All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Tool & Die Management
  2. Features
  3. Tool register
Feature · Tool register

Tool register

Identify each tool, its location and its service state before assigning maintenance or reviewing sharpening evidence.

OverviewWork awaiting authorization
Tool & Die Management · Tool register

Work awaiting authorization

Approval waits for the maintenance manager

New
IdAssetWork typeDescriptionRequested atDue date
AST-2026-0181Trim die, panel line 1PreventiveCutting edge burr found after run27 Nov30 Nov
WO-2026-0524Gauge set, final inspectionCorrectivePunch tip chipped during setup10 Nov15 Nov
SHP-2026-0113Progressive die, bracket line 2InspectionCooling line flow below target26 Nov29 Nov
PERM-2026-0092Forming die, hinge cellPreventiveGuide pins show uneven wear16 Nov25 Nov
LOG-2026-0714Progressive die, bracket line 2CorrectiveForming face needs repolish26 Nov01 Dec
6 of 6 records
AST-2026-0181Work orders · WO-54372
Preventive
AssetTrim die, panel line 1
DescriptionCutting edge burr found after run
Requested at27 Nov
Due date30 Nov
Assigned toDae Park
Example screen with sample data

What you can do

Recognize the tool before authorizing work

A maintenance request needs an identifiable tool. Maintenance Manager records its name, asset tag, serial number and location so Technician can match the record to the item at the bench. Manufacturer and commissioning date give useful background when deciding which maintenance instructions apply. A similar name should prompt a physical check before work begins.

The service state tells the team whether the tool is Active, in Maintenance, out of service or Retired. Record the actual condition when bringing tools into the register. A tool awaiting investigation needs a different operational decision from a tool that has completed maintenance and is ready to return to service.

How the work is organized

  • Identity. Maintenance Manager agrees the naming and tagging convention and checks existing records before adding a tool. Keep the same identity through repeated maintenance and sharpening so later evidence refers to the same physical item.
  • Current condition. The asset’s state guides the maintenance discussion. Starting authorized work sets the eligible asset to Maintenance; completing the close workflow returns it to service after the required completion checks.
  • Linked evidence. Work orders, dated cycle entries, sharpening jobs and service history all point back to the asset. Review them together when an apparently healthy tool has an unresolved sharpening outcome or recent corrective work.

What to agree during setup

Choose a tag that the team can read where tools are stored and used. Agree how to distinguish an assembly from a replaceable item and which physical item each record represents. Decide who corrects a location or serial number when the bench check differs from the register. Keep retired identities available when reviewing older work.

Maintenance Manager should also explain what out of service means locally and who may decide the next maintenance action. Review the relationship between tool condition and the work-order state: an approved request authorizes its scope, while the tool’s own state describes its current service position. Use the maintenance workflow when the work has operational effects.

Check the handoff on an actual case

Take a die tagged TD-17 whose cutting edge needs attention. Maintenance Manager checks the tag and serial number, confirms its location and creates a corrective maintenance request against that asset. Technician compares the assigned request with the item received. If a similar die arrives instead, resolve the identity before entering cycles or removing material.

After sharpening, Maintenance Reviewer examines the outcome against the same asset. Maintenance Manager checks the service entry created at close and the returned asset state. Reopen the tool’s history and verify that the cycle record, sharpening job and completed maintenance remain distinguishable. The rehearsal should make an incorrect asset selection easy to spot before it spreads into later work.

What your team sees

  • Tool register — Find tools by identity, location and current service state.
  • Service due for review — Inspect completed work with a follow-up date requiring attention.

Follow the work through

What it keeps track of

Data model
Assets
Assets record for Tool & Die Management.
Work orders
Work Orders record for Tool & Die Management.
Tool cycles
Tool Cycles record for Tool & Die Management.
Sharpening jobs
Sharpening Jobs record for Tool & Die Management.
Service history
Service History records for Tool & Die Management.

Who uses it

Permissions
Maintenance Manager
Owns tool identity and service decisions.
Technician
Confirms the physical item.
Maintenance Reviewer
Checks related evidence.

Set up Tool & Die Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appTool & Die Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.