Feature · Safety permits

Safety permits

Check the approved permit and its validity window before maintenance starts.

OverviewPermit Requests
Machine Maintenance (CMMS) · Safety permits

Permit Requests

Approval waits for the maintenance manager

New
IdPermit typeWork orderValid fromValid toIssued by
IDD-670PT-629WO-340627 Oct30 Oct
IDD-666PT-226WO-464410 Oct18 Oct
IDD-282PT-632WO-968314 Oct18 Oct
IDD-854PT-134WO-696724 Oct31 Oct
IDD-878PT-746WO-418224 Oct31 Oct
6 of 6 records
IDD-670Safety permits · SP-86836
Requested
Permit typePT-629
Work orderWO-3406
Valid from27 Oct
Valid to30 Oct
Example screen with sample data

What you can do

Make the permission to start explicit

A scheduled work order still needs a valid safety permit before the Technician starts maintenance. The permit records its type, the work order it covers, the issuing person and the validity interval. The Maintenance Manager reviews that context during planning and approves the permit for the intended work window.

The execution workflow checks the permit before allowing the start action. This makes the permit part of the operating handoff between the planner and the Technician. The team can inspect an Approved permit and its dates together, then decide whether the planned job still fits the authorized window when conditions change.

How the work is organized

  • Requested permission. Link the permit to the maintenance work order and identify the issuing person. Choose a permit type that the team understands and enter the beginning and end of its validity. Review the job scope before authorizing the work.
  • Approved window. The Maintenance Manager approves the permit during planning. The Technician checks its validity when starting the scheduled job. A permit for another work order or a window that has already ended must not be treated as permission for this job.
  • Permit follow-up. Requested, Approved, Expired and Closed distinguish the recorded permit states. Agree who follows up when the job is delayed or the authorized period ends, using your site’s operating procedure for any renewed permission.

What to agree during setup

Agree the permit types and the site procedure each label refers to. The person issuing a permit must have the correct account-to-person mapping, and the Maintenance Manager must understand the authorization they are making. Keep the written work description specific enough to judge whether the permit covers the task.

Rehearse how the team interprets dates and times across shifts. Confirm how a delayed job gets a newly authorized window before work resumes. Keep isolation procedures, physical safety checks and any external safety system under the responsible site’s control. Connecting an existing permit system is a setup choice that needs its own owner and reconciliation procedure.

Check the handoff on an actual case

A scheduled belt replacement is planned for a stopped conveyor. The Maintenance Manager reviews the requested permit, confirms the work order and approves its validity window. The assigned Technician opens the work and starts it during that interval. The workflow should allow the valid start and move the work into execution.

Repeat the exercise with the permit window already ended. The Technician should remain unable to start that scheduled work through the guarded action. The manager then reviews the actual timing and arranges the proper authorization. Also check a permit linked to a neighboring conveyor: its Approved state cannot substitute for the permit on the intended job. Resolve these cases before relying on the handoff across shifts.

What your team sees

  • Permit Requests — Permits awaiting the Maintenance Manager’s review, with issuer and validity interval.
  • Approved Permits — Approved permission records that the team checks against the planned work and start time.

Follow the work through

Follow request planning for permit approval and execution and inspection for the controlled start.

What it keeps track of

Data model
Safety permits
Permits to work with validity intervals and approval status.
Work orders
Maintenance work orders from request through planning, execution, inspection and closure.
People
Maintenance staff and reviewers referenced by work orders, logs and permits.
Assets
Asset register of maintainable machines and equipment with location, warranty and status.

Who uses it

Permissions
Maintenance Manager
, Technician, Maintenance Reviewer.
The Maintenance Manager authorizes the permit, the Technician uses the guarded start action, and the Maintenance Reviewer reads the permission context with the completed work.