1. Factory Energy Management
  2. Features
  3. Energy Intervals
Feature · Energy Intervals

Energy Intervals

Review consumed energy within clear meter intervals before using it in cost or allocation analysis.

OverviewValidated Consumption
Factory Energy Management · Energy Intervals

Validated Consumption

Energy intervals

New
IdMeterStarts atEnds atEnergy quantityUnit
IDD-799MTR-2312219 Oct24 Oct930UNT-970
IDD-432MTR-3329520 Oct29 Oct930UNT-589
IDD-314MTR-5923905 Oct09 Oct570UNT-222
IDD-807MTR-1509908 Oct12 Oct40UNT-633
IDD-550MTR-1006006 Oct12 Oct160UNT-181
6 of 6 records
IDD-799Energy intervals · EI-93248
Validated
MeterMTR-23122
Starts at19 Oct
Ends at24 Oct
Energy quantity930
UnitUNT-970
Example screen with sample data

What you can do

Give consumption an actual period

A reading tells the team what was observed at a meter. A consumption interval defines the period represented by an energy quantity. Energy Manager reviews the interval’s start and end, unit and meter before changing it from Received to Validated. Cost Analyst uses accepted intervals as the basis for later rate and production comparisons.

This distinction matters when a production run ends near a change of day or when a meter observation arrives late. The period represented by the energy remains the actual operating interval. Reviewing the record later should not move that consumption into the review date. The team needs the original boundaries to compare like periods and explain exceptions.

How the work is organized

  • Received consumption. Energy Manager opens intervals awaiting review and checks the meter against its site. Meter Operator supplies the observations needed to explain the energy quantity and the reading mode.
  • Interval decisions. Energy Manager checks that the end follows the start and that the period does not overlap another interval being counted for the same meter. Accepted intervals become Validated; unusable intervals become Rejected.
  • Comparable totals. Cost Analyst and Sustainability Analyst use validated quantities with their units intact. Keep unlike energy units separate until the team has agreed the appropriate conversion outside the basic comparison.

What to agree during setup

Agree how intervals are prepared from cumulative and interval observations. Identify the person who checks the boundaries and the evidence they need before accepting a quantity. Test how the site timezone affects dates received from a source system. The interval must still describe the operating period when someone reviews it from another location.

Decide how to handle a period that crosses an effective tariff boundary. Cost review needs a defensible quantity for each applicable rate period. Agree the treatment before the first reporting cycle, including how rejected or incomplete intervals remain visible to the people resolving them. A total should identify the scope of accepted consumption that it represents.

Check the handoff on an actual case

For a rehearsal, use an interval covering 06:00 to 10:00 in the site’s agreed timezone. Give the next interval a start of 09:45 and an end of 12:00. Energy Manager compares both periods with the source observations and identifies the overlap from 09:45 to 10:00. Keep the overlapping interval out of accepted consumption while Meter Operator checks the evidence.

Correct the second interval’s boundary and quantity from the observations together. Moving its start to 10:00 while leaving a quantity that includes the earlier period would still overstate consumption. Energy Manager validates the corrected interval and opens Validated Consumption. Cost Analyst then compares it with an allocation for the same meter and period. A shorter production run needs its own comparable consumption basis before the team can explain a quantity difference.

What your team sees

  • Interval Review — Compare received, validated and rejected consumption with their start and end boundaries.
  • Validated Consumption — Open accepted meter quantities for cost and production analysis.

Follow the work through

Rehearse Reading to consumption, then use Consumption to production cost to test the downstream comparison.

What it keeps track of

Data model
Energy intervals
Validated non-overlapping energy intervals derived from meter observations for consumption and cost.
Meters
Energy meters installed at a site, with their energy type, unit and reading mode.
Sites
Physical plant sites whose energy consumption is monitored.
Meter readings
Raw meter observations captured from the site meter, including estimated and invalid reads.

Who uses it

Permissions
Energy Manager
, Meter Operator, Cost Analyst, Sustainability Analyst, Admin.
Energy Manager
Owns interval review; the analysts use the accepted quantities within an agreed reporting scope.

Set up Factory Energy Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started