Feature · Safety permits

Safety permits

Connect permit approval and its validity interval to the work order before maintenance starts.

OverviewPermit requests
Tool & Die Management · Safety permits

Permit requests

Approval conditions

New
IdWork orderPermit typeValid fromValid toIssued by
AST-2026-0181Polish hinge forming surfacePress lockout08 Nov10 NovGreta Bauer
WO-2026-0524Inspect valve mold cooling channelsHot work29 Nov06 DecBoris Novak
SHP-2026-0113Calibrate final inspection gaugesConfined machine access18 Nov24 NovGreta Bauer
PERM-2026-0092Repair shaft fixture clampElectrical isolation25 Nov02 DecJamal Wright
LOG-2026-0714Replace worn punch insertsLifting operation20 Nov25 NovBoris Novak
6 of 6 records
AST-2026-0181Safety permits · SP-18831
Requested
Work orderPolish hinge forming surface
Permit typePress lockout
Valid from08 Nov
Valid to10 Nov
Issued byGreta Bauer
Example screen with sample data

What you can do

Check the permission to perform the work

A permit identifies the type of controlled work, its work order and the person issuing it. Its valid-from and valid-to dates define the interval the team must consider when starting maintenance. An Approved label needs to be read alongside those dates and the actual work scope.

Maintenance Manager includes the permit decision in work authorization. Technician reviews the approved interval before execution and uses the authorized start action, which checks safety and authorization. A permit that has reached Expired or Closed needs attention before the team relies on it for further work.

How the work is organized

  • Request. Record the permit type and link it to the work being authorized. Confirm the issuing person’s identity and the intended interval so the approver can make a decision against a specific maintenance request.
  • Approval. Maintenance Manager coordinates the permit approval. Where the business delegates issuing responsibility, configure Safety Permit Issuer during setup and agree which work that person may approve.
  • Use and follow-up. Technician checks the permit against the intended start. When timing or scope changes, Maintenance Manager reviews the permit position before rescheduling the maintenance and explains the decision to the assigned Technician.

What to agree during setup

Agree the permit-type vocabulary and when the shop requires a permit. Use the site’s actual operating procedures to define the necessary decision and the permitted interval. The software records that authorization; the people responsible for safe work must still assess the physical conditions and instructions applying to the job.

Decide who issues a permit and who handles a delayed start. Establish how the team treats the beginning and end of the validity interval, especially when a job crosses a shift boundary. Include a review of who can approve, who can read and who can correct a permit record. A screen shared for visibility should not become an unintended route to authorization.

Check the handoff on an actual case

Schedule TD-17 for maintenance during an agreed permit interval. Maintenance Manager checks the work-order reference, permit type and issuer before the permit becomes Approved. Technician opens the same work order and verifies that the planned start falls within the approved interval.

Now delay the start until the interval has ended. The start rehearsal should reject reliance on the expired authorization. Maintenance Manager reviews the revised timing and obtains the appropriate permit decision before Technician tries again. Record the outcome of the rehearsal and explain what the Technician should do when a delayed job still appears in the assigned-work list.

Also test a permit attached to a different work order. The presence of an approval elsewhere should not satisfy this job’s safety check. This case helps the team distinguish a valid document from authorization for the exact work it is about to perform.

What your team sees

  • Permit requests — Review permit type, issuer and proposed work interval.
  • Approved permit intervals — Check approved permits against the timing of maintenance.

Follow the work through

Follow work authorization, then start maintenance using the approved scope and interval.

What it keeps track of

Data model
Safety permits
Safety Permits record for Tool & Die Management.
Work orders
Work Orders record for Tool & Die Management.
People
People records for Tool & Die Management.
Assets
Assets record for Tool & Die Management.

Who uses it

Permissions
Maintenance Manager
Coordinates authorization.
Safety Permit Issuer
Handles delegated permit decisions after setup.
Technician
Checks the working interval.
Maintenance Reviewer
Reads the evidence.

Set up Tool & Die Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appTool & Die Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.