1. Shop Floor Control
  2. Features
  3. Station Escalations
Feature · Station Escalations

Station Escalations

Raise an Andon event for a station, explain its reason and retain the resolution used to restore production.

OverviewAndon Event Review
Shop Floor Control · Station Escalations

Andon Event Review

Andon events

New
IdStationOpened atReasonResolved atResolution
IDD-122RSR-587815 OctMaterial15 OctRSL-286
IDD-320RSR-348704 OctEquipment05 OctRSL-181
IDD-337RSR-267514 OctQuality15 OctRSL-736
IDD-244RSR-130109 OctSafety13 OctRSL-418
IDD-699RSR-313507 OctMaterial10 OctRSL-168
6 of 6 records
IDD-122Andon events · AE-31889
Material
StationRSR-5878
Opened at15 Oct
Resolved at15 Oct
ResolutionRSL-286
Example screen with sample data

What you can do

Give a station interruption a clear record

Production Operator raises an Andon event against the affected station. The event records when the interruption opened, a reason of Material, Equipment, Quality or Safety, and the resolution with its completion time. Submission validates the station, event dates, reason and resolution before applying the station state.

Production Planner uses that event in the context of released work and operator assignments. A station problem can change which work is ready to run and whether a later release should wait. Quality Reviewer can inspect the same event when an interruption affects the decision on produced output. The reason should describe the operational problem clearly enough for the next person to understand why the station needs attention.

How the work is organized

  • Station link. Attach the event to the resource where the problem occurred. A specific station lets the planner compare the interruption with assignments and the jobs scheduled there.
  • Reason and timing. Choose the relevant reason and record the opening time. Keep the event’s timing accurate so a later review can distinguish an unresolved interruption from a completed one.
  • Resolution. Explain what was done and when the event was resolved. The station response follows the validated submission and the operating rule agreed for that reason.

What to agree during setup

Agree what the team means by each Andon reason and who should respond on the floor. A missing material lot and a machine fault need different practical responses even though both can stop work at the same station. Keep the choices understandable to operators who must raise an event while production is interrupted.

Decide how each event situation affects resource availability and how the station becomes ready again. Review that rule with Production Planner before release depends on it. Establish how operators communicate urgent events to the responsible people and how any notification connection will work. The event record should support that response with a clear opening time and resolution, rather than relying on an unexplained change to the resource.

Check the handoff on an actual case

During a bracket run, Production Operator raises an Equipment event against the press. Check that the event points to the correct station and that its opening time corresponds to the interruption. Production Planner reviews the affected station’s assignments and considers the impact on the next work order. Follow the agreed station-state rule and confirm the resource reflects the intended operating response.

When the problem is resolved, record the corrective action and a resolution time after the event opened. Rehearse an earlier resolution time and an incomplete resolution to see the validation response. Then submit a valid resolution and inspect the station again before allowing another release. Finish by asking a different operator to explain the interruption from the saved record. The history should make sense without relying on the original operator’s memory.

What your team sees

  • Andon Event Review — Station events with their reason, opening time and resolution available for floor review.
  • Station Assignments — Operator intervals that help the planner locate affected work.
  • Available Resources — Resource readiness after the station response has been checked.

Follow the work through

What it keeps track of

Data model
Andon events
Shop floor escalation events
Resources
Machines and work centers
Operator assignments
Operator to station assignments per work order
Work orders
Production work orders

Who uses it

Permissions
Production Operator
Submits the event and resolution.
Production Planner
Coordinates affected work.
Quality Reviewer
Reads events relevant to output acceptance.

Set up Shop Floor Control your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started