All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

Smart Meter Data Platform · Available now

Smart meter data with validated intervals.

Smart Meter Data Platform connects verified meter interval readings with the service case and source evidence that support acceptance. Utility Coordinator prepares the meter identity, interval end, energy value and quality flag.

  • No per-user fees
  • Manual work is free
  • Configure it in Proto
OverviewInterval Readings
Smart Meter Data Platform · Interval readings

Interval Readings

approval waits for the authorized utility supervisor

New interval reading
Interval readings in view
6
Total energy kWh
3,540
Submitted
6
Interval end within 14 days
3
IdMeterInterval endEnergy kWhQuality flagParent
READ-2026-08412Meter NR-1048211 Nov720ValidatedWillow Creek interval gap
READ-2026-08413Meter EB-2081714 Nov490EstimatedMaple Heights meter exchange
READ-2026-08414Meter WC-3301418 Nov210Missing intervalEastbank meter clock drift
READ-2026-08415Meter HD-1180920 Nov520Clock adjustedPineview voltage alert
READ-2026-08416Meter PV-4027620 Nov920Duplicate readingWillow Creek interval gap
6 of 6 records
READ-2026-08412Interval readings · IR-41667
Submitted
MeterMeter NR-10482
Interval end11 Nov
Energy kWh720
Quality flagValidated
ParentWillow Creek interval gap
Review EvidenceIR-41667 · READ-2026-08412

Authorized Utility Supervisor independently approves, rejects or returns the identified source evidence with a reason.

Waiting for Authorized Utility Supervisor
ApproveReturn
Example screen with sample data
Tables, ready to use
10
Saved views
15
Roles with set permissions
5
Reports and dashboards
8
Features

Review the interval and its source

Every feature works on the same records. Pick one to see the screen your team works in.

Meter Interval Acceptance

Review submitted meter intervals with their quality context and independent decision before accepting the recorded result.

  • Reading identity
  • Independent decision
  • Guarded acceptance
  • Interval readings
  • Service cases
  • Organizations
  • Service evidence
  • Review decisions
  • Operation receipts
Explore meter interval acceptance
OverviewDraft Meter Intervals
Smart Meter Data Platform · Meter Interval Acceptance

Draft Meter Intervals

Submission waits for the utility coordinator

New
IdMeterInterval endEnergy kWhQuality flagParent
READ-2026-08412Meter NR-1048220 Nov640ValidatedRiverbend service interruption
READ-2026-08413Meter EB-2081718 Nov480EstimatedPineview voltage alert
READ-2026-08414Meter WC-3301408 Nov150Missing intervalMaple Heights meter exchange
READ-2026-08415Meter HD-1180909 Nov920Clock adjustedPineview voltage alert
READ-2026-08416Meter PV-4027626 Nov360Duplicate readingEastbank meter clock drift
6 of 6 records
READ-2026-08412Interval readings · IR-59074
MeterMeter NR-10482
Interval end20 Nov
Energy kWh640
Quality flagValidated
ParentRiverbend service interruption
Example screen with sample data
Process

From source evidence to accepted data

Source evidence to accepted interval ships ready to use. 2 steps need a named approval before the work moves on: Review Evidence (Authorized Utility Supervisor) and Accept Interval (Authorized Utility Supervisor).

Drag a card to another stage, or focus it and use the arrow keys. It updates to match the stage.

  1. Capture Case

    Record the actual incident, affected scope and service-area context with an accountable owner.

    READ-2026-08412IR-41667 · Utility Coordinator
    Capture CaseBy Utility Coordinator
  2. Review Evidence

    Have an independent supervisor assess the source-identified evidence and current revision.

    READ-2026-08412IR-41667 · Authorized Utility Supervisor
    Review EvidenceBy Authorized Utility Supervisor
    ApprovalAuthorized Utility Supervisor independently approves, rejects or returns the identified source evidence with a reason.
  3. Submit Interval

    Present the intended meter interval with its energy value and original quality designation.

    READ-2026-08412IR-41667 · Utility Coordinator
    Submit IntervalBy Utility Coordinator
  4. Accept Interval

    Independently review the reading and execute eligible acceptance while rejecting duplicates.

    READ-2026-08412IR-41667 · Authorized Utility Supervisor
    Accept IntervalBy Authorized Utility Supervisor
    ApprovalAuthorized Utility Supervisor independently approves the intended interval revision before eligible acceptance proceeds.
  5. Confirm Restoration

    Use authorized field confirmation and reconciled affected scope for the restoration outcome.

    READ-2026-08412IR-41667 · Utility Coordinator
    Confirm RestorationBy Utility Coordinator
  6. Reconcile Results

    Compare outstanding receipts with their linked local effects and retain the correction history.

    READ-2026-08412IR-41667 · Authorized Utility Supervisor
    Reconcile ResultsBy Authorized Utility Supervisor
Inside a record

Keep the service context in reach

Open any interval reading to see the roles that work on it, its process stages and its approvals on one page.

  1. 1
    Record details

    Meter, Interval end, Energy kWh and Quality flag.

  2. 2
    Linked records

    Records linked to this interval reading.

  3. 3
    Who works on it

    Utility Coordinator, Authorized Utility Supervisor and Auditor, each with their own permissions.

  4. 4
    Process stages

    Submit Interval, with the role that acts.

  5. 5
    Approvals

    Review Evidence and Accept Interval, with who decides.

Interval ReadingsREAD-2026-08412
Smart Meter Data Platform · Interval readings

READ-2026-08412

Meter NR-10482 · Submitted

Log activity
1
Record details
MeterMeter NR-10482
Interval end11 Nov
Energy kWh720
Quality flagValidated
3

Who works on it

  • Utility CoordinatorManage interval readings, record attachments, service cases
  • Authorized Utility SupervisorView interval readings, operation receipts, Organizations…
  • AuditorView interval readings, operation receipts, Organizations…
4

Process stages

  • Submit IntervalUtility Coordinator
5

Approvals

  • Review EvidenceAuthorized Utility Supervisor
    Approved
  • Accept IntervalAuthorized Utility Supervisor
    Waiting
Example screen with sample data
Approvals

Independent decisions on identified revisions

Authorized Utility Supervisor reads the domain and makes approval decisions through guarded workflows. Review authority is separate from direct record mutation and must apply to the intended revision and organization.

OverviewApprovals
Smart Meter Data Platform · Overview

Approvals

Signed in as Authorized Utility Supervisor

Waiting for you

4 To review1 Overdue2 Decided todayOnly mine
0 selectedApproveReturn
  • SC-17634North Ridge feeder outage
    North Ridge feeder 4Requested by Samir Qureshi
    Waiting3dActions
  • SC-64474Eastbank meter clock drift
    Eastbank meter bank 2Requested by Julian Park
    Waiting2dActions
  • SC-67221Willow Creek interval gap
    Willow Creek gateway 1Requested by Mateo Serrano
    Waiting4dActions
  • SC-14562Harbor District restoration
    Harbor District transformer 7Requested by Mateo Serrano
    Waiting3dActions

Who approves what

DecisionApprover
Review EvidenceHave an independent supervisor assess the source-identified evidence and current revision.Authorized Utility Supervisor
Accept IntervalIndependently review the reading and execute eligible acceptance while rejecting duplicates.Authorized Utility Supervisor
2 approval rules · set per role in Proto
Example screen with sample data
Roles

A workspace for each role

Everyone opens Smart Meter Data Platform to the work that is theirs. Pick a role to see what it starts with.

Utility Coordinator

Prepare assigned operational records and execute eligible reviewed actions. Own assigned organization and draft scope only.

This is the first screen this role sees.

OverviewInterval Readings

Interval Readings

Interval readings · Utility Coordinator

IdMeterInterval endEnergy kWhQuality flagParent
READ-2026-08412Meter NR-1048211 Nov720ValidatedWillow Creek interval gap
READ-2026-08413Meter EB-2081714 Nov490EstimatedMaple Heights meter exchange
READ-2026-08414Meter WC-3301418 Nov210Missing intervalEastbank meter clock drift
READ-2026-08415Meter HD-1180920 Nov520Clock adjustedPineview voltage alert
READ-2026-08416Meter PV-4027620 Nov920Duplicate readingWillow Creek interval gap
6 of 6 records
Example screen with sample data
Reports

Read quality and operational outcomes together

Read interval outcomes and service position with quality, source identity and review context visible.

Overview
Smart Meter Data Platform · Overview

Smart Meter Data Platform dashboard

This quarter

Service cases in view
6
Total affected units
2,840
Reported
2
Triaged
2

Interval readings by status

How far records got this quarter

StageReachedStep
Draft29
Submitted1862%
Approved1267%
Rejected758%

Energy kWh by status

Sample totals per stage

9.0k0
6.0kDraft
8.0kSubmitted
9.0kApproved
5.0kRejected
8.0kCompleted
Example screen with sample data
  1. 01Interval Acceptance Position

    Which readings are waiting for review, approved or recorded as completed, and what quality designation do they retain?

  2. 02Accepted Energy Review

    Which accepted value remains effective for each meter interval after reviewed corrections, with its quality designation intact?

  3. 03Source Evidence Review

    What observation, unit and source reference support the work being reviewed?

  4. 04Service Area Case Position

    Which cases and affected scope belong to each service area, and who owns the response?

  5. 05Restoration Timeline

    What reported and actual restoration times explain the case history?

  6. 06Review Decision Trace

    Who reviewed the identified source revision and what reason did they record?

  7. 07Operation Result Review

    Which action results need reconciliation against their actual effects?

  8. 08Assigned Case Workload

    Which staff members have open case work requiring a response?

Controls

Preserve the evidence behind acceptance

Each stage of source evidence to accepted interval names the role that acts and the status it records, so a change is never anonymous.

OverviewSource evidence to accepted interval
Smart Meter Data Platform · Process

Source evidence to accepted interval

Each stage, the role that acts and the status it records

Process stages
10
Approval steps
2
Roles involved
3
Tables touched
6
Triage Case
Utility Coordinator
StatusReported → Triaged → Assigned
RecordsOperation receipts
Review EvidenceApproval
Authorized Utility Supervisor
StatusAssigned → Review
RecordsOrganizations
Submit Interval
Utility Coordinator
StatusDraft → Submitted
RecordsInterval readings, Organizations
Source evidence to accepted interval
  1. Start
    Triage CaseReported → Triaged → Assigned
    Operation receipts
  2. Approval
    Review EvidenceAssigned → Review
    Organizations
  3. Step
    Submit IntervalDraft → Submitted
    Interval readings
  4. Approval
    Accept IntervalSubmitted → Approved
    Operation receipts
  5. Step
    Confirm RestorationReview → Restored
    Utility Coordinator
Example screen with sample data
AI agent

Prepare the next interval review with Proto

Use Proto to prepare interval review and inspect operational evidence within the user's authorized scope.

It can

  • Utility Coordinator: Prepare the source and quality context for a submitted interval and identify the review evidence still needed.
  • Authorized Utility Supervisor: Summarize the current revision and decision context before the supervisor independently reviews the work.
  • App Administrator: Help check organization, service-area and team-member identity mappings during setup.
  • Auditor: Trace an accepted reading through its decision and operation receipt using authorized read-only access.

Stays with a person

  • The assistant cannot replace the supervisor's independent decision or supply an authorized field confirmation that has not been obtained.
  • It must preserve quality distinctions and respect the current revision and organization scope.
  • A shared parent case does not identify the approved interval, and reconciliation must not blindly repeat external execution.
  • AI requests and connected activity use the metering described in pricing.
Integrations

Connects to the tools you use

Set up connections through ERP.AI and Proto workflows, with every change logged.

  • Smart Meter Data Platform
  • AMI and meter-data acquisition
  • Meter master data
  • Incident and field systems
  • Evidence storage
  • Downstream billing or analytics
Data model

Your data, in tables you can change

Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.

Browse all 10 tables
10tables
  • Meter Interval Acceptance6
  • Quality and Source Evidence5
  • Service Case Coordination7
  • Restoration Review5
  • Service Areas and Access5
  • Corrections and Reconciliation6
Implementation

Roll out one team at a time

Start with one team and one process, then add the rest once the basics are running.

  1. Choose the pilot

    Select a representative service case and source interval with evidence the team can trace. Name Utility Coordinator and an independent Authorized Utility Supervisor. Agree the meter identity, interval-end meaning and quality vocabulary.

  2. Establish access and scope

    App Administrator confirms organization, service-area codes and staff membership. Resolve the current user’s team-member link and test the cases and evidence each person may access.

  3. Prepare the evidence

    Record the actual incident and affected scope, then locate source observations with their units and references. Preserve quality flags and verify that each review can identify the actual interval or evidence subject under the case.

  4. Rehearse acceptance and restoration

    Submit and independently review the interval, then inspect the guarded acceptance result. Test duplicate and estimated readings. Separately rehearse authorized restoration with complete scope and a partial-scope refusal.

  5. Verify corrective work

    Request correction of accepted scope and inspect the independently reviewed compensation. Reconcile an outstanding receipt against its local effect without external re-execution. Release the operating cycle after the team can explain both successful and refused outcomes.

Pricing

$0per user

The base account and everyday work in the ERP.AI app are free, for every user.

  • No per-user or per-seat fees
  • Viewing, editing, approving and exporting records in the app is free
  • Pay only for machine work: API calls, imports, workflows and AI agents
  • Prepaid credits from $5. Purchased credits never expire

Pricing details

Machine work rate card Included per $1

Machine work rate card
UsagePer $1
Record reads (list, filter, get)20,000
Search or aggregate queries4,000
Record writes4,000
Imported or synced records200,000
Workflow runs2,000
AI agent runs2,000
Scheduled jobs or webhooks20,000
File uploads (MB)2,000
CSV or PDF exports100
FAQ

Questions, answered

Scope, rollout and pricing for Smart Meter Data Platform.

All questions
How do I get started?

Click Get started, then use Proto to configure Smart Meter Data Platform for your business. Begin with a representative service case, source interval and traceable evidence. Name the coordinator and independent supervisor, agree meter identity and quality conventions, then rehearse acceptance and its failure cases.

What does an interval record contain?

It records the meter identity, interval end, energy value and quality flag alongside its service case, organization and revision. Review and completion states distinguish preparation, submitted work and the accepted outcome.

How are duplicate intervals handled?

The guarded acceptance action rejects duplicate intervals. Agree the meter and time convention used to recognize the same source interval, then test duplicates during setup. Inspect the existing receipt when an action result is uncertain.

What happens to estimated readings?

They remain visibly distinct through the original quality designation. The supervisor reviews them under the agreed acceptance policy. Preserve that distinction in accepted-energy analysis and use controlled correction when later evidence changes accepted scope.

Who approves the reading?

Authorized Utility Supervisor independently reviews the intended revision through guarded workflows. Utility Coordinator prepares the work and executes eligible reviewed actions. Administrative membership does not confer business approval authority.

How do we identify the right decision?

Follow the action's subject, revision and operation references to the actual interval. Several readings can share a service case, so matching the parent case alone is insufficient to establish that the decision covers the intended reading.

Does an accepted interval close its service case?

No. Restoration requires authorized field confirmation and reconciled affected scope, and case closure follows evidence review. The interval's acceptance result remains distinct from the operational case outcome.

What happens if restoration covers only part of the scope?

The guarded restoration action refuses partial scope. Keep the outstanding work visible, resolve the confirmation and present the current case revision with the required evidence before requesting the complete outcome.

How are accepted readings corrected?

The owner requests correction against the current case and related evidence. Accepted or executed scope requires an independently approved compensating action that preserves the original records. Unexecuted draft scope follows the authorized cancellation path.

How do we connect AMI or downstream systems?

Configure source identities, quality vocabulary and permitted transfers with the systems your organization uses. Retain external references and confirm receiving-system outcomes separately. Start with connection setup and rehearse duplicate or uncertain results before release.

Set up Smart Meter Data Platform your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appSmart Meter Data Platform

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.