All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Recipe / Formulation Mgmt
  2. Features
  3. Production evidence
Feature · Production evidence

Production evidence

Capture completed operator intervals and good and scrap quantities before the batch goes to quality review.

OverviewProduction Interval Register
Recipe / Formulation Mgmt · Production evidence

Production Interval Register

Production logs

New
IdNameWork orderOperatorStarted atEnded at
WO-2026-1048Oat drink blending, morning shiftLemon herb dressing, 800 kg runJonah Becker07 Nov15 Nov
PO-2026-0312Spread milling, afternoon shiftMaple granola, 1,200 kg runJonah Becker19 Nov17 Nov
RV-2026-0027Dressing fill, line 3Maple granola, 1,200 kg runNina Sato19 Nov17 Nov
BATCH-2026-141Sauce cook, kettle K3Berry yogurt base, overnight runNina Sato06 Nov12 Nov
ISS-2026-0904Granola bake, first shiftRoasted garlic dip, wholesale runPriya Nair23 Nov17 Nov
6 of 6 records
WO-2026-1048Production logs · PL-31686
NameOat drink blending, morning shift
Work orderLemon herb dressing, 800 kg run
OperatorJonah Becker
Started at07 Nov
Ended at15 Nov
Example screen with sample data

What you can do

Keep the interval behind the output

A production log records the start and end of an operator’s completed interval with reported good and scrap quantities. Its work-order link identifies the intended product and production basis. Its operator link identifies the staff member whose evidence the team is reviewing. The recording action validates the completed interval and routes output to pending quality review.

Quality Reviewer can inspect the interval alongside the batch awaiting a decision. Keep reported output separate from the later accepted-output receipt when discussing progress. Production Planner helps resolve unexpected product or work-order context before the reviewer decides whether eligible output can be released.

How the work is organized

Production Operator captures the interval under the configured record-entry permissions. Production Planner inspects the linked work and can follow the recipe’s production context. Quality Reviewer reads the production evidence before making the batch decision. Business Overview brings production work and its supporting evidence under a shared filter scope.

  • Preserve the interval. Enter the actual start and end of the completed work period supplied to the recording action.
  • Attribute the work. Select the correct operator and check the staff account link used by the submission route.
  • Separate the outcome. Record the good and scrap quantities, then follow the batch disposition through the quality decision.

What to agree during setup

Agree how the team interprets output quantities for each finished product. Use the linked production work and its product unit when comparing reported amounts. Staff should be able to explain the quantity basis before combining results or discussing a difference from the planned amount.

Choose a timestamp convention for shifts and rehearse a completed interval with an ordinary operator account. Check how the action responds to an incomplete or invalid interval. Agree who investigates wrongly attributed work and how a correction reaches Quality Reviewer when production evidence has already been submitted.

Check the handoff on an actual case

Prepare eligible production work and submit a completed rehearsal interval with a good quantity of 240 and scrap quantity of 10. Inspect the saved work-order and operator links, then find the output batch routed to Pending quality review. Ask the operator to explain the reported quantity basis using the intended finished product.

Quality Reviewer opens the same production context and inspects the required batch evidence. A positive good quantity represents the operator’s report; the reviewer still decides eligible accepted output through the separate release action. Follow the successful receipt result before using the batch as received finished stock.

Repeat with an account whose staff identity cannot resolve and an interval that has not been completed. Inspect the returned validation outcome and correct the source problem before resubmitting. Rehearse a later correction with the responsible team member, preserving the earlier interval context so the reviewer can understand what changed.

What your team sees

  • Production Interval Register — Inspect completed-date intervals with their operator, production work and reported quantities.
  • My Production Logs — Review your recorded intervals and quantities for the work you performed.
  • Batches Awaiting Quality Review — Open output still waiting for the authorized quality decision.

Follow the work through

Use production to quality release to inspect the full handoff. Review production release when an interval points to unexpected work, and prepare analytical questions on the reports page.

What it keeps track of

Data model
Production logs
Operator-captured production intervals with good and scrap units.
Work orders
Released production work for a product, order and resource.
People
Production staff and their role titles.
Users
Sign-in accounts for the people who use the app.
Items
Materials, components and finished goods with standard cost and unit of measure.
Batches
Produced batch identity, lot number, expiry and quality disposition.

Who uses it

Permissions
Production Operator
Captures assigned production work and evidence. Record entry limited to Production Logs, Material Issues and Recipe Ingredients; referenced setup records are read-only context.
Production Planner
Owns production setup, planning and assigned operational work. Record entry on production and commercial tables; read-only on People and Inventory Balances.
Quality Reviewer
Reviews evidence and authorizes eligible domain outcomes. Read-only across every table; approval decisions belong to the guarded workflows.
Admin
The operator captures evidence, the planner resolves work context and the reviewer decides eligible batch release.

Set up Recipe / Formulation Mgmt your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appRecipe / Formulation Mgmt

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.