3D Printing Job Manager connects customer orders to planned work, printer builds, material issues and finishing evidence. A Production Planner records the requested parts and required date, assigns a production resource and asks the release workflow to validate the work order.
approval waits for the production planner
| Id | Product | Order | Planned quantity | Resource | Planned start | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | ABS enclosure lid, vented | Kestrel display housing revision | 570 | UV cure cabinet 2 | 28 Oct | |
| ORD-2026-0187 | Clear resin inspection window | Valecrest drone mount samples | 500 | Media blast booth | 24 Oct | |
| PB-2026-0294 | Clear resin inspection window | Ridgecrest sensor housing run | 60 | Printer Bay B, nylon | 27 Oct | |
| BATCH-2026-0088 | ABS enclosure lid, vented | North Pier fixture spacer order | 460 | Media blast booth | 27 Oct | |
| MI-2026-0143 | TPU vibration foot, 25 mm | Kestrel display housing revision | 60 | Wash station 1 | 03 Nov |
Production Planner approves the customer order after checking its lines and required date under the team's agreed approval policy.
Every feature works on the same records. Pick one to see the screen your team works in.
Agree the printed item, quantity and required date before committing printer time.
Approval waits for the production planner
| Id | Customer | Order date | Required date | Status | |
|---|---|---|---|---|---|
| WO-2026-0412 | Willowfield Controls | 13 Oct | 20 Oct | Draft | |
| ORD-2026-0187 | Willowfield Controls | 13 Oct | 16 Oct | Draft | |
| PB-2026-0294 | Kestrel Product Studio | 22 Oct | 28 Oct | Draft | |
| BATCH-2026-0088 | Valecrest Flight Systems | 15 Oct | 17 Oct | Draft | |
| MI-2026-0143 | Kestrel Product Studio | 16 Oct | 20 Oct | Draft |
Assign production work to an available printer and validate the release request.
Completion waits for the production planner
| Id | Product | Order | Planned quantity | Resource | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Clear resin inspection window | Kestrel display housing revision | 610 | Media blast booth | 29 Oct | |
| ORD-2026-0187 | ABS enclosure lid, vented | Willowfield enclosure pilot | 620 | Printer Bay C, PETG | 30 Oct | |
| PB-2026-0294 | Nylon hinge bracket, 40 mm | Kestrel display housing revision | 120 | UV cure cabinet 2 | 22 Oct | |
| BATCH-2026-0088 | ABS enclosure lid, vented | Eastmere prototype bracket order | 800 | Printer Bay C, PETG | 24 Oct | |
| MI-2026-0143 | ABS enclosure lid, vented | Ridgecrest sensor housing run | 350 | Media blast booth | 17 Oct |
Keep the model file, printer, material and build state together throughout the print run.
Printing waits for the production operator
| Id | Printer | Material | Model file | Layer height MM | Estimated hours | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Printer Bay D, carbon nylon | Aluminum-filled fixture spacer | sensor_housing_rev_c.stl | 50 | 8 | |
| ORD-2026-0187 | Dimensional inspection bench | Clear resin inspection window | hinge_bracket_40mm.step | 290 | 6 | |
| PB-2026-0294 | Printer Bay B, nylon | Nylon hinge bracket, 40 mm | enclosure_lid_vented.stl | 890 | 8 | |
| BATCH-2026-0088 | Printer Bay D, carbon nylon | Nylon hinge bracket, 40 mm | cable_guide_120mm.3mf | 220 | 1 | |
| MI-2026-0143 | UV cure cabinet 2 | Resin display housing, matte white | drone_mount_rev_b.step | 340 | 7 |
Trace material issues to the work order and lot, with a single stock effect for posting or reversal.
Approval waits for the production planner
| Id | Work order | Item | Lot number | Quantity | Issued at | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Cable guide replenishment, 150 pieces | TPU vibration foot, 25 mm | L26-2730 | 580 | 10 Oct | |
| ORD-2026-0187 | Fixture spacer run, 36 pieces | Resin display housing, matte white | L26-9634 | 630 | 19 Oct | |
| PB-2026-0294 | Sensor housing pilot, 24 pieces | Nylon hinge bracket, 40 mm | L26-9309 | 740 | 11 Oct | |
| BATCH-2026-0088 | Sensor housing pilot, 24 pieces | Resin display housing, matte white | L26-0992 | 700 | 16 Oct | |
| MI-2026-0143 | Fixture spacer run, 36 pieces | Nylon hinge bracket, 40 mm | L26-5299 | 200 | 19 Oct |
Record operator intervals, good units and scrap before work enters quality review.
Production logs
| Id | Work order | Operator | Started at | Ended at | Good units | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Cable guide replenishment, 150 pieces | Hassan Farouk | 03 Nov | 12 Nov | 120 | |
| ORD-2026-0187 | Bracket prototype, revision C | Hassan Farouk | 13 Oct | 18 Oct | 230 | |
| PB-2026-0294 | Bracket prototype, revision C | Hassan Farouk | 11 Oct | 18 Oct | 130 | |
| BATCH-2026-0088 | Cable guide replenishment, 150 pieces | Lina Park | 23 Oct | 27 Oct | 240 | |
| MI-2026-0143 | Inspection window trial, 20 pieces | Theo Bennett | 20 Oct | 27 Oct | 220 |
Assign finishing steps to people and retain the lot decision beside the production evidence.
Post process steps
| Id | Build | Step type | Assigned to | Completed at | Result | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Fixture spacers build, bay B | Support removal | Lina Park | 20 Oct | Supports removed; surface clean | |
| ORD-2026-0187 | Sensor housing build, bay A | Washing | Hassan Farouk | 17 Oct | Thread inserts seated flush | |
| PB-2026-0294 | Bracket prototype build, bay D | Curing | Hassan Farouk | 15 Oct | Cure complete; no tackiness | |
| BATCH-2026-0088 | Sensor housing build, bay A | Sanding | Aisha Rahman | 14 Oct | Edges deburred and inspected | |
| MI-2026-0143 | Fixture spacers build, bay B | Support removal | Hassan Farouk | 10 Oct | Dimensions within 0.2 mm |
Keep supplier commitments and received quantities visible before the next print run needs material.
Purchase orders
| Id | Supplier | Order date | Due date | Status | |
|---|---|---|---|---|---|
| WO-2026-0412 | Valecrest Flight Systems | 22 Oct | 23 Oct | Draft | |
| ORD-2026-0187 | Willowfield Controls | 21 Oct | 23 Oct | Approved | |
| PB-2026-0294 | Valecrest Flight Systems | 10 Oct | 15 Oct | Sent | |
| BATCH-2026-0088 | Eastmere Robotics | 17 Oct | 20 Oct | Received | |
| MI-2026-0143 | Kestrel Product Studio | 11 Oct | 20 Oct | Draft |
Customer order to reviewed print lot ships ready to use. One step needs a named approval before the work moves on: Approve order (Production Planner).
Production Planner checks the requested parts, quantities and required date before approving the customer order.
Assign the product, printer and planned work window to the customer job.
Request validation of the linked order, quantity, printer availability and schedule before releasing work.
Keep the model, material and layer settings with the build as printing and cooling progress.
Assign finishing work and record the completion and result against the build.
Quality Reviewer examines production and finishing evidence; Production Planner records the resulting lot disposition.
Open any work order to see its batches, the roles that work on it, its process stages and its approvals on one page.
Product, Order, Planned quantity and Resource.
Each line is linked to this work order.
Production Operator, Production Planner and Quality Reviewer, each with their own permissions.
Plan production and Release work, with the role that acts.
Approve order, with who decides.
ABS enclosure lid, vented · Draft
| Id | Lot number | Work order |
|---|---|---|
| WO-2026-0412 | L26-5629 | Display housing finish run |
| ORD-2026-0187 | L26-3538 | Display housing finish run |
| PB-2026-0294 | L26-0952 | Fixture spacer run, 36 pieces |
Quality Reviewer reads the production and finishing evidence. Production Planner records the resulting lot disposition and work-order outcome.
Signed in as Production Planner
| Decision | Approver | |
|---|---|---|
| Approve orderProduction Planner checks the requested parts, quantities and required date before approving the customer order. | Production Planner | |
| Approve purchase orders | Manager |
Everyone opens 3D Printing Job Manager to the work that is theirs. Pick a role to see what it starts with.
Captures assigned production work and evidence.
This is the first screen this role sees.
Work orders · Production Operator
| Id | Product | Resource | Planned quantity | Planned start | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | ABS enclosure lid, vented | Printer Bay B, nylon | 350 | 01 Nov | 06 Nov | |
| ORD-2026-0187 | Aluminum-filled fixture spacer | Dimensional inspection bench | 150 | 17 Oct | 20 Oct | |
| PB-2026-0294 | Resin display housing, matte white | Printer Bay B, nylon | 330 | 29 Oct | 03 Nov | |
| BATCH-2026-0088 | Clear resin inspection window | Printer Bay A, resin | 400 | 26 Oct | 29 Oct | |
| MI-2026-0143 | ABS enclosure lid, vented | UV cure cabinet 2 | 190 | 20 Oct | 22 Oct |
Owns production setup, planning and assigned operational work.
This is the first screen this role sees.
Work orders · Production Planner
| Id | Product | Resource | Planned quantity | Planned start | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | ABS enclosure lid, vented | Printer Bay B, nylon | 350 | 01 Nov | 06 Nov | |
| ORD-2026-0187 | Aluminum-filled fixture spacer | Dimensional inspection bench | 150 | 17 Oct | 20 Oct | |
| PB-2026-0294 | Resin display housing, matte white | Printer Bay B, nylon | 330 | 29 Oct | 03 Nov | |
| BATCH-2026-0088 | Clear resin inspection window | Printer Bay A, resin | 400 | 26 Oct | 29 Oct | |
| MI-2026-0143 | ABS enclosure lid, vented | UV cure cabinet 2 | 190 | 20 Oct | 22 Oct |
Reviews evidence and authorizes eligible domain outcomes.
This is the first screen this role sees.
Work orders · Quality Reviewer
| Id | Product | Resource | Planned quantity | Planned start | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | ABS enclosure lid, vented | Printer Bay B, nylon | 350 | 01 Nov | 06 Nov | |
| ORD-2026-0187 | Aluminum-filled fixture spacer | Dimensional inspection bench | 150 | 17 Oct | 20 Oct | |
| PB-2026-0294 | Resin display housing, matte white | Printer Bay B, nylon | 330 | 29 Oct | 03 Nov | |
| BATCH-2026-0088 | Clear resin inspection window | Printer Bay A, resin | 400 | 26 Oct | 29 Oct | |
| MI-2026-0143 | ABS enclosure lid, vented | UV cure cabinet 2 | 190 | 20 Oct | 22 Oct |
Maintains access and the personnel links needed to attribute production work.
Approves supplier commitments and reviews customer-order exceptions under the policy agreed during setup.
This is the first screen this role sees.
Orders · Manager
| Id | Customer | Order date | Required date | Status | |
|---|---|---|---|---|---|
| WO-2026-0412 | Willowfield Controls | 13 Oct | 20 Oct | Draft | |
| ORD-2026-0187 | Willowfield Controls | 13 Oct | 16 Oct | Draft | |
| PB-2026-0294 | Kestrel Product Studio | 22 Oct | 28 Oct | Draft | |
| BATCH-2026-0088 | Valecrest Flight Systems | 15 Oct | 17 Oct | Draft | |
| MI-2026-0143 | Kestrel Product Studio | 16 Oct | 20 Oct | Draft |
Use order, build, material and output evidence to explain what the shop must do next.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 44 | ||
| Released | 11 | 25% | |
| In progress | 2 | 18% | |
| Quality review | 1 | 50% |
Sample totals per stage
Group Approved and Released customer orders by required date and customer, then show each line's item and quantity.
Compare planned start and end dates by assigned resource, with each work order's planned quantity and state.
Group builds by printer and state, showing estimated hours, material and layer height for planning.
Group material issues by item and lot, separating Draft, Posted and Reversed quantities and showing whether stock was applied.
Show on-hand and reserved quantities by item, location and lot in the item's unit.
Group production intervals by work order and operator, comparing start and end with good and scrap quantities.
Show each build's finishing steps with their assigned person, completion time and recorded result.
Group produced lots by work order and disposition, retaining each lot number, production date and expiry date.
Group purchase lines by supplier order and item, comparing ordered and received quantities with the order's due date and state.
See how 3D Printing Job Manager fits your kind of team.
Keep customer parts, printer commitments and finishing work connected across a busy print shop.
Keep model attachments and physical build evidence recognizable as prototype work changes hands.
Coordinate repeat part orders with material lots, operator output and a clear lot disposition.
Each stage of customer order to reviewed print lot names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to configure the print-shop process and help the team examine its production records.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 17 tablesStart with one team and one process, then add the rest once the basics are running.
Choose a customer order with a clear part, material and printer. Assign responsibility for order approval, release requests, finishing and lot disposition.
Load customers, suppliers, items and printers. Link shop people to platform users and reconcile material balances by item, lot and location.
Set up the planner’s release inbox and schedule, operator assignment screens and reviewer queues. Check personal filters with the actual people who will use them.
Try a rejected release, a corrected release and a replay. Post and reverse a measured material quantity, then end a valid production interval and inspect the resulting review state.
Record a finishing result that keeps a lot Held. Rehearse a partial supplier receipt and agree the incoming-stock handoff before operators issue that material.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure 3D Printing Job Manager for your business. Begin with a customer order, a familiar printer and material lot, then rehearse release, material posting, output recording and finishing review.
Keep the model attachment, printer, material, layer height and estimated hours with the build. Link the work order for customer production so finishing staff can follow the same run.
The Production Planner prepares the work order and requests release. The release action checks the linked order, quantity, resource availability and schedule before eligible work becomes Released.
Keep its resource state current as Maintenance or Unavailable. The planner reviews a rejected release, corrects the assignment or schedule and requests release again through the agreed process.
Post a material issue against its item and lot. Reversing that posted issue restores its stock effect once. Rehearse posting and reversal retries with a known balance before live use.
Ending a valid production interval routes an eligible released or in-progress work order into quality review. The reviewer still checks the finishing evidence and remaining work before the planner records the lot and job outcome.
Yes. Assign support removal, washing, curing or sanding to a shop person against the build. The operator records completion and a result that the next person can understand.
Purchase lines retain ordered and received quantities. The planner follows the outstanding amount and checks the agreed receipt conditions before marking the supplier order Received. Set up the incoming-stock handoff separately.
The Quality Reviewer examines production and finishing evidence. The Production Planner records the lot as Pending, Released, Held or Rejected under the team's review procedure and maintains the work-order outcome.
Agree connections or operating procedures with the systems that own model preparation, slicing and dispatch. Use the connections page to define the records and responsibilities for the pilot.
Start free, then use Proto to change fields, steps and approvals before your team goes live.