All applications611

Find your application

611 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Aerospace ERP
  2. Features
  3. Assembly and kitting
Feature · Assembly and kitting

Assembly and kitting

Release bounded assembly work and record completed output.

OverviewAssembly schedule
Aerospace ERP · Assembly and kitting

Assembly schedule

Work orders

New
Work order numberOutput productPlanned startPlanned endStatus
WO-34320PRD-497225 Oct27 OctReleased
WO-32947PRD-415714 Oct22 OctIn progress
WO-42570PRD-262109 Oct11 OctPartially completed
WO-83583PRD-701224 Oct31 OctReleased
WO-51799PRD-299012 Oct15 OctIn progress
6 of 6 records
PRD-4972Work orders · WO-34320
Released
Planned start25 Oct
Planned end27 Oct
Example screen with sample data

What you can do

Keep the working basis clear

A distributor builds a kit from stocked components. Warehouse Manager selects the effective bill of materials, routing, output product and standard cost, then approves a work order for a positive planned quantity. Warehouse Operator records actual component use and operation results. Completion moves bounded output into stock while retaining scrap and cost evidence.

How the work is organized

  • Effective recipe. Warehouse Manager selects the active bill, routing, output product and standard cost for the planned work order.
  • Actual operations. Warehouse Operator records good output, scrap and labor at each operation without treating intermediate throughput as final stock.
  • Completion and cost. Accepted terminal output posts once; remaining work and variance stay visible for closing review.

What to agree during setup

Agree the output unit, component loss allowance, operation sequence and release authority. Confirm the effective recipe before releasing a work order. Assign a separate reviewer to the release and close decisions if the same Warehouse Manager prepared the order. Keep the frozen component basis with the released revision.

Check the handoff on an actual case

For a kit order, reserve the components needed for planned output and record a partial terminal completion. Compare actual good quantity, scrap and material use with the frozen recipe. Do not sum every operation count into finished inventory. If residual work-in-progress cost remains, have the reviewer decide its disposition before closing.

A released work order should answer which components were planned, which quantities were issued and which operation produced terminal output. Warehouse Operator records any returned material against the same work basis. If a component is short, Warehouse Manager can hold the unfinished quantity while preserving the part already completed. Cost review compares actual material and labor with the standard chosen at release. A replacement recipe applies through its own effective version; it does not revise the completed kit. The closing decision should show whether residual material or cost was resolved, rather than rely on a completed status alone.

What your team sees

  • Assembly schedule — Released and active work with planned start and end dates.
  • Available stock — Component positions to check before material issue.

Follow the work through

Follow kit release to close from effective recipe to variance decision. Use the data model to connect work orders, operation logs and terminal completion; check roles for independent approval.

What it keeps track of

Data model
Bill of materials
Effective distribution assembly/repacking recipes with explicit output basis.
BOM components
Component quantities per explicit output basis, preserving dimensions and allowed loss.
Routings
Versioned assembly/repacking instructions, distinct from delivery routes.
Routing operations
Ordered work instructions and declared labour/overhead bases.
Work orders
Released bounded assembly/kitting/repacking, without plant APS or payroll scope.
Work order components
Frozen required input and actual traced issue/return scope.
Work order operations
Frozen instructions and assigned actual work.
Production log
Actual operation throughput, scrap and labour evidence; intermediate counts do not sum to output.
Production completions
Accepted terminal output and WIP cost allocation, once per actual completed scope.
Work order cost entries
Immutable WIP debit/credit sources and bounded actual-cost allocation.
Cost standards
Entity/product standard per base unit with immutable effective versions.
Inventory
Current owned stock by complete identity and custody state; provenance is not a second balance.
Approval decisions
Authoritative human decisions independent of document lifecycle.

Who uses it

Permissions
Warehouse Manager
Selects and releases the work basis, with an independent reviewer for the decision.
Warehouse Operator
Records operations and completion.
Finance Manager
Reviews material cost exceptions when the close requires finance authority.

Set up Aerospace ERP your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started