All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Facility Maintenance Mgmt
  2. Features
  3. Work Orders
Feature · Work Orders

Work Orders

Keep each asset request, assignee and due date visible through review and close.

OverviewClosed Work Orders
Facility Maintenance Mgmt · Work Orders

Closed Work Orders

Work orders

New
IdAssetWork typeCompleted atAssigned toStatus
Work order WO-2026-0418Dock door motor 4PreventiveEmily RussoClosed
Permit SP-2026-0142Fire pump 1CorrectiveJonah BeckerClosed
Work order WO-2026-0420Roof exhaust fan 7InspectionAva ColemanClosed
Permit SP-2026-0143Chiller 1, plant roomPreventiveMarisol VegaClosed
Work order WO-2026-0422Dock door motor 4CorrectiveTariq HassanClosed
6 of 6 records
Work order WO-2026-0418Work orders · WO-93915
Preventive
AssetDock door motor 4
Assigned toEmily Russo
StatusClosed
Example screen with sample data

What you can do

Give each request a clear asset

A maintenance request starts with the equipment it affects. The order records whether the work is Preventive, Corrective or Inspection, alongside a description and request date. Maintenance Manager can inspect the asset’s location and current state before deciding how urgently to plan the job. The order’s state board makes the movement from Requested through Scheduled and Review visible without collapsing these steps into a single “done” label.

How the work is organized

  • Request. Maintenance Manager identifies the asset and describes the work in a Requested order.
  • Assignment. Maintenance Planner confirms a valid approved permit, names a team member and sets a due date before scheduling.
  • Close review. Technician records the work; Maintenance Manager accepts the result and connects the closed order to service history.

What to agree during setup

Agree how managers distinguish a corrective fault from an inspection and who can set the due date. The planner needs an active team member record for the assignee and a permit whose approved interval covers the planning day. A requested order needs an initial assignee because that reference is required. Decide who selects that person at request time; the planner can confirm or change the assignment before scheduling.

Set a practical review routine for orders in Review. The person accepting the result should read the technician’s account of work performed, not infer completion from a changed status. The close action produces a service history record and returns an asset flagged for maintenance to service. A manager should check the resulting asset state before treating it as available for normal use.

Check the handoff on an actual case

Consider an air handler reported with a bearing noise. Maintenance Manager opens a Corrective request for that asset with an initial team member assigned. Permit Issuer records an Approved permit with a valid interval. Maintenance Planner checks that permit, assigns a technician and sets a due date. Technician starts the work, describes the bearing inspection and repair, and sends the order for review. Maintenance Manager accepts the work, then checks the closed order against the new service history entry. If the result needs more attention, the manager should resolve it before accepting closeout.

This case gives the team a real path to rehearse: the request, authorization, execution and acceptance all refer to the same asset and order. A view of open work supports the daily queue; the full register preserves closed and cancelled history for later inspection.

What your team sees

  • Work Order Register — The full job register shows the asset, assignee, due date and current state.
  • Open Work Orders — The daily queue isolates orders still awaiting work or review.

Follow the work through

Follow the first handoff and the next decision. Rehearse the sequence with a representative asset before opening it to the full team.

What it keeps track of

Data model
Work orders
Maintenance work orders through their lifecycle
Assets
Machine and equipment registry
Team members
Maintenance staff directory
Safety permits
Safety permits authorizing work
Work evidence
Technician work performed against a work order
Service history
Completed maintenance history per asset

Who uses it

Permissions
Maintenance Manager
Owns the maintenance queue, reviews completed work and decides whether to accept closeout.
Maintenance Planner
Checks asset readiness, permit validity, assignee and due date before scheduling work.
Technician
Performs assigned work and records evidence and consumed parts against the work order.
Permit Issuer
Each uses the same asset and order references for handoff.

Set up Facility Maintenance Mgmt your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appFacility Maintenance Mgmt

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.