Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Power Plant Operations
- Meter source
- Plant control system
- Commercial settlement
Power Plant Operations keeps generating sites, operating units, output intervals, meter observations and response work in a connected operating record. A unit belongs to an operational event, and a generation interval belongs to a unit.
Approval conditions
| Id | Event type | Started at | Description | Site | Status | |
|---|---|---|---|---|---|---|
| GEN-2026-0412 | Outage | 06 Nov | Unit 2 tripped during startup | Stone Ridge peaking station | Open | |
| MNT-2026-0198 | Maintenance | 19 Nov | Feeder voltage rose above limit | Willow Creek energy center | Open | |
| EVT-2026-0074 | Alarm | 22 Nov | Cooling pump seal showed leakage | Marsh Point generation yard | Open | |
| SITE-016 | Curtailment | 24 Nov | Steam pressure fell during ramp | Stone Ridge peaking station | Open | |
| MTR-0284 | Outage | 05 Nov | Fuel sensor returned unstable flow | East Vale utility site | Open |
Operations Reviewer accepts or rejects a received energy interval after inspecting its meter observations.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep plant locations and the people responsible for site work clear.
Sites
| Id | Site name | Location | Timezone | Status | |
|---|---|---|---|---|---|
| GEN-2026-0412 | Cedar Basin power station | Cedar Basin, Nevada | America/Los_Angeles | Active | |
| MNT-2026-0198 | North Mesa generating plant | North Mesa, Arizona | America/Denver | Active | |
| EVT-2026-0074 | Willow Creek energy center | Willow Creek, Oregon | America/Phoenix | Active | |
| SITE-016 | Stone Ridge peaking station | Stone Ridge, Utah | America/Boise | Active | |
| MTR-0284 | Riverbend thermal plant | Riverbend, Idaho | America/Chicago | Active |
Keep unit capacity, fuel type and operating state attached to a plant event.
Generation intervals
| Id | Starts at | Ends at | Energy MWh | Fuel quantity | Fuel unit | |
|---|---|---|---|---|---|---|
| GEN-2026-0412 | 06 Nov | 10 Nov | 270 | 490 | million British thermal units | |
| MNT-2026-0198 | 15 Nov | 20 Nov | 690 | 870 | therms | |
| EVT-2026-0074 | 17 Nov | 22 Nov | 730 | 230 | gallons | |
| SITE-016 | 12 Nov | 16 Nov | 120 | 560 | liters | |
| MTR-0284 | 13 Nov | 18 Nov | 290 | 660 | tonnes |
Review output and fuel consumption over a defined period for each unit.
Generating units
Inspect source readings before accepting a derived energy period.
Meter readings
| Id | Read at | Value | Quality flag | Meter | |
|---|---|---|---|---|---|
| GEN-2026-0412 | 13 Nov | 690 | Estimated | Water treatment usage meter | |
| MNT-2026-0198 | 18 Nov | 200 | Missing | Unit 2 fuel flow meter | |
| EVT-2026-0074 | 09 Nov | 850 | Invalid | East feeder export meter | |
| SITE-016 | 05 Nov | 250 | Estimated | Auxiliary power meter | |
| MTR-0284 | 23 Nov | 630 | Missing | East feeder export meter |
Follow plant interruptions from first report through recovery.
Maintenance tasks
| Id | Task | Due date | Status | Site | Assigned to | |
|---|---|---|---|---|---|---|
| GEN-2026-0412 | Inspect turbine inlet filters | 09 Nov | Open | North Mesa generating plant | Nikhil Shah | |
| MNT-2026-0198 | Calibrate export meter | 13 Nov | Approved | East Vale utility site | Nora Mensah | |
| EVT-2026-0074 | Replace cooling pump seal | 06 Nov | In progress | Willow Creek energy center | Elena Petrov | |
| SITE-016 | Test emergency generator | 09 Nov | Completed | Riverbend thermal plant | Nikhil Shah | |
| MTR-0284 | Clean intake screens | 10 Nov | Open | Willow Creek energy center | Sofia Reyes |
Assign site response and follow each task to completion.
People
| Id | Name | Role title | Active | User | |
|---|---|---|---|---|---|
| GEN-2026-0412 | Amina Farouk | Control room operator | Active | Carlos Mendoza | |
| MNT-2026-0198 | Carlos Mendoza | Maintenance planner | Inactive | Priya Desai | |
| EVT-2026-0074 | Priya Desai | Electrical technician | Active | Jonas Berg | |
| SITE-016 | Jonas Berg | Plant supervisor | Inactive | Mei Okafor | |
| MTR-0284 | Mei Okafor | Instrumentation specialist | Active | Nikhil Shah |
Keep a dated site rate available for operational review.
Tariffs
| Id | Effective from | Effective to | Rate per unit | Unit | Site | |
|---|---|---|---|---|---|---|
| GEN-2026-0412 | 17 Nov | 23 Nov | 30 | megawatt hours | Cedar Basin power station | |
| MNT-2026-0198 | 11 Nov | 17 Nov | 490 | kilowatt hours | East Vale utility site | |
| EVT-2026-0074 | 09 Nov | 18 Nov | 190 | MW | East Vale utility site | |
| SITE-016 | 12 Nov | 17 Nov | 440 | therms | Willow Creek energy center | |
| MTR-0284 | 09 Nov | 12 Nov | 750 | million British thermal units | Marsh Point generation yard |
Plant operating cycle ships ready to use. One step needs a named approval before the work moves on: Validate energy intervals (Operations Reviewer).
Identify each site, person, meter and generating unit before the shift begins.
Keep output and fuel quantity together for each unit and period.
Review the time, value and quality flag of each observation.
Have the Operations Reviewer decide on a received energy period.
Acknowledge an outage or alarm and assign site work where needed.
Let the assigned technician record progress and completion.
Open any operational event to see its generating units, the roles that work on it, its process stages and its approvals on one page.
Started at, Description, Site and Status.
Each line is linked to this operational event.
Plant Operator, Operations Manager and Maintenance Technician, each with their own permissions.
Prepare sites and units, with the role that acts.
Validate energy intervals, with who decides.
Unit 2 tripped during startup · Outage
| Id | Unit name | Rated MW |
|---|---|---|
| GEN-2026-0412 | Cedar Basin gas turbine 1 | 90 |
| MNT-2026-0198 | Cedar Basin gas turbine 2 | 580 |
| EVT-2026-0074 | North Mesa steam unit 1 | 330 |
An Operations Reviewer checks energy intervals and decides whether a received period is valid.
Signed in as Operations Reviewer
| Decision | Approver | |
|---|---|---|
| Validate energy intervalsHave the Operations Reviewer decide on a received energy period. | Operations Reviewer | |
| Approve energy intervals | Operations Reviewer |
Everyone opens Power Plant Operations to the work that is theirs. Pick a role to see what it starts with.
Records unit operating state, generation intervals, meter readings and operational events at the plant.
This is the first screen this role sees.
Energy intervals · Plant Operator
Checks reading quality and decides whether a received energy interval is valid.
This is the first screen this role sees.
Energy intervals · Operations Reviewer
Owns plant response, task assignment and review across sites.
This is the first screen this role sees.
Maintenance tasks · Operations Manager
Works assigned site maintenance and records its outcome.
This is the first screen this role sees.
Maintenance tasks · Maintenance Technician
Maintains people, access and core plant records.
Review generation, meter quality and site response from their source records.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Open | 31 | ||
| Acknowledged | 15 | 48% | |
| Resolved | 7 | 47% |
Sample counts per stage
Summarizes energy M wh by Unit across starts at and ends at.
Summarizes fuel quantity and fuel unit against each linked Unit.
Groups meter readings by Meter and quality flag over read at.
Groups energy intervals by Meter and Status with energy quantity.
Compares event type, Status, started at and ended at by Site.
Groups maintenance tasks by Site, assigned to, Status and due date.
Lists generating units with unit name, rated MW, fuel type and Status.
Lists Tariffs by Site, effective from, effective to, rate per unit and Unit.
See how Power Plant Operations fits your kind of team.
Each stage of plant operating cycle names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to help staff inspect plant records and prepare decisions.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
Enter sites, timezones, operating status and the people responsible for each facility.
Enter meters with their reading mode and units, then name generating units and their fuel types.
Record a generation period and meter observation, then have a reviewer decide on the received energy interval.
Raise an event, acknowledge it, assign site work and record recovery and task completion.
Check that quantities retain their units and that time periods and site references stay clear in each report.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Power Plant Operations for your business. Start with a site, its generating units, meters and staff; then rehearse one shift of readings and response work.
Each generation interval records its unit, start and end, energy output, fuel quantity and fuel unit. The unit record carries its name, rated capacity, fuel type and operating state.
Readings keep their time, value, meter and quality flag. An Operations Reviewer examines a received energy interval and decides whether to validate or reject it.
Yes. The meter reading quality flag includes Estimated, so it stays visible in Meter Reading Exceptions for review.
A Plant Operator records an operational event at the site with its actual start time. The Operations Manager acknowledges it and assigns maintenance work where needed.
Assigned Maintenance Tasks shows open work and its named assignee. Each task also has a site, due date and status.
Generation intervals hold fuel quantity and fuel unit against the linked generating unit. Review the period and unit together when comparing results.
Tariffs record a rate per unit and its effective dates for a site. Review the dated period when using a rate in another business process.
Give every site its own name, location and timezone. Attach meters, events, tasks and rates to the correct site before comparing their records.
Start free, then use Proto to change fields, steps and approvals before your team goes live.