Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Tool & Die Management
- Production planning
- Machine counters
- Purchasing
- Tooling instructions
Tool & Die Management runs the maintenance lifecycle of tooling already in use. Assets identifies the tool, its location and service state.
Assets in one list
Maintenance Manager decides work authorization; Safety Permit Issuer handles delegated permit approval after setup.
Every feature works on the same records. Pick one to see the screen your team works in.
Identify each tool, its location and its service state before assigning maintenance or reviewing sharpening evidence.
Approval waits for the maintenance manager
| Id | Asset | Work type | Description | Requested at | Due date | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | Trim die, panel line 1 | Preventive | Cutting edge burr found after run | 02 Nov | 05 Nov | |
| WO-2026-0524 | Gauge set, final inspection | Corrective | Punch tip chipped during setup | 16 Oct | 21 Oct | |
| SHP-2026-0113 | Progressive die, bracket line 2 | Inspection | Cooling line flow below target | 01 Nov | 04 Nov | |
| PERM-2026-0092 | Forming die, hinge cell | Preventive | Guide pins show uneven wear | 22 Oct | 31 Oct | |
| LOG-2026-0714 | Progressive die, bracket line 2 | Corrective | Forming face needs repolish | 01 Nov | 06 Nov |
Give maintenance a defined scope, assigned technician and due date, then carry the work through authorization and completion.
Work orders
| Id | Asset | Assigned to | Due date | Completed at | Description | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | Gauge set, final inspection | Dae Park | 12 Oct | Cutting edge burr found after run | ||
| WO-2026-0524 | CNC fixture, shaft station | Inez Patel | 24 Oct | Punch tip chipped during setup | ||
| SHP-2026-0113 | Gauge set, final inspection | Dae Park | 31 Oct | Cooling line flow below target | ||
| PERM-2026-0092 | Progressive die, bracket line 2 | Greta Bauer | 23 Oct | Guide pins show uneven wear | ||
| LOG-2026-0714 | Stamping punch set, press 4 | Elif Kaya | 04 Nov | Forming face needs repolish |
Connect permit approval and its validity interval to the work order before maintenance starts.
Approval conditions
| Id | Work order | Permit type | Valid from | Valid to | Issued by | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | Polish hinge forming surface | Press lockout | 14 Oct | 16 Oct | Greta Bauer | |
| WO-2026-0524 | Inspect valve mold cooling channels | Hot work | 04 Nov | 11 Nov | Boris Novak | |
| SHP-2026-0113 | Calibrate final inspection gauges | Confined machine access | 24 Oct | 30 Oct | Greta Bauer | |
| PERM-2026-0092 | Repair shaft fixture clamp | Electrical isolation | 31 Oct | 07 Nov | Jamal Wright | |
| LOG-2026-0714 | Replace worn punch inserts | Lifting operation | 26 Oct | 31 Oct | Boris Novak |
Capture dated tool usage against the correct asset and work-order reference for maintenance review.
Tool cycles
| Id | Asset | Work order reference | Cycle count | Recorded at | |
|---|---|---|---|---|---|
| AST-2026-0181 | Forming die, hinge cell | WO-2026-0524 | 38 | 15 Oct | |
| WO-2026-0524 | Injection mold, valve housing | WO-2026-0525 | 11 | 21 Oct | |
| SHP-2026-0113 | Stamping punch set, press 4 | WO-2026-0526 | 12 | 22 Oct | |
| PERM-2026-0092 | CNC fixture, shaft station | WO-2026-0527 | 20 | 16 Oct | |
| LOG-2026-0714 | Forming die, hinge cell | WO-2026-0528 | 11 | 15 Oct |
Record material removal and remaining allowance, then review the sharpening result before release.
Release waits for the maintenance reviewer
| Id | Asset | Requested at | Completed at | Material removed | Remaining allowance | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | Injection mold, valve housing | 02 Nov | 280 | 900 | ||
| WO-2026-0524 | CNC fixture, shaft station | 28 Oct | 20 | 250 | ||
| SHP-2026-0113 | Trim die, panel line 1 | 03 Nov | 500 | 410 | ||
| PERM-2026-0092 | Cutting die, gasket cell | 17 Oct | 330 | 560 | ||
| LOG-2026-0714 | Injection mold, valve housing | 03 Nov | 100 | 910 |
Review spare-part quantities and connect recorded consumption to the maintenance work that used them.
Spare parts
| Id | Part number | Name | Unit | Quantity on hand | Reorder point | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | SP-88514 | Punch insert, 12 mm carbide | Each | 20 | 260 | |
| WO-2026-0524 | SP-63052 | Die spring, heavy load 45 mm | Pair | 60 | 660 | |
| SHP-2026-0113 | SP-92214 | Guide pin, 20 mm hardened | Set | 740 | 110 | |
| PERM-2026-0092 | SP-21154 | Ejector pin, 6 mm stainless | Pack | 120 | 310 | |
| LOG-2026-0714 | SP-30615 | Shim pack, 0.1 to 1 mm | Meter | 910 | 660 |
Retain the completed maintenance outcome and next due date against the tool and its work order.
Service history
| Id | Asset | Work order | Completed at | Outcome | Next due date | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | Trim die, panel line 1 | Repair shaft fixture clamp | 12 Oct | Returned to production | 21 Oct | |
| WO-2026-0524 | Trim die, panel line 1 | Polish hinge forming surface | 15 Oct | Test stroke passed | 20 Oct | |
| SHP-2026-0113 | CNC fixture, shaft station | Replace gasket die ejector pins | 16 Oct | Cooling flow restored | 20 Oct | |
| PERM-2026-0092 | Cutting die, gasket cell | Inspect valve mold cooling channels | 21 Oct | Alignment within tolerance | 23 Oct | |
| LOG-2026-0714 | Cutting die, gasket cell | Replace gasket die ejector pins | 22 Oct | Hold for further inspection | 23 Oct |
Tool maintenance and return to service ships ready to use. 2 steps need a named approval before the work moves on: Authorize work (Safety Permit Issuer) and Release sharpening (Maintenance Reviewer).
Identify the tool, its location and current service state before assigning work.
Maintenance Manager approves the maintenance scope and coordinates the required permit decision.
Technician starts authorized work, with safety checks, work logging and planned part usage.
Record the dated cycle reading against the tool and agreed work-order reference.
Maintenance Reviewer examines the inspected result and decides whether it qualifies for release.
Validate completed work, retain the service outcome and confirm the tool's return to service.
Open any asset to see its service history, the roles that work on it, its process stages and its approvals on one page.
Asset tag, Name, Location and Manufacturer.
Each line is linked to this asset.
Maintenance Manager, Technician and Maintenance Reviewer, each with their own permissions.
Register tool and Request maintenance, with the role that acts.
Authorize work and Release sharpening, with who decides.
DIE-BRKT-02 · Active
| Id | Asset | Work order |
|---|---|---|
| AST-2026-0181 | Trim die, panel line 1 | Repair shaft fixture clamp |
| WO-2026-0524 | Trim die, panel line 1 | Polish hinge forming surface |
| SHP-2026-0113 | CNC fixture, shaft station | Replace gasket die ejector pins |
Maintenance Reviewer reads evidence and authorizes eligible domain outcomes through the appropriate review action. Access to a record and authority to decide its outcome serve different purposes.
Signed in as Safety Permit Issuer
| Decision | Approver | |
|---|---|---|
| Authorize workMaintenance Manager approves the maintenance scope and coordinates the required permit decision. | Safety Permit Issuer | |
| Release sharpeningMaintenance Reviewer examines the inspected result and decides whether it qualifies for release. | Maintenance Reviewer | |
| Approve safety permits | Safety Permit Issuer |
Everyone opens Tool & Die Management to the work that is theirs. Pick a role to see what it starts with.
Owns maintenance setup, planning and assigned operational work.
This is the first screen this role sees.
Assets · Maintenance Manager
Captures assigned maintenance work and evidence.
This is the first screen this role sees.
Assets · Technician
Reviews evidence and authorizes eligible domain outcomes.
This is the first screen this role sees.
Assets · Maintenance Reviewer
Proposed setup role for maintaining user mappings and administering the agreed configuration without substituting for operational approval.
Proposed delegated role for the permit-approval responsibility in work authorization, subject to explicit configuration and eligible workflow access.
This is the first screen this role sees.
Safety permits · Safety Permit Issuer
| Id | Work order | Permit type | Valid from | Valid to | Issued by | |
|---|---|---|---|---|---|---|
| AST-2026-0181 | Polish hinge forming surface | Press lockout | 14 Oct | 16 Oct | Greta Bauer | |
| WO-2026-0524 | Inspect valve mold cooling channels | Hot work | 04 Nov | 11 Nov | Boris Novak | |
| SHP-2026-0113 | Calibrate final inspection gauges | Confined machine access | 24 Oct | 30 Oct | Greta Bauer | |
| PERM-2026-0092 | Repair shaft fixture clamp | Electrical isolation | 31 Oct | 07 Nov | Jamal Wright | |
| LOG-2026-0714 | Replace worn punch inserts | Lifting operation | 26 Oct | 31 Oct | Boris Novak |
Review overdue work, cycle evidence, sharpening allowance and service follow-up using the recorded maintenance facts.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Active | 28 | ||
| Maintenance | 10 | 36% | |
| Out of service | 2 | 20% | |
| Retired | 1 | 50% |
Sample counts per stage
Group work orders by Asset and Status, retaining work type and due date so requested work and work under inspection remain distinct.
Compare due date with the reporting date for work orders in Requested, Approved, Scheduled, in progress or Inspection.
Review safety permits by work order, Status, valid from and valid to without treating an Approved permit outside its interval as valid.
Show tool cycles by Asset and recorded at with cycle count and work order reference, using the agreed incremental or cumulative interpretation before calculating totals.
Compare material removed and remaining allowance across sharpening jobs by Asset, completed at and Status, without deriving an unrecorded tool limit.
Group part usage quantity by work order and Part with used at, keeping quantities in each linked spare part unit.
Compare spare part quantity on hand with reorder point using part number and Unit, with missing thresholds shown as unresolved.
Review service history outcome and next due date alongside Asset, work order and completed at to identify maintenance requiring follow-up.
See how Tool & Die Management fits your kind of team.
Keep die identity, cycle readings and sharpening decisions connected to maintenance in a stamping toolroom.
Track reusable cutting tools, maintenance work and sharpening allowance through a clear bench review.
Coordinate assigned tool maintenance, permits and evidence across a shared maintenance team.
Each stage of tool maintenance and return to service names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to configure the operating scope and help the team review maintenance records and evidence.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Maintenance Manager selects the tools and maintenance activities for the first cycle. Identify the person deciding work authorization, permit approval and sharpening release. Use a real maintenance case the team can recognize.
Reconcile tool tags, spare-part numbers and user mappings. Configure the operating access with the responsible people and test that Technician reaches the correct assigned work.
Agree cycle-count meaning, measurement units and sharpening release criteria. Define what a useful work description contains and who supplies service follow-up dates.
Follow the reference order in the data model. Check a tool’s work, permit, usage and service history together before relying on imported records for a decision.
Run a request through authorization, work start, relevant specialty capture and completion. Repeat with an expired permit, a repeated start and a sharpening result that must be rejected.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Tool & Die Management for your business. Begin with an identifiable tool, a maintenance request and the people responsible for authorization, execution and sharpening review. Rehearse the successful case and an expired-permit case before expanding the scope.
It records the tool's name, asset tag, location, manufacturer, serial number, commissioning date and service state. Work orders and specialty evidence refer back to that asset so the team can follow the same physical item through maintenance.
Map each Technician's user account to the correct person record during setup. Assigned maintenance then identifies the tool, work description and due date for that person. Rehearse the mapping with the signed-in Technician before the first operating cycle.
The work-start action validates safety and authorization, posts planned part usage exactly once, logs work start and sets the eligible asset to Maintenance. Technician should use that action after checking the actual tool and applicable permit interval.
Record the asset, work-order reference, cycle count and event date. Agree whether readings are cumulative or incremental before reviewing history. The cycle-capture workflow validates the submission and sends attributed evidence to the responsible reviewer.
Maintenance Reviewer decides an eligible inspected outcome using the submitted evidence and agreed release criteria. Technician records the work, material removed and remaining allowance. Rejected outcomes stay visible for Maintenance Manager to resolve.
A permit connects its type, issuer and validity interval to a work order. Maintenance Manager coordinates approval, with delegated issuing responsibility configured where needed. Technician must consider the interval as well as the Approved status when starting work.
Part usage records the spare, quantity, use date and related work order. Maintenance Manager can compare recorded consumption with the job and review stock against reorder points. Set up a purchasing connection when the replenishment decision needs to enter the buying system.
The close workflow validates completion, records service history against the asset and work order and returns the eligible tool to service. Maintenance Manager reviews the outcome and next due date to decide the next maintenance action.
Treat those connections as setup choices. Agree the asset identity, work reference and event interpretation with the system owner, then rehearse wrong mappings and repeated submissions before routine use. See connections for the boundaries to settle.