All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Facility Maintenance Mgmt
  2. Features
  3. Execution & Evidence
Feature · Execution & Evidence

Execution & Evidence

Record performed work and let a manager inspect it before close.

OverviewWork Log Register
Facility Maintenance Mgmt · Execution & Evidence

Work Log Register

Work evidence

New
Work orderTeam memberStarted atEnded atWork performed
Inspect chiller 1 vibrationJonah Becker22 Nov17 NovReplaced drive belt and checked tension
Inspect chiller 1 vibrationEmily Russo16 Nov17 NovLubricated motor bearings
Replace belt on air handler 2Jonah Becker15 Nov17 NovCalibrated door sensor
Repair freight elevator 3 doorEmily Russo05 Nov09 NovTested pressure relief valve
Replace belt on air handler 2Tariq Hassan14 Nov17 NovCleaned intake screen
6 of 6 records
Replaced drive belt and checked tensionWork evidence · WE-28792
Work orderInspect chiller 1 vibration
Team memberJonah Becker
Started at22 Nov
Ended at17 Nov
Example screen with sample data

What you can do

Make performed work reviewable

A scheduled order tells the technician which asset needs attention. Starting the job marks the order In Progress and flags the asset for maintenance. Work evidence then holds the performing team member, the time interval and the description of work performed. The execution action moves the order to Review so Maintenance Manager can inspect the result before closeout.

How the work is organized

  • Start. Technician uses the scheduled work order and checks the asset and permit context.
  • Record. The work log connects the technician and performed work to that order.
  • Inspect. Maintenance Manager accepts the evidence and closes the order with a service history entry.

What to agree during setup

Agree what a useful work description must include for each kind of job. An inspection may need a measured finding; a corrective repair should identify the component worked on and the resulting condition. The evidence interval should reflect actual work. The team member on the evidence record should match the person who performed the task so later review can locate the right operator.

Decide who reviews the result and how the team handles a job that cannot be accepted immediately. Review is a distinct state. The accept action closes the order, creates service history and returns the asset to service. Managers should base that decision on the description and asset condition, not only on the order’s due date.

Check the handoff on an actual case

A scheduled pump inspection is assigned to a technician. Before starting, the technician checks the asset and the Approved permit. The execution action marks the order In Progress. The technician records the work interval, inspected components and observed outcome. The order moves to Review. Maintenance Manager reads the evidence, checks the pump’s condition and accepts the completed work. The order closes; the service history record remains linked to the same pump and order.

The work log lets the manager revisit who performed the service and when. The work log shows start and end times together, making an incomplete interval easy to find. When a later fault occurs, the asset’s service history and the original work description explain what was previously done.

What your team sees

  • Work Log Register — The work log shows who did the work, when and what was performed.
  • Service History Register — Accepted outcomes let the manager compare the completed job with the work log.

Follow the work through

Follow the first handoff and the next decision. Rehearse the sequence with a representative asset before opening it to the full team.

What it keeps track of

Data model
Work orders
Maintenance work orders through their lifecycle
Work evidence
Technician work performed against a work order
Team members
Maintenance staff directory
Assets
Machine and equipment registry
Safety permits
Safety permits authorizing work
Service history
Completed maintenance history per asset

Who uses it

Permissions
Technician
Performs assigned work and records evidence and consumed parts against the work order.
Maintenance Manager
Owns the maintenance queue, reviews completed work and decides whether to accept closeout.
Maintenance Planner
Each uses the same asset and order references for handoff.

Set up Facility Maintenance Mgmt your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appFacility Maintenance Mgmt

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.