All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Shop Floor Control
  2. Features
  3. Batch Release
Feature · Batch Release

Batch Release

Review each production lot before accepted output becomes finished stock and the work order can complete.

OverviewQuality Release Inbox
Shop Floor Control · Batch Release

Quality Release Inbox

Approval conditions

New
IdLot numberWork orderProduced atExpiry dateDisposition
WO-2026-0412L26-3522Mold cable guides for order 4521823 Nov02 DecPending
ORD-45182L26-8274Assemble manifolds for order 4520708 Nov15 NovPending
BATCH-2604-18L26-0400Weld hinges for order 4524513 Nov22 NovPending
ISSUE-2026-0161L26-6773Pack gasket sets for order 4526616 Nov21 NovPending
ANDON-2026-0087L26-0271Mold cable guides for order 4521819 Nov25 NovPending
6 of 6 records
WO-2026-0412Batches · BTC-70139
Pending
Lot numberL26-3522
Work orderMold cable guides for order 45218
Produced at23 Nov
Expiry date02 Dec
Example screen with sample data

What you can do

Keep the acceptance decision attached to the lot

A batch identifies produced output by lot number and work order, with production and expiry dates where relevant. Its disposition can be Pending, Released, Held or Rejected. Quality Reviewer uses the production history and the team’s inspection evidence to decide whether eligible output can be released.

The accepted-output action checks the release state and output that has not already been received. A successful release receives finished goods once. The work order completes after the full scope is covered. This gives Production Planner a way to distinguish a job that has reported production from one whose accepted output has completed the handoff into stock.

How the work is organized

  • Lot context. Review the lot alongside its linked work order and production date. Keep the lot convention consistent with the stock handoff so the floor and inventory team refer to the same output.
  • Disposition decision. Quality Reviewer decides on acceptance. Pending output stays in the review queue; Held and Rejected identify cases that need the corresponding operating response.
  • Receipt effect. The release action checks unreceived accepted output before receiving stock. Review that result together with the work order’s remaining scope when deciding whether production is complete.

What to agree during setup

Agree the evidence Quality Reviewer needs before accepting a batch. If inspection results live in a laboratory or quality system, set up that connection and keep its ownership explicit. Decide how the reviewer finds the relevant evidence from the lot and work order and how the floor learns that a batch needs attention.

Set the operating procedure for Held and Rejected output, including who arranges physical segregation and who can request another review. Agree when an expiry date is appropriate for the product. Rehearse the release action under the reviewer’s account, including the distinction between reading a batch and authorizing its stock effect. Also agree how the planner will reconcile incomplete scope after a partial production run.

Check the handoff on an actual case

Use the bracket run with 116 reported good units and 4 scrap units. Quality Reviewer opens the Pending batch, checks the lot against the work order and reviews the inspection evidence. If the output is acceptable, release the eligible quantity and inspect the resulting finished-stock balance. Repeat the release request and confirm that the same output cannot be received again.

Then rehearse a second batch that must be Held because the inspection is unresolved. Confirm that it stays out of the accepted-stock handoff while Production Planner can still see the related job. The target quantity, scrap treatment and remaining scope should determine whether more work is required. Do not close the rehearsal until the planner and reviewer agree which output is accepted and why the work order is either still open or complete.

What your team sees

  • Quality Release Inbox — Pending lots awaiting an acceptance decision from Quality Reviewer.
  • Batch Disposition Board — Lots grouped by Pending, Released, Held and Rejected disposition.
  • Stock by Lot — On-hand finished stock after an accepted receipt has been applied.

Follow the work through

Continue with accepted output release and review the implementation rehearsal.

What it keeps track of

Data model
Batches
Produced lots and their disposition
Work orders
Production work orders
Production logs
Operator production intervals with good and scrap units
Inventory balances
On-hand and reserved quantities by item, location and lot
Items
Materials, components and finished goods

Who uses it

Permissions
Quality Reviewer
Makes the acceptance decision.
Production Planner
Follows remaining work.
Production Operator
Can read batch disposition when planning the next floor action.

Set up Shop Floor Control your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appShop Floor Control

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.