These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
- Lean Manufacturing Tools
- Features
- Kaizen Improvement
Kaizen Improvement
Give each improvement proposal an owner and follow its approval, implementation and verification.
OverviewMy Kaizen Proposals×
Lean Manufacturing Tools · Kaizen Improvement
New
My Kaizen Proposals
Kaizen proposals
| Area | Problem | Proposed change | Status | Owner | |
|---|---|---|---|---|---|
| ARA-577 | PRB-749 | PC-859 | Proposed | ||
| ARA-526 | PRB-138 | PC-152 | Approved | ||
| ARA-774 | PRB-716 | PC-197 | Implementing | ||
| ARA-650 | PRB-935 | PC-311 | Verified | ||
| ARA-186 | PRB-397 | PC-381 | Closed |
6 of 6 records
ARA-577Kaizen proposals · KP-75738
ProposedProblemPRB-749
Proposed changePC-859
What you can do
Keep the problem attached to the change
A useful Kaizen proposal explains where the problem occurs and what the team wants to change. The Inspector records the area, problem and proposed change, then selects the person who will own it. The proposal begins at Proposed. That gives the Quality Manager a common place to review small improvements that would otherwise remain in shift notes or informal conversations.
The owner stays visible as work advances through Approved, Implementing and Verified before reaching Closed. These stages help the team distinguish permission to proceed from evidence that the change has been carried out. The review should return to the original problem, particularly when the implementation differs from the first suggestion.
How the work is organized
- Proposal capture. An authorized Inspector submits the problem and proposed change for the selected owner. The team can locate the proposal by area and see who is responsible for carrying the work forward.
- Approval decision. The Improvement Reviewer examines the intended change under the authority agreed during setup. Approved work can move into implementation. Rejection and cancellation follow reasoned workflow branches so the team can explain why work stopped.
- Verification. The owner carries out the agreed work and brings it back for review. Verification checks the change against the problem before the proposal is closed. A status change should reflect an actual operating decision.
What to agree during setup
Choose an area naming convention that operators recognize. If the same cell appears as Assembly A, Cell A and Main Assembly, the daily queue becomes harder to interpret. Agree what belongs in the problem statement and what level of detail is needed before an improvement can be approved.
Assign the reviewer for approval and verification, and configure that responsibility through the Improvement Reviewer role. Decide how owners will present implementation evidence through the workflow. Keep the review practical: a small change to tool placement needs an observable check, while a change to an operating method may also require a revised controlled standard.
Check the handoff on an actual case
Use a proposal to move frequently used tools beside an assembly bench. The Inspector describes the repeated trips to a distant cabinet and selects an owner for the proposed relocation. The reviewer checks the proposed placement and approves the work. The owner then moves the tools and starts using the new arrangement during the agreed trial.
At verification, return to the original problem and inspect the arrangement with the people doing the work. If the tools are still difficult to find, the reviewer should not treat implementation as successful verification. Exercise the supported failure branch with a reason. When the reviewer accepts the completed change, advance it to Verified and close it through the permitted path. Keep any revised work instruction connected through the team’s document process.
What your team sees
- Kaizen Board — Proposals grouped by their current stage, with the area and owner visible.
- My Kaizen Proposals — The problems and changes assigned to the signed-in person’s responsibility.
Follow the work through
Follow Kaizen proposal to verification, then use Standards and acknowledgments when the improvement changes a work instruction.
What it keeps track of
Data model- Kaizen proposals
- Lean Manufacturing Tools Kaizen Proposals records
- People
- Lean Manufacturing Tools People records
Who uses it
Permissions- Inspector
- , Quality Manager, Improvement Reviewer.
- The Inspector captures ideas, the Quality Manager coordinates owners, and the reviewer authorizes eligible changes and verification.
Set up Lean Manufacturing Tools your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.