All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Warehouse Labor Management
  2. Features
  3. Work evidence
Feature · Work evidence

Work evidence

Record actual hours and source references against work orders.

OverviewRecorded hours
Warehouse Labor Management · Work evidence

Recorded hours

Work evidence

New
ParentLine numberOccurred atActual hoursSource referenceReviewer note
Replace scanner mount in zone C65011 Nov11WO-2026-1402Guard rail installed and photographed
Replace scanner mount in zone C34010 Nov1MAINT-2026-339Dock leveler passed loaded test
Inspect dock leveler at door 673015 Nov3SAFETY-2026-087Scale readings match certified weights
Replace scanner mount in zone C59013 Nov5ASSET-2026-441Conveyor belt tension needs recheck
Replace scanner mount in zone C60015 Nov15SHIFT-2026-1014Work area cleared for operations
6 of 6 records
WO-2026-1402Work evidence · WE-58691
ParentReplace scanner mount in zone C
Line number650
Occurred at11 Nov
Actual hours11
Reviewer noteGuard rail installed and photographed
Example screen with sample data

What you can do

Account for the work done

Work evidence is recorded as lines under a work order. Each line has a number and revision, with room for an evidence type, occurrence time, actual hours, source reference, evidence revision and reviewer note. This makes the labor record more useful than a single completion flag. The owner and manager can compare what was planned with what was actually done while keeping the source of each entry visible.

For a dock reset, the first worker records the preparation time and a second entry records the repair or inspection time. Both lines point to the same parent work order. If a supervisor later corrects an entry, the revision and source reference help the reviewer identify which account they are reading. The team’s operating procedure should say who may make such a correction and how the original evidence is retained.

How the work is organized

  • Parent job. Every evidence line belongs to a work order, so actual hours roll up to the planned task.
  • Source detail. Evidence type, occurrence time and source reference explain where a line came from.
  • Review detail. Revision and reviewer note support a question or correction during acceptance.

What to agree during setup

Agree what counts as actual hours and when a worker records them. A source reference can point to a time clock entry, shift sheet or another source the customer controls. Define a consistent evidence type vocabulary for the local operation and explain whether the occurrence time marks the start, end or recording of the work. The fields should be used consistently across shifts before managers compare totals.

Decide how to handle partial work. A worker may record hours while the work order remains Assigned; the manager later sees those lines in Review. If work spans shifts, keep each entry tied to the same job and use line numbers to tell the sequence. Planned hours remain on the work order and the assignment. Do not overwrite them merely to make an actual-hours comparison appear balanced.

Check the handoff on an actual case

Use a work order planned for four hours. Record two evidence lines, one for three hours and another for two. Warehouse Manager should see five actual hours against the four-hour plan and ask what changed. The worker can attach a source reference or supporting file. The manager records a reviewer note where the entry needs explanation, then checks whether the work itself is ready to accept.

Repeat with an evidence line that has an occurrence time but no actual hours. It may still describe an event, but it should not be counted as labor time. The Operations Analyst should distinguish a missing hour value from zero hours in reporting. Rehearse a corrected line with a changed revision, and verify that the reviewer can identify the current evidence being discussed.

What your team sees

  • Recorded hours — Evidence lines with actual time, source and parent job.
  • Work awaiting review — Jobs whose recorded work needs a manager’s decision.
  • Due work — Jobs nearing their due date that may need an hours check.

Follow the work through

Follow record work and accept work. The data model shows how evidence lines attach to their parent job.

What it keeps track of

Data model
Work evidence
Recorded hours and source evidence produced while executing a work order.
Work orders
Warehouse work planned and executed against an asset under a controlled revision lifecycle.
Record attachments
Supporting documents and evidence files attached to a work order.
Labor assignments
Shift-level labor assignments submitted, reviewed and approved per zone.

Who uses it

Permissions
Warehouse Worker
Records hours and source detail.
Shift Supervisor
Checks the shift account.
Warehouse Manager
Reviews the work before acceptance.
Operations Analyst
Compares planned and actual labor.

Set up Warehouse Labor Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appWarehouse Labor Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.