All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Recipe / Formulation Mgmt
  2. Features
  3. Batch quality
Feature · Batch quality

Batch quality

Keep pending, held and rejected lots visible while the authorized reviewer decides whether accepted output can be received.

OverviewBatches Awaiting Quality Review
Recipe / Formulation Mgmt · Batch quality

Batches Awaiting Quality Review

Approval conditions

New
IdWork orderLot numberProduced atExpiry dateDisposition
WO-2026-1048Lemon herb dressing, 800 kg runL26-321522 Nov01 DecPending
PO-2026-0312Maple granola, 1,200 kg runL26-076514 Nov19 NovPending
RV-2026-0027Ginger citrus concentrate, trial runL26-567828 Nov04 DecPending
BATCH-2026-141Roasted garlic dip, wholesale runL26-392807 Nov14 NovPending
ISS-2026-0904Ginger citrus concentrate, trial runL26-524523 Nov28 NovPending
6 of 6 records
WO-2026-1048Batches · BTC-64359
Pending
Work orderLemon herb dressing, 800 kg run
Lot numberL26-3215
Produced at22 Nov
Expiry date01 Dec
Example screen with sample data

What you can do

Make the output decision explicit

A batch identifies produced output through its work order and lot number, with production and expiry dates for the team’s review. Its disposition distinguishes Pending, Released, Held and Rejected output. Quality Reviewer decides eligible accepted output through the guarded release action after inspecting the required production and quality evidence.

The reviewer reads the underlying records and uses the authorized workflow to make the release decision. This matters when preparing access: the pending queue supplies operating context, while the action checks the actor and the output. Production Operator’s ability to read the batch supports the handoff without granting the reviewer’s decision authority.

How the work is organized

Production Operator records the completed production interval and reported output. Production Planner follows the linked work and investigates discrepancies. Quality Reviewer approves inspected accepted output. A successful release receives finished goods once and then completes the linked work order.

  • Review the pending lot. Open its production work and inspect the product and interval evidence before deciding.
  • Respect adverse outcomes. Keep Held and Rejected output outside the accepted-release action while the responsible people investigate.
  • Confirm the receipt. Inspect the successful release result so a repeat action cannot receive the same finished output again.

What to agree during setup

Agree how the team’s testing source supplies inspection evidence and accepted production output to the release request. Demonstrate those inputs during the operating rehearsal with the source owner present. The reviewer needs to know which evidence applies to the lot being presented and how to investigate a contradictory result.

Choose who maintains the recorded expiry date and who investigates Held or Rejected output. Agree any later recovery or disposition procedure before attempting a changed outcome. Staff should retain the original production and decision context so the later action can be explained to the responsible reviewer.

Check the handoff on an actual case

Use a rehearsal batch whose production interval has been saved and whose disposition is Pending. Quality Reviewer inspects the required evidence and submits the accepted-output action. Verify that the successful result identifies the released batch, the finished-goods receipt and completion of the intended production work.

Submit the same release request again and inspect the response. Already-received output must be rejected rather than creating another inventory receipt. Repeat with an otherwise similar batch marked Held and then Rejected. Neither adverse outcome may pass the accepted-release action merely because the underlying production interval has a positive good quantity.

Try the request using an ordinary Production Operator account. The unauthorized actor must fail even when the operator can read the batch and entered the production evidence. Ask the reviewer to show the actual decision result behind the release. Use that result and the balance effect when reconciling output at the end of the rehearsal.

What your team sees

  • Batches Awaiting Quality Review — Inspect Pending lots with their production and expiry dates before deciding.
  • Held and Rejected Batches — Keep blocked outcomes visible for investigation with the responsible team members.
  • Production Interval Register — Review the reported production evidence behind the selected lot.

Follow the work through

Rehearse production to quality release with a repeat request and a held lot. Confirm identity and action access on the roles page, then review implementation before expanding the operating cycle.

What it keeps track of

Data model
Batches
Produced batch identity, lot number, expiry and quality disposition.
Work orders
Released production work for a product, order and resource.
Production logs
Operator-captured production intervals with good and scrap units.
Inventory balances
Item quantity on hand and reserved by location and lot.
Items
Materials, components and finished goods with standard cost and unit of measure.
People
Production staff and their role titles.
Users
Sign-in accounts for the people who use the app.

Who uses it

Permissions
Quality Reviewer
Owns accepted-output approval.
Production Planner
Owns production setup, planning and assigned operational work. Record entry on production and commercial tables; read-only on People and Inventory Balances.
Production Operator
Captures assigned production work and evidence. Record entry limited to Production Logs, Material Issues and Recipe Ingredients; referenced setup records are read-only context.
Admin
The planner and operator provide the production context.

Set up Recipe / Formulation Mgmt your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appRecipe / Formulation Mgmt

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.