodian
| Treatment name | Lot number | Quantity on hand | Unit | Expiry date | |
|---|---|---|---|---|---|
| Native sedge plugs, 72-cell tray | L26-0849 | 460 | square meters | 06 Nov | |
| Willow stakes, 18-inch bundle | L26-1722 | 910 | hectares | 13 Nov | |
| Erosion blanket, coir roll | L26-9384 | 80 | centimeters | 11 Nov | |
| Pollinator seed mix, 25 lb bag | L26-2983 | 900 | stems | 05 Nov | |
| Tree shelter sleeves, 4 ft | L26-9168 | 850 | kilograms | 10 Nov |
Sets up people, user access and operating permissions.
Review site availability, cycle progress, field work and measured evidence.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 37 | ||
| Approved | 22 | 59% | |
| In progress | 15 | 68% | |
| Completed | 11 | 73% |
Sample counts per stage
Which locations are ready for work, resting or restricted?
Group cycles by Status and compare planned and actual completion dates.
Compare field tasks by task type, assigned to and Status.
Compare habitat sites area hectares by Site and survey date.
Review Value and Unit by Site, observation type and observed at.
Group Findings Quantity and Unit by Cycle and accepted by.
Review quantity on hand, Unit and expiry date by treatment name and lot number.
Group treatment usage Quantity by Task and Treatment lot.
See how Environmental Conservation fits your kind of team.
Each stage of site restoration to reviewed finding names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Prepare site work and review conservation evidence with Proto.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
Choose a location, its field code, availability and survey source. Name the manager, surveyor, operator and finding reviewer.
Connect people to user accounts, surveys to sites, tasks to cycles and treatment use to lots. Keep units and dates with measurements.
Start one site cycle with a surveyed boundary, planned task and expected completion.
Check an unavailable site, expired stock lot, wrong unit, duplicate use request and finding with a missing unit. Confirm the decision returns to the appropriate person.
Compare the source site and lot balances with accepted records. Review access from each role and retain a copy of the original import before opening further sites.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Environmental Conservation for your business. Pilot one site, a surveyed boundary and a planned restoration cycle with a reviewed field task.
Yes. Habitat records carry the linked site, survey date, geometry and measured area. Keep each dated capture available when comparing boundaries.
Each task links a site, restoration cycle and named person, with task type, due date and status. The manager reviews planned work before approval.
Use the Field Tasks by Assignee view to locate approved and ongoing work by named person. Test access with a linked user and person account during setup.
An observation is a dated site scouting measure with notes. A finding belongs to a restoration cycle and carries the quantity, unit, condition and accepting person used for review.
A use record links a stock lot to the field task and records the consumed quantity and date. A site application separately names the applicator and treatment at the site.
The stock lot records expiry, unit and quantity on hand. The custodian checks those values before approving material for field work.
Prepare stable site identities, survey dates, boundary geometry, people and units. Rehearse a small import and inspect its links before adding more sites.
The named Finding Reviewer checks the linked cycle, recorded date, quantity, unit and condition, then records their acceptance through the person reference.
Review the current pricing page for ordinary work and metered agent, import or integration activity. Scope implementation around the sites and field processes you plan to use.
Start free, then use Proto to change fields, steps and approvals before your team goes live.