All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

Factory Energy Management · Available now

Trace factory energy from meter observations to production use.

Factory Energy Management organizes factory energy observations around sites and their meters. Meter Operators capture readings with a quality flag, while the Energy Manager reviews their validity before using consumption intervals in operating analysis.

  • No per-user fees
  • Manual work is free
  • Configure it in Proto
OverviewInterval Review
Factory Energy Management · Energy intervals

Interval Review

Energy intervals in one list

New energy interval
Energy intervals in view
6
Total energy quantity
3,060
Received
3
Validated
2
Received3
Interval 2026-04-18 08:00Process water flow meter
710
15 Oct
Task 2026-0217Main plant electricity meter
530
14 Oct
Tariff 2026-Q2Boiler house gas meter
140
20 Oct
Add
Validated2
Event 2026-0418Assembly hall electricity meter
640
19 Oct
Reading 2026-0418-01Process water flow meter
700
30 Oct
Add
Rejected1
Allocation 2026-0418Boiler house gas meter
340
30 Oct
Add
Interval 2026-04-18 08:00Energy intervals · EI-52876
Received
MeterProcess water flow meter
Starts at15 Oct
Ends at17 Oct
Energy quantity710
Unitkilowatt-hours
Review readingsEI-52876 · Interval 2026-04-18 08:00

Energy Manager approves the use of a reading after reviewing its quality and validation result.

Waiting for Energy Manager
ApproveReturn
Example screen with sample data
Tables, ready to use
11
Saved views
14
Roles with set permissions
7
Reports and dashboards
8
Features

Follow factory energy through the working records

Every feature works on the same records. Pick one to see the screen your team works in.

Metering and Readings

Give every observation a known meter, a reading time and an explicit quality assessment.

  • Meter identity
  • Observation quality
  • Reviewer decision
  • Sites
  • Meters
  • Meter readings
  • People
  • Users
Explore metering and readings
OverviewMeter Reading Review
Factory Energy Management · Metering and Readings

Meter Reading Review

Meter readings

New
IdMeterRead atValueQuality flagValidation status
Interval 2026-04-18 08:00Press line electricity meter15 Oct600ValidValid
Event 2026-0418Compressed air flow meter25 Oct120EstimatedValid
Task 2026-0217Compressed air flow meter17 Oct430MissingValid
Reading 2026-0418-01Press line electricity meter28 Oct70InvalidValid
Tariff 2026-Q2Main plant electricity meter14 Oct430ValidValid
6 of 6 records
Interval 2026-04-18 08:00Meter readings · MR-98238
Valid
MeterPress line electricity meter
Read at15 Oct
Value600
Validation statusValid
Validation notesReading matches meter register
Example screen with sample data
Process

From observations to reviewed energy use

From meter observation to reviewed energy use ships ready to use. 2 steps need a named approval before the work moves on: Review readings (Energy Manager) and Authorize maintenance (Maintenance Coordinator).

Drag a card to another stage, or focus it and use the arrow keys. It updates to match the stage.

  1. Capture readings

    Record meter observations with the actual reading time and a clear quality flag.

    Interval 2026-04-18 08:00EI-52876 · Meter Operator
    Capture readingsBy Meter Operator
  2. Review readings

    Energy Manager reviews the evidence and decides whether the observation can support consumption review.

    Interval 2026-04-18 08:00EI-52876 · Energy Manager
    Review readingsBy Energy Manager
    ApprovalEnergy Manager approves the use of a reading after reviewing its quality and validation result.
  3. Validate intervals

    Check actual consumption boundaries and units before accepting an interval for analysis.

    Interval 2026-04-18 08:00EI-52876 · Energy Manager
    Validate intervalsBy Energy Manager
  4. Authorize maintenance

    Maintenance Coordinator reviews the site task and assigned person before work starts.

    Interval 2026-04-18 08:00EI-52876 · Maintenance Coordinator
    Authorize maintenanceBy Maintenance Coordinator
    ApprovalMaintenance Coordinator approves the assigned site task and its due date before work proceeds.
  5. Allocate production energy

    Attribute energy to a recognizable work order reference with an actual period and stated method.

    Interval 2026-04-18 08:00EI-52876 · Cost Analyst
    Allocate production energyBy Cost Analyst
  6. Review emission factors

    Check event-linked factors against their effective date and cited source.

    Interval 2026-04-18 08:00EI-52876 · Sustainability Analyst
    Review emission factorsBy Sustainability Analyst
Inside a record

Connect the sources behind your energy review

Open any energy interval to see the roles that work on it, its process stages and its approvals on one page.

  1. 1
    Record details

    Meter, Starts at, Ends at and Energy quantity.

  2. 2
    Linked records

    Records linked to this energy interval.

  3. 3
    Who works on it

    Admin, Energy Manager and Meter Operator, each with their own permissions.

  4. 4
    Process stages

    Validate intervals and Review energy costs, with the role that acts.

  5. 5
    Approvals

    Review readings and Authorize maintenance, with who decides.

Interval ReviewInterval 2026-04-18 08:00
Factory Energy Management · Energy intervals

Interval 2026-04-18 08:00

Process water flow meter · Received

Log activity
1
Record details
MeterProcess water flow meter
Starts at15 Oct
Ends at17 Oct
Energy quantity710
3

Who works on it

  • AdminManage Users, People, Sites, Meters
  • Energy ManagerManage energy intervals, operational events
  • Meter OperatorManage meter readings
4

Process stages

  • Validate intervalsEnergy Manager
  • Review energy costsEnergy Manager, Cost Analyst
5

Approvals

  • Review readingsEnergy Manager
    Approved
  • Authorize maintenanceMaintenance Coordinator
    Waiting
Example screen with sample data
Approvals

Keep operating decisions with the responsible person

OverviewApprovals
Factory Energy Management · Overview

Approvals

Signed in as Energy Manager

Waiting for you

4 To review1 Overdue2 Decided todayOnly mine
0 selectedApproveReturn
  • MR-98238Interval 2026-04-18 08:00
    Press line electricity meterRequested by Admin
    Valid3dActions
  • MR-73211Event 2026-0418
    Compressed air flow meterRequested by Admin
    Estimated2dActions
  • MR-55536Task 2026-0217
    Compressed air flow meterRequested by Admin
    Missing5dActions
  • MR-33057Reading 2026-0418-01
    Press line electricity meterRequested by Admin
    Invalid4dActions

Who approves what

DecisionApprover
Review readingsEnergy Manager reviews the evidence and decides whether the observation can support consumption review.Energy Manager
Authorize maintenanceMaintenance Coordinator reviews the site task and assigned person before work starts.Maintenance Coordinator
Approve meter readings, operational eventsEnergy Manager
Approve maintenance tasksMaintenance Coordinator
4 approval rules · set per role in Proto
Example screen with sample data
Roles

A workspace for each role

Everyone opens Factory Energy Management to the work that is theirs. Pick a role to see what it starts with.

Admin

Maintains application access and the site and meter foundation.

  • Manage Users, People, Sites, Meters
  • View meter readings, energy intervals, operational events, maintenance tasks, Tariffs, production allocations, emission factors
Reports

Explain consumption and its operating context

Review accepted consumption, production attribution and the evidence behind operating exceptions.

Overview
Factory Energy Management · Overview

Factory Energy Management dashboard

This quarter

Operational events in view
6
Outage
2
Maintenance
2
Alarm
1

Energy intervals by status

How far records got this quarter

StageReachedStep
Received30
Validated1963%
Rejected1053%

Energy quantity by status

Sample totals per stage

10.0k0
10.0kReceived
6.0kValidated
8.0kRejected
Example screen with sample data
  1. 01Meter Reading Quality

    Which meters have estimated or rejected observations that need explanation before consumption review?

  2. 02Validated Consumption by Site

    What accepted energy quantity belongs to each site and unit for the selected operating period?

  3. 03Operating Event Duration

    How long did resolved outages, alarms or curtailments last where actual start and end values are available?

  4. 04Maintenance Due and Completion

    Which assigned tasks remain unfinished at their due date, and when was completed work actually finished?

  5. 05Effective Rate Cost Review

    Which compatible rate applies to the accepted quantity, and where does an effective-period ambiguity need resolution?

  6. 06Work Order Energy Allocation

    How much valid allocated energy belongs to each production reference over the selected period?

  7. 07Emission Factor Coverage

    Which event-linked factors have an identifiable source and applicable effective date?

  8. 08Energy Validation Exceptions

    Which rejected observations, events, allocations or factors still need correction?

Controls

Resolve evidence issues before using the result

Each stage, from meter observation to reviewed energy use, names the role that acts and the status it records, so a change is never anonymous.

OverviewFrom meter observation to reviewed energy use
Factory Energy Management · Process

From meter observation to reviewed energy use

Each stage, the role that acts and the status it records

Process stages
10
Approval steps
2
Roles involved
6
Tables touched
11
Review readingsApproval
Energy Manager
StatusRejected → Valid
Validate intervals
Energy Manager
StatusReceived → Validated
RecordsEnergy intervals, Meters
Review operating eventsApproval
Energy Manager
StatusOpen → Acknowledged
RecordsOperational events
From meter observation to reviewed energy use
  1. Start
    Review readingsRejected → Valid
    Energy Manager
  2. Step
    Validate intervalsReceived → Validated
    Energy intervals
  3. Approval
    Review operating eventsOpen → Acknowledged
    Operational events
  4. Approval
    Authorize maintenanceOpen → Approved
    Maintenance tasks
  5. Step
    Complete maintenanceApproved → in progress
    Sites
Example screen with sample data
AI agent

Prepare the next review with Proto

Ask Proto to help prepare energy reviews and locate the evidence behind exceptions.

It can

  • Meter Operator: Find rejected readings for the selected operating period and summarize the correction requested in each validation note.
  • Energy Manager: Prepare the acknowledged event review with the actual interval and validation outcome visible.
  • Maintenance Coordinator: Gather open tasks with their assigned person and due date for authorization review.
  • Cost Analyst: Compare a selected meter interval with candidate site tariffs and identify the effective dates that need checking.

Stays with a person

  • The assistant needs your configured access and source data.
  • Energy Manager remains responsible for reading and recovery decisions, while Maintenance Coordinator authorizes maintenance.
  • Agree calculation methods and connection behavior during setup before using an assistant-prepared result in an operating review.
  • Agent activity follows the usage and implementation terms on Pricing.
Integrations

Connects to the tools you use

Set up connections through ERP.AI and Proto workflows, with every change logged.

  • Factory Energy Management
  • Meter gateways
  • Production planning
  • Tariff sources
  • Emission factor sources
  • Accounting and reporting
Data model

Your data, in tables you can change

Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.

Browse all 11 tables
11tables
  • Metering and Readings5
  • Energy Intervals4
  • Operating Events and Maintenance5
  • Tariffs and Cost Review4
  • Production Allocations4
  • Emission Factors5
Implementation

Roll out one team at a time

Start with one team and one process, then add the rest once the basics are running.

  1. Choose the operating scope

    Select a factory site and an energy review period the team understands. Identify Energy Manager and the people responsible for observations, maintenance and cost review.

  2. Prepare the foundation

    Admin maps people to their accounts and checks the site timezone. Load the meter register with energy type, unit and reading mode, then prepare the effective site tariffs.

  3. Rehearse observation review

    Meter Operator enters an ordinary reading and a rejected example. Energy Manager reviews the correction, checks interval boundaries and accepts usable consumption.

  4. Rehearse site decisions

    Record an operating event and validate its actual interval. Maintenance Coordinator authorizes assigned work; Technician records completion; Energy Manager reviews recovery separately.

  5. Review allocations and factors

    Cost Analyst prepares a recognizable work order allocation. Sustainability Analyst supplies a cited event-linked factor. Test negative values and reversed or unsuitable periods before using the results.

Pricing

$0per user

The base account and everyday work in the ERP.AI app are free, for every user.

  • No per-user or per-seat fees
  • Viewing, editing, approving and exporting records in the app is free
  • Pay only for machine work: API calls, imports, workflows and AI agents
  • Prepaid credits from $5. Purchased credits never expire

Pricing details

Machine work rate card Included per $1 of credit

Machine work rate card
UsagePer $1
Record reads (list, filter, get)20,000
Search or aggregate queries4,000
Record writes4,000
Imported or synced records200,000
Workflow runs2,000
AI agent runs2,000
Scheduled jobs or webhooks20,000
File uploads (MB)2,000
CSV or PDF exports100
FAQ

Questions, answered

Scope, rollout and pricing for Factory Energy Management.

All questions
How do I get started?

Click Get started, then use Proto to configure Factory Energy Management for your business. Begin with a familiar site, its meter register and a recent operating period. Rehearse reading review and a maintenance authorization before expanding the scope.

Can we distinguish estimated meter readings?

Yes. Readings carry quality flags for Valid, Estimated, Missing and Invalid. Energy Manager reviews the quality alongside the validation result before deciding how the observation supports consumption review.

How do we handle cumulative meters?

Record the meter's reading mode and agree how its observations become consumption intervals during setup. Review adjacent intervals and their actual boundaries before accepting them for analysis.

Who authorizes maintenance?

Maintenance Coordinator reviews the site task, assigned person and due date before moving it from Open to Approved. Technician then records work in progress and actual completion.

Does completing maintenance resolve an operating event?

Energy Manager reviews event recovery separately. A completed inspection can inform that decision, while an alarm or outage remains acknowledged until the operating evidence supports resolution.

How do production references enter the review?

Cost Analyst records the work order reference with the meter, actual allocation period and attributed energy. Agree the reference convention with the production team, or set up a connection to its source system.

How do we handle a tariff change?

Compare the consumption interval with the tariff's effective start and end. Agree how to treat an interval crossing a rate boundary during reporting setup, and check the unit before calculating a cost.

What supports an emission factor?

The factor includes an energy type, regional basis, effective start and source citation linked to an operating event. Sustainability Analyst reviews its applicability to the consumption period used in the calculation.

Can we connect meter feeds?

Set up a connection to your meter gateway or observation source. Map meter identity, time and quality, then rehearse rejected and corrected observations before scheduling ongoing collection.

What should we bring to the first review?

Bring a meter register, sample observations, effective tariffs and recognizable production references. Include an operating event and a cited emission factor so the team can rehearse the handoffs described in Implementation.

Set up Factory Energy Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appFactory Energy Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.