Feature · Safety permits

Safety permits

Check the approved permit and its validity window before maintenance starts.

OverviewPermit Requests
Machine Maintenance (CMMS) · Safety permits

Permit Requests

Approval waits for the maintenance manager

New
IdPermit typeWork orderValid fromValid toIssued by
PERMIT-2026-041Lockout and tagoutInspect press hydraulic leak29 Nov02 DecMarta Ilyin
LOG-2026-184Hot workBalance cooling tower fan12 Nov20 NovSanjay Menon
PM-2026-027Confined space entryService compressor intake filter16 Nov20 NovRafael Costa
READ-2026-311Electrical isolationBalance cooling tower fan26 Nov03 DecHiro Tanaka
SERVICE-2026-086Working at heightReplace forklift battery cable26 Nov03 DecElena Mbaye
6 of 6 records
PERMIT-2026-041Safety permits · SP-86836
Requested
Permit typeLockout and tagout
Work orderInspect press hydraulic leak
Valid from29 Nov
Valid to02 Dec
Issued byMarta Ilyin
Example screen with sample data

What you can do

Make the permission to start explicit

A scheduled work order still needs a valid safety permit before the Technician starts maintenance. The permit records its type, the work order it covers, the issuing person and the validity interval. The Maintenance Manager reviews that context during planning and approves the permit for the intended work window.

The execution workflow checks the permit before allowing the start action. This makes the permit part of the operating handoff between the planner and the Technician. The team can inspect an Approved permit and its dates together, then decide whether the planned job still fits the authorized window when conditions change.

How the work is organized

  • Requested permission. Link the permit to the maintenance work order and identify the issuing person. Choose a permit type that the team understands and enter the beginning and end of its validity. Review the job scope before authorizing the work.
  • Approved window. The Maintenance Manager approves the permit during planning. The Technician checks its validity when starting the scheduled job. A permit for another work order or a window that has already ended must not be treated as permission for this job.
  • Permit follow-up. Requested, Approved, Expired and Closed distinguish the recorded permit states. Agree who follows up when the job is delayed or the authorized period ends, using your site’s operating procedure for any renewed permission.

What to agree during setup

Agree the permit types and the site procedure each label refers to. The person issuing a permit must have the correct account-to-person mapping, and the Maintenance Manager must understand the authorization they are making. Keep the written work description specific enough to judge whether the permit covers the task.

Rehearse how the team interprets dates and times across shifts. Confirm how a delayed job gets a newly authorized window before work resumes. Keep isolation procedures, physical safety checks and any external safety system under the responsible site’s control. Connecting an existing permit system is a setup choice that needs its own owner and reconciliation procedure.

Check the handoff on an actual case

A scheduled belt replacement is planned for a stopped conveyor. The Maintenance Manager reviews the requested permit, confirms the work order and approves its validity window. The assigned Technician opens the work and starts it during that interval. The workflow should allow the valid start and move the work into execution.

Repeat the exercise with the permit window already ended. The Technician should remain unable to start that scheduled work through the guarded action. The manager then reviews the actual timing and arranges the proper authorization. Also check a permit linked to a neighboring conveyor: its Approved state cannot substitute for the permit on the intended job. Resolve these cases before relying on the handoff across shifts.

What your team sees

  • Permit Requests — Permits awaiting the Maintenance Manager’s review, with issuer and validity interval.
  • Approved Permits — Approved permission records that the team checks against the planned work and start time.

Follow the work through

Follow request planning for permit approval and execution and inspection for the controlled start.

What it keeps track of

Data model
Safety permits
Permits to work with validity intervals and approval status.
Work orders
Maintenance work orders from request through planning, execution, inspection and closure.
People
Maintenance staff and reviewers referenced by work orders, logs and permits.
Assets
Asset register of maintainable machines and equipment with location, warranty and status.

Who uses it

Permissions
Maintenance Manager
Authorizes the permit, the Technician uses the guarded start action, and the Maintenance Reviewer reads the permission context with the completed work.
Technician
Captures assigned maintenance work and evidence. Record entry (View, View records, Create, Edit) on Work Logs, Part Usage, Condition Readings. Read only (View, View records) on People, Assets, Work Orders, Spare Parts, Safety Permits, Service History, Preventive Plans. Read access to the app pages. Restrictions: own assigned operational work only - referenced setup/master records are readable as labels and task context, never editable; configuration, rates, commercial documents, and approvals are never operator-editable; quantity posting, sign-off, and state changes go through named guarded workflows with authenticated actor and source-revision checks, not direct field edits.
Maintenance Reviewer
Reviews evidence and authorizes eligible outcomes. Record entry: none - this role never gets create/edit on any table. Read only (View, View records) on People, Assets, Work Orders, Work Logs, Spare Parts, Part Usage, Safety Permits, Service History, Preventive Plans, Condition Readings. Read access to the app pages. Restrictions: review actions apply only to the exact submitted revision and only by someone independent of the preparer where required; no raw approval shortcut and no protected-balance editing; a reject action leaves the evidence and reason intact rather than deleting or overwriting them. State changes happen through the named workflows WF-01 and WF-02.

Set up Machine Maintenance (CMMS) your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appMachine Maintenance (CMMS)

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.