1. Machine Maintenance (CMMS)
  2. Features
  3. Asset register
Feature · Asset register

Asset register

Give each maintenance request a clear machine identity and operating context.

OverviewInspection Queue
Machine Maintenance (CMMS) · Asset register

Inspection Queue

Close waits for the maintenance reviewer

New
Work order noAssetAssigned toWork typeDescriptionStatus
WON-965ASS-16501PreventiveInspection wo-213Inspection
WON-596ASS-43997CorrectiveInspection wo-523Inspection
WON-972ASS-81291InspectionInspection wo-865Inspection
WON-566ASS-16747PreventiveInspection wo-745Inspection
WON-183ASS-88110CorrectiveInspection wo-106Inspection
6 of 6 records
WON-965Work orders · WO-35981
Preventive
AssetASS-16501
DescriptionInspection wo-213
StatusInspection
Example screen with sample data

What you can do

Start with the machine people can find

A repair request needs a recognizable asset before anyone can plan the work. The Maintenance Manager records the equipment name, asset tag, location and serial number so the Technician can distinguish similar machines on the same floor. Manufacturer and commissioning date add context when the team investigates repeated service needs or plans an equipment change.

The asset stays connected to its work orders, condition measurements and service outcomes. A pump described as “the one by loading” can easily become confused with its replacement. Give each physical unit a stable identity, then use its location to explain where it currently operates. When equipment moves, the maintenance conversation should still point to the same machine.

How the work is organized

  • Identity. Use the asset tag and serial number to check that a request concerns the intended equipment. Agree how names distinguish similar machines before importing an existing register. The record should be useful to the person standing beside the machine.
  • Operating state. Choose Active, Maintenance, Out of Service or Retired to reflect the asset’s current condition. A due work order and an unavailable machine are different facts that the Maintenance Manager must consider together when planning the next job.
  • Service context. Open the linked maintenance work and completed service outcomes when deciding what to investigate. The relationship to the asset keeps a repair, a preventive plan and a condition measurement attached to the equipment they concern.

What to agree during setup

Choose who maintains asset identities and how commissioning and decommissioning dates will be checked. Decide which locations need enough detail for a visiting Technician to find the equipment. Agree how the Maintenance Manager handles an equipment replacement so that a new serial number does not silently inherit the old unit’s history.

Begin with equipment that will enter the pilot maintenance cycle. Compare the imported asset tag, name and serial number with the physical identification plate. Keep acquisition cost meaningful for your team, and agree the monetary convention before importing it. Financial depreciation and asset accounting can be connected separately through your accounting system.

Check the handoff on an actual case

Use cooling pump CP-14 as the rehearsal. The Maintenance Manager records its location beside the cooling loop and confirms its serial number. A Technician opens the related corrective work order and checks the machine before beginning. The Maintenance Reviewer later follows the accepted repair into its service history and confirms that it still refers to CP-14.

Repeat the lookup with another pump that has a similar name. The team should identify the right unit from its asset tag and location without rewriting the request. After inspection acceptance, confirm that the completed job returns the intended asset to Active. Investigate any mismatch before expanding the pilot register.

What your team sees

  • Asset Register — Equipment grouped by its operating state, with location and identification details ready for maintenance planning.
  • Service History by Asset — Completed work and the recorded next due date for the selected equipment.

Follow the work through

Use request planning to turn the equipment issue into assigned work, then follow inspection and service to retain the result.

What it keeps track of

Data model
Assets
Asset register of maintainable machines and equipment with location, warranty and status.
Work orders
Maintenance work orders from request through planning, execution, inspection and closure.
Condition readings
Condition monitoring measurements with action limits.
Preventive plans
Preventive maintenance schedules driven by day and hour intervals.
Service history
Completed service outcomes per asset with next due date.

Who uses it

Permissions
Maintenance Manager
, Technician, Maintenance Reviewer.
The Maintenance Manager owns the equipment context; the Technician and Maintenance Reviewer use it to verify the job and its outcome.

Set up Machine Maintenance (CMMS) your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started