Asset register
Give each maintenance request a clear machine identity and operating context.
OverviewInspection Queue×
Machine Maintenance (CMMS) · Asset register
New
Inspection Queue
Close waits for the maintenance reviewer
| Work order no | Asset | Assigned to | Work type | Description | Status | |
|---|---|---|---|---|---|---|
| WON-965 | ASS-16501 | Preventive | Inspection wo-213 | Inspection | ||
| WON-596 | ASS-43997 | Corrective | Inspection wo-523 | Inspection | ||
| WON-972 | ASS-81291 | Inspection | Inspection wo-865 | Inspection | ||
| WON-566 | ASS-16747 | Preventive | Inspection wo-745 | Inspection | ||
| WON-183 | ASS-88110 | Corrective | Inspection wo-106 | Inspection |
6 of 6 records
WON-965Work orders · WO-35981
PreventiveAssetASS-16501
DescriptionInspection wo-213
StatusInspection
What you can do
Start with the machine people can find
A repair request needs a recognizable asset before anyone can plan the work. The Maintenance Manager records the equipment name, asset tag, location and serial number so the Technician can distinguish similar machines on the same floor. Manufacturer and commissioning date add context when the team investigates repeated service needs or plans an equipment change.
The asset stays connected to its work orders, condition measurements and service outcomes. A pump described as “the one by loading” can easily become confused with its replacement. Give each physical unit a stable identity, then use its location to explain where it currently operates. When equipment moves, the maintenance conversation should still point to the same machine.
How the work is organized
- Identity. Use the asset tag and serial number to check that a request concerns the intended equipment. Agree how names distinguish similar machines before importing an existing register. The record should be useful to the person standing beside the machine.
- Operating state. Choose Active, Maintenance, Out of Service or Retired to reflect the asset’s current condition. A due work order and an unavailable machine are different facts that the Maintenance Manager must consider together when planning the next job.
- Service context. Open the linked maintenance work and completed service outcomes when deciding what to investigate. The relationship to the asset keeps a repair, a preventive plan and a condition measurement attached to the equipment they concern.
What to agree during setup
Choose who maintains asset identities and how commissioning and decommissioning dates will be checked. Decide which locations need enough detail for a visiting Technician to find the equipment. Agree how the Maintenance Manager handles an equipment replacement so that a new serial number does not silently inherit the old unit’s history.
Begin with equipment that will enter the pilot maintenance cycle. Compare the imported asset tag, name and serial number with the physical identification plate. Keep acquisition cost meaningful for your team, and agree the monetary convention before importing it. Financial depreciation and asset accounting can be connected separately through your accounting system.
Check the handoff on an actual case
Use cooling pump CP-14 as the rehearsal. The Maintenance Manager records its location beside the cooling loop and confirms its serial number. A Technician opens the related corrective work order and checks the machine before beginning. The Maintenance Reviewer later follows the accepted repair into its service history and confirms that it still refers to CP-14.
Repeat the lookup with another pump that has a similar name. The team should identify the right unit from its asset tag and location without rewriting the request. After inspection acceptance, confirm that the completed job returns the intended asset to Active. Investigate any mismatch before expanding the pilot register.
What your team sees
- Asset Register — Equipment grouped by its operating state, with location and identification details ready for maintenance planning.
- Service History by Asset — Completed work and the recorded next due date for the selected equipment.
Follow the work through
Use request planning to turn the equipment issue into assigned work, then follow inspection and service to retain the result.
What it keeps track of
Data model- Assets
- Asset register of maintainable machines and equipment with location, warranty and status.
- Work orders
- Maintenance work orders from request through planning, execution, inspection and closure.
- Condition readings
- Condition monitoring measurements with action limits.
- Preventive plans
- Preventive maintenance schedules driven by day and hour intervals.
- Service history
- Completed service outcomes per asset with next due date.
Who uses it
Permissions- Maintenance Manager
- , Technician, Maintenance Reviewer.
- The Maintenance Manager owns the equipment context; the Technician and Maintenance Reviewer use it to verify the job and its outcome.
Set up Machine Maintenance (CMMS) your way.