Work order planning
Turn an equipment request into a scheduled job with an assigned technician and clear scope.
OverviewMy Maintenance Work×
Machine Maintenance (CMMS) · Work order planning
New
My Maintenance Work
Work orders
| Work order no | Asset | Description | Due date | Status | Assigned to | |
|---|---|---|---|---|---|---|
| WO-2026-1041 | Pallet wrapper 1 | Replace worn drive belt on packaging line | 25 Nov | Requested | Owen Farouk | |
| WO-2026-1042 | Cooling tower fan 2 | Trace oil seep at press manifold | 25 Nov | Approved | Owen Farouk | |
| WO-2026-1043 | Cooling tower fan 2 | Change compressor intake filter | 28 Nov | Scheduled | Lucia Ortega | |
| WO-2026-1044 | Packaging conveyor 2 | Check spindle runout after vibration | 17 Nov | In Progress | Nadia Rahman | |
| WO-2026-1045 | Cooling tower fan 2 | Repair leaking pump mechanical seal | 08 Nov | Inspection | Amina Velasquez |
6 of 6 records
WO-2026-1041Work orders · WO-17755
RequestedAssetPallet wrapper 1
DescriptionReplace worn drive belt on packaging line
Due date25 Nov
Assigned toOwen Farouk
What you can do
Decide what the next job needs
The Maintenance Manager uses each work order to make a practical commitment: which machine needs attention, what the Technician will do and when the job is due. Preventive, Corrective and Inspection work share the same request record, so the planner can compare planned servicing with issues that arrive during the operating day.
The Work Orders workspace brings a status board and a paginated list together. Opening a work order gives the team its record form and a detail panel showing the actions relevant to its current status. The read-only board helps the planner inspect the queue; the job advances through the appropriate workflow action after its prerequisites have been checked.
How the work is organized
- Request scope. Write a description that identifies the observed problem or planned task. Link the asset and assigned person, then choose the work type. The Requested state gives the Maintenance Manager a queue to review before scheduling a commitment.
- Authorization. Check the machine and arrange the safety permit for the intended window. The Maintenance Manager approves the permit through the planning workflow and confirms who will perform the work. An ambiguous permit window must be resolved before the start action.
- Assignment. Confirm the due date and Technician, then read back the Scheduled work order. The assigned person follows the same record into execution, labor capture and inspection so that planning decisions remain connected to the eventual service outcome.
What to agree during setup
Decide who receives maintenance requests and how descriptions should distinguish a symptom from the work to perform. Establish the active people who can receive assignments. Their user accounts must resolve to the correct person so that work reaches the intended Technician and the workflow can attribute the acting user.
Agree the meaning of a due date for your operation. A job due before a production restart may need a different planning conversation from a routine inspection. Rehearse the local planning handoff with the people who control machine access. Production schedules and external dispatch tools can be connected during setup where that coordination is needed.
Check the handoff on an actual case
A Technician reports abnormal noise on cooling pump CP-14. The Maintenance Manager creates corrective work describing the noise, links the pump and assigns the intended person. Before scheduling, the manager checks the permit window against the period when the machine will be available for maintenance.
Run the planning action, then open the work order again. Confirm Scheduled, the due date and the assigned person. Ask another Technician to find their own work and verify that CP-14 has not been assigned to them by mistake. The planned job is ready for execution only when the team can identify the equipment, understand the scope and use the approved permit at the intended time.
What your team sees
- Maintenance Queue — Requested and planned jobs with their asset, assigned person and due date.
- Work Order Board — Maintenance work grouped by status for the planning conversation.
- My Maintenance Work — The jobs assigned to the signed-in person, with scope and due dates.
Follow the work through
Rehearse request to schedule, then continue with execution and inspection.
What it keeps track of
Data model- Work orders
- Maintenance work orders from request through planning, execution, inspection and closure.
- Assets
- Asset register of maintainable machines and equipment with location, warranty and status.
- People
- Maintenance staff and reviewers referenced by work orders, logs and permits.
- Users
- Sign-in accounts for the people who use the app.
- Safety permits
- Permits to work with validity intervals and approval status.
Who uses it
Permissions- Maintenance Manager
- Schedules the job, the Technician checks the assignment, and the Maintenance Reviewer follows the evidence into inspection.
- Technician
- Captures assigned maintenance work and evidence. Record entry (View, View records, Create, Edit) on Work Logs, Part Usage, Condition Readings. Read only (View, View records) on People, Assets, Work Orders, Spare Parts, Safety Permits, Service History, Preventive Plans. Read access to the app pages. Restrictions: own assigned operational work only - referenced setup/master records are readable as labels and task context, never editable; configuration, rates, commercial documents, and approvals are never operator-editable; quantity posting, sign-off, and state changes go through named guarded workflows with authenticated actor and source-revision checks, not direct field edits.
- Maintenance Reviewer
- Reviews evidence and authorizes eligible outcomes. Record entry: none - this role never gets create/edit on any table. Read only (View, View records) on People, Assets, Work Orders, Work Logs, Spare Parts, Part Usage, Safety Permits, Service History, Preventive Plans, Condition Readings. Read access to the app pages. Restrictions: review actions apply only to the exact submitted revision and only by someone independent of the preparer where required; no raw approval shortcut and no protected-balance editing; a reject action leaves the evidence and reason intact rather than deleting or overwriting them. State changes happen through the named workflows WF-01 and WF-02.