All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Quality Management
  2. Features
  3. Corrective Actions
Feature · Corrective Actions

Corrective Actions

Assign a correction, retain its root cause and verify effectiveness before closing the issue.

OverviewMy corrective actions
Quality Management · Corrective Actions

My corrective actions

Corrective actions

New
NonconformanceOwnerActionDue dateStatus
Valve body bore outside toleranceMei ChenReplace worn fixture stop12 NovPlanned
Mixed revisions in finished kitsHana SatoAdd torque signoff to traveler29 NovApproved
Bracket burrs on mounting edgeOmar FaroukRequire protective carton spacers19 NovImplementing
Bracket burrs on mounting edgeOmar FaroukIssue corrected wiring diagram10 NovEffectiveness review
Bracket burrs on mounting edgeElena MoralesShorten gauge calibration interval13 NovClosed
6 of 6 records
Replace worn fixture stopCorrective actions · CA-24843
Planned
NonconformanceValve body bore outside tolerance
OwnerMei Chen
Due date12 Nov
Example screen with sample data

What you can do

Give each correction a traceable owner

Corrective actions connect to a nonconformance and an Owner in People. The record states the root cause, planned action and due date. Its status follows Planned, Approved, Implementing, effectiveness review and Closed. Those states let Quality Manager distinguish a planned response from an approved one, completed implementation from an effectiveness decision, and one finished action from a fully closed issue.

The correction workflow starts with an assigned owner submitting evidence for the action. It validates the retained root cause and approved action before moving the record to effectiveness review. An independent reviewer tests whether the action addressed the problem. The linked nonconformance can close only after every linked action has closed. That is the decision boundary the team should rehearse, especially when an issue needs more than one action.

How the work is organized

  • Plan. Quality Manager links the action to the issue, names the owner and captures the root cause, work and due date.
  • Implement. The assigned owner carries out the approved work and submits the completed work for review.
  • Verify. Quality Approver checks effectiveness independently and decides whether closure is justified.

The action text needs enough specificity to test. “Retrain staff” is hard to verify on its own; a concrete work instruction and a later observed result give the reviewer something to inspect. Use the linked inspection and nonconformance as the starting evidence, then document what changed and why it should prevent recurrence.

What to agree during setup

Define who can approve an action before implementation and how independent effectiveness review is assigned. The reviewer should not be the owner who submitted the completed work. Set a convention for due dates and for recording the completion date after the work is done. Establish what constitutes sufficient effectiveness evidence for different severities; the record’s action and root cause are the context for that decision.

Quality Manager should review actions due soon and those already in effectiveness review. The first group needs owner attention; the second needs a reviewer decision. Keeping the two queues separate prevents a completed task from being mistaken for a verified correction.

Check the handoff on an actual case

The surface defect on Q-104 produces a linked nonconformance. The owner records a root cause in the handling step and an approved action to change the handling method. After implementation, the owner submits the completed work for review. The workflow checks the retained root cause and approved action and moves the action into effectiveness review. Quality Approver compares the new result with the failed inspection evidence and decides whether the action was effective.

Now add a second action for the same issue, perhaps a revised check instruction. If the handling action closes but the instruction action remains under review, the nonconformance must remain open. Rehearse that case with the team. It tests the real closure rule and makes the reviewer’s authority visible where it matters.

What your team sees

  • My corrective actions — Work linked to the signed-in owner’s issue and due date.
  • Actions for effectiveness review — Submitted actions ready for the independent effectiveness decision.
  • Open nonconformances — The source issues that remain active until every linked action closes.

Follow the work through

What it keeps track of

Data model
Corrective actions
Corrective Actions record for Quality Management.
Nonconformances
Nonconformances record for Quality Management.
Inspections
Inspections record for Quality Management.
People
People records for Quality Management.
Users
Sign-in accounts for the people who use the app.

Who uses it

Permissions
Quality Manager
Coordinates actions. Assigned Inspector or other owner submits work.
Quality Approver
Reviews effectiveness and authorizes closure.

Set up Quality Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appQuality Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.