All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Factory Energy Management
  2. Features
  3. Metering and Readings
Feature · Metering and Readings

Metering and Readings

Give every observation a known meter, a reading time and an explicit quality assessment.

OverviewMeter Reading Review
Factory Energy Management · Metering and Readings

Meter Reading Review

Meter readings

New
IdMeterRead atValueQuality flagValidation status
Interval 2026-04-18 08:00Press line electricity meter09 Nov600ValidValid
Event 2026-0418Compressed air flow meter19 Nov120EstimatedValid
Task 2026-0217Compressed air flow meter11 Nov430MissingValid
Reading 2026-0418-01Press line electricity meter22 Nov70InvalidValid
Tariff 2026-Q2Main plant electricity meter08 Nov430ValidValid
6 of 6 records
Interval 2026-04-18 08:00Meter readings · MR-98238
Valid
MeterPress line electricity meter
Read at09 Nov
Value600
Validation statusValid
Validation notesReading matches meter register
Example screen with sample data

What you can do

Start with a meter the team can recognize

A factory energy review begins with the identity of the meter that produced the observation. Admin links each meter to its operating site and records the energy type, unit and reading mode. Meter Operator uses that register when entering readings. Energy Manager can then trace an unusual observation back to the correct location and decide whether it is suitable for consumption review.

A cumulative reading and an interval reading require different interpretation. The reading mode belongs with the meter so the team can agree how observations become consumption. Keep the site timezone clear before bringing in historical observations. A date interpreted differently by the source and the receiving team can place otherwise reasonable energy use in the wrong operating period.

How the work is organized

  • Meter identity. Admin maintains the meter number and site link. Meter Operator checks that identity before entering an observation, especially where nearby production areas use similar labels.
  • Observation quality. Meter Operator records the reading time and value together with the quality flag. Estimated, Missing and Invalid remain meaningful distinctions during review; they should not disappear into a general consumption total.
  • Reviewer decision. Energy Manager examines the observation after validation checks. Rejected entries retain a reason so the operator knows whether to correct the meter reference, the recorded time or the value before presenting the evidence again.

What to agree during setup

Decide who maintains the meter register and who reviews observations. Agree which source identifies each physical meter, how its unit is expressed and how estimated observations are handled. If observations come from a meter gateway, configure that connection with the same identifiers used by the operating team. Review a sample from each reading mode before loading a longer history.

Agree how a corrected observation is distinguished from a new observation. The reviewer needs to understand what changed and why the new value is acceptable. Keep source material available for that discussion. Use rejection notes to explain the specific issue instead of asking the operator to repeat an entire day’s collection without direction.

Check the handoff on an actual case

Take an estimated observation from a meter serving a finishing area. Meter Operator confirms the physical meter and explains the estimate. Energy Manager checks the reading time against the site’s operating period and reviews whether the observation can support the intended analysis. If the value is negative or belongs to another meter, return it with a clear correction request.

Repeat the exercise with the corrected observation. Confirm that its quality flag still describes how the value was obtained and that the validation result reflects the correction. Then open the consumption interval that the team intends to review. The handoff is ready when the reviewer can explain the observation and its use without relying on an undocumented verbal assurance.

What your team sees

  • Meter Reading Review — Inspect observations with their quality flag, recorded value and validation outcome.
  • Reading Exceptions — Find rejected observations and the reason each needs attention.
  • Active Sites — Check the location and timezone behind an operating meter.

Follow the work through

Use Reading to consumption to rehearse the reviewer handoff, then follow the implementation phases for the first site.

What it keeps track of

Data model
Sites
Physical plant sites whose energy consumption is monitored.
Meters
Energy meters installed at a site, with their energy type, unit and reading mode.
Meter readings
Raw meter observations captured from the site meter, including estimated and invalid reads.
People
Factory Energy Management staff and their application user account and role title.
Users
Sign-in accounts for the people who use the app.

Who uses it

Permissions
Admin
Maintains the foundation.
Meter Operator
Captures evidence.
Energy Manager
Decides how readings enter the operating review.

Set up Factory Energy Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appFactory Energy Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.