1. Production Dashboard
  2. Features
  3. Work order control
Feature · Work order control

Work order control

Release a specific draft only when its approved demand, quantity, resource and schedule are eligible.

OverviewDraft work order release checks
Production Dashboard · Work order control

Draft work order release checks

Approval conditions

New
NameProductOrderResourcePlanned quantityPlanned start
Order 516ITM-4523ORD-6041RSR-64866024 Oct
Order 491ITM-3386ORD-2033RSR-924594022 Oct
Order 145ITM-6161ORD-7659RSR-265228015 Oct
Order 690ITM-9265ORD-7167RSR-704665027 Oct
Order 992ITM-7441ORD-5051RSR-736614015 Oct
6 of 6 records
Order 516Work orders · WO-68803
Draft
ProductITM-4523
OrderORD-6041
ResourceRSR-6486
Planned quantity60
Planned start24 Oct
Example screen with sample data

What you can do

Give the floor a checked production instruction

Each work order connects product, order and resource with planned quantity, planned start, planned end and status. Production Planner uses the work release action to release the exact Draft record after its prerequisites pass. The linked sales order must already be Approved, and the resource must be available for a feasible non-overlapping interval.

The order reference preserves the demand context for the run. Sales order lines identify ordered items and quantities, while the order links to the customer record. These records help the planner check the intended work. The planner follows that demand context before handing the instruction to the operator.

How the work is organized

Release freezes the inputs used for the decision. A later change to a product, resource or planned quantity needs review under the operating amendment rules. The released instruction should remain explainable against the version the planner checked.

  • Eligible draft. Start from the exact work order in Draft and inspect its linked demand.
  • Release checks. The work release action validates actor identity, approved order, positive planned quantity, resource availability and the complete schedule.
  • Floor handoff. Successful release changes status from Draft to Released; batch identity is created when production begins through the production interval action.

What to agree during setup

Confirm who provides approved sales orders and how that approval is verified before release. Manager owns the business approval prerequisite. Agree the approval path or controlled import from the system that owns the order decision, then test that evidence before live release.

Agree how planned intervals reflect actual resource capacity and operating dates. Review the resource’s daily capacity and availability alongside the agreed operating dates. Preserve an explicit planning basis and test the release workflow’s feasible-schedule checks. A resource marked Maintenance cannot become available merely because a draft has a desirable delivery date.

Check the handoff on an actual case

Production Planner prepares a work order for a finished product linked to an Approved customer order. They choose an Available resource, positive planned quantity and a feasible planned start to planned end interval. The work release action resolves the planner through the staff record’s linked user account, validates the frozen inputs and returns the released work order.

Prepare another draft for the same resource with an overlapping interval. Its release should be rejected even when the customer demand is valid. Moving the second interval requires a fresh check against all relevant work; changing only the start date is insufficient if the intervals still overlap.

Also rehearse an order still in Draft and a work order with zero planned quantity. Both must fail their release prerequisites. After a successful release, inspect batches and confirm that release alone has not created a production lot. The operator’s later production action is responsible for that identity.

What your team sees

Configure distinct views for preparation and released work:

  • Open work orders — See active production instructions with demand, product, resource and planned quantity.
  • Draft work order release checks — Review drafts whose release prerequisites still need attention.
  • Work order board — Discuss the recorded production lifecycle without inferring approval authority from a board column.

Follow the work through

Draft to released work defines the handoff. Follow released work into material issue to production log and check the roles before enabling actions.

What it keeps track of

Data model
Work orders
Production work orders released to the shop floor.
Orders
Customer sales orders.
Order lines
Line items on customer orders.
Parties
Customers and suppliers.
Items
Materials, components and finished goods.
Resources
Production work centers and machines.
People
Production staff and their linked platform user accounts.

Who uses it

Permissions
Production Planner
, Production Operator, Quality Reviewer, Manager.
Production Planner
Releases eligible drafts; Production Operator reads assigned instructions.
Quality Reviewer
Reads the linked production context.
Manager
Reviews the approved demand basis before it reaches release.

Set up Production Dashboard your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started