Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Assembly Line Tracking
- Customer order intake
- Barcode capture
- Purchasing and stock
- Test results
- Financial accounting
Assembly Line Tracking connects customer demand to dated production work, product station routes and serial-level station passes. Production Planner prepares the product sequence and target takt, selects an available station and releases eligible work.
Approval conditions
| Id | Product | Order | Resource | Planned quantity | Planned start | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Conveyor roller, 300 mm | Seal kits for Willow Supply | Valve assembly cell | 330 | 03 Nov | |
| ORD-2026-0821 | Pressure gauge, 0 to 10 bar | Valve sets for North Quay | Valve assembly cell | 960 | 04 Nov | |
| PO-2026-0188 | Compact pump housing, cast aluminum | Pump housings for Ridgewater | Pump final assembly | 910 | 28 Oct | |
| PASS-2026-1104 | Stainless valve body, 20 mm | Control panels for Harbor Works | Bracket coating booth | 800 | 24 Oct | |
| ISSUE-2026-0772 | Motor bracket, powder coated | Irrigation pumps for Cedar Valley | Panel wiring bench | 730 | 30 Oct |
Quality Reviewer accepts eligible Pending output before batch release, finished stock posting and work-order completion.
Every feature works on the same records. Pick one to see the screen your team works in.
Release dated assembly work against approved demand and an available station.
Approval conditions
| Id | Customer | Order date | Required date | Status | |
|---|---|---|---|---|---|
| WO-2026-0412 | Stonebridge Systems | 11 Oct | 14 Oct | Draft | |
| ORD-2026-0821 | Willow Components Co. | 11 Oct | 13 Oct | Draft | |
| PO-2026-0188 | Eastbank Machinery | 22 Oct | 31 Oct | Draft | |
| PASS-2026-1104 | Eastbank Machinery | 09 Oct | 18 Oct | Draft | |
| ISSUE-2026-0772 | Pinecrest Plant Supply | 19 Oct | 22 Oct | Draft |
Give each product an ordered station sequence and a clear target takt.
Station routes
| Id | Product | Station | Sequence | Target takt seconds | |
|---|---|---|---|---|---|
| WO-2026-0412 | Finished irrigation pump, 2 hp | Roller packing line | 10 | 200 | |
| ORD-2026-0821 | Conveyor roller, 300 mm | Panel wiring bench | 90 | 120 | |
| PO-2026-0188 | Pressure gauge, 0 to 10 bar | Seal inspection bench | 40 | 110 | |
| PASS-2026-1104 | Pressure gauge, 0 to 10 bar | Housing machining station | 10 | 350 | |
| ISSUE-2026-0772 | Control panel, 24 V | Pump final assembly | 80 | 400 |
Record a unit's station interval and distinguish pass, rework and reject outcomes.
Station passes
| Id | Unit serial | Station | Entered at | Exited at | Disposition | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | PUMP-26-00412 | Housing machining station | 14 Oct | 22 Oct | Rework | |
| ORD-2026-0821 | PANEL-26-00317 | Bracket coating booth | 16 Oct | 21 Oct | Rework | |
| PO-2026-0188 | VALVE-26-00809 | Bracket coating booth | 29 Oct | 03 Nov | Rework | |
| PASS-2026-1104 | GAUGE-26-00144 | Bracket coating booth | 11 Oct | 15 Oct | Rework | |
| ISSUE-2026-0772 | ROLLER-26-00561 | Bracket coating booth | 31 Oct | 03 Nov | Rework |
Follow material supply and post or reverse issues against the matching inventory balance.
Approval conditions
| Id | Work order | Item | Lot number | Quantity | Issued at | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Assemble 120 irrigation pumps | Control panel, 24 V | L26-8763 | 530 | 14 Oct | |
| ORD-2026-0821 | Calibrate 90 pressure gauges | Pressure gauge, 0 to 10 bar | L26-6866 | 950 | 10 Oct | |
| PO-2026-0188 | Pack 300 seal kits | Compact pump housing, cast aluminum | L26-1897 | 510 | 09 Oct | |
| PASS-2026-1104 | Assemble 200 conveyor rollers | Control panel, 24 V | L26-2767 | 570 | 10 Oct | |
| ISSUE-2026-0772 | Assemble 200 conveyor rollers | Hydraulic seal kit, small | L26-9957 | 920 | 16 Oct |
Capture operator intervals and good and scrap quantities before output enters quality review.
Production logs
| Id | Work order | Operator | Started at | Ended at | Good units | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Pack 300 seal kits | Iris Novak | 22 Oct | 25 Oct | 150 | |
| ORD-2026-0821 | Calibrate 90 pressure gauges | Sana Malik | 04 Nov | 11 Nov | 70 | |
| PO-2026-0188 | Calibrate 90 pressure gauges | Tariq Hassan | 17 Oct | 22 Oct | 30 | |
| PASS-2026-1104 | Assemble 120 irrigation pumps | Arjun Singh | 03 Nov | 06 Nov | 210 | |
| ISSUE-2026-0772 | Wire 80 control panels | Elena Costa | 26 Oct | 04 Nov | 120 |
Release accepted pending output into finished inventory and complete its production work.
Approval conditions
| Id | Work order | Lot number | Produced at | Expiry date | Disposition | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Assemble 200 conveyor rollers | L26-9651 | 30 Oct | 04 Nov | Pending | |
| ORD-2026-0821 | Pack 300 seal kits | L26-5373 | 25 Oct | 29 Oct | Pending | |
| PO-2026-0188 | Calibrate 90 pressure gauges | L26-8793 | 12 Oct | 21 Oct | Pending | |
| PASS-2026-1104 | Calibrate 90 pressure gauges | L26-6552 | 16 Oct | 24 Oct | Pending | |
| ISSUE-2026-0772 | Build 240 valve assemblies | L26-3748 | 27 Oct | 04 Nov | Pending |
From station plan to accepted output ships ready to use. One step needs a named approval before the work moves on: Review accepted output (Quality Reviewer).
Set the product's station sequence and target takt, then resolve conflicts before saving.
Check customer demand, positive quantity, resource availability and planned dates before work reaches the floor.
Post consumption against the matching stock balance and reverse a posted issue when a correction is needed.
Capture the unit serial, station interval and pass, rework or reject outcome.
End the operator interval with good and scrap quantities and hand pending output to quality review.
Release eligible accepted output into finished inventory and complete its work order.
Open any work order to see its batches, the roles that work on it, its process stages and its approvals on one page.
Product, Order, Resource and Planned quantity.
Each line is linked to this work order.
Production Planner, Production Operator and Quality Reviewer, each with their own permissions.
Prepare production and Release production, with the role that acts.
Review accepted output, with who decides.
Conveyor roller, 300 mm · Draft
| Id | Work order | Lot number |
|---|---|---|
| WO-2026-0412 | Assemble 200 conveyor rollers | L26-9651 |
| ORD-2026-0821 | Pack 300 seal kits | L26-5373 |
| PO-2026-0188 | Calibrate 90 pressure gauges | L26-8793 |
Signed in as Quality Reviewer
| Decision | Approver | |
|---|---|---|
| Review accepted outputRelease eligible accepted output into finished inventory and complete its work order. | Quality Reviewer | |
| Approve Orders, purchase orders | Manager |
Everyone opens Assembly Line Tracking to the work that is theirs. Pick a role to see what it starts with.
Owns production setup, planning and assigned operational work. Record entry on production, purchasing and specialty tables; read-only on People and Inventory Balances; can open all app pages.
This is the first screen this role sees.
Work orders · Production Planner
| Id | Product | Resource | Planned quantity | Planned start | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Conveyor roller, 300 mm | Panel wiring bench | 470 | 28 Oct | 03 Nov | |
| ORD-2026-0821 | Stainless valve body, 20 mm | Housing machining station | 160 | 21 Oct | 24 Oct | |
| PO-2026-0188 | Compact pump housing, cast aluminum | Housing machining station | 120 | 13 Oct | 22 Oct | |
| PASS-2026-1104 | Finished irrigation pump, 2 hp | Pressure test station | 670 | 01 Nov | 06 Nov | |
| ISSUE-2026-0772 | Control panel, 24 V | Panel wiring bench | 330 | 18 Oct | 23 Oct |
Captures assigned production work and evidence. Record entry on production logs, material issues and specialty capture tables; read-only on setup and master records; can open all app pages.
This is the first screen this role sees.
Work orders · Production Operator
| Id | Product | Resource | Planned quantity | Planned start | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Conveyor roller, 300 mm | Panel wiring bench | 470 | 28 Oct | 03 Nov | |
| ORD-2026-0821 | Stainless valve body, 20 mm | Housing machining station | 160 | 21 Oct | 24 Oct | |
| PO-2026-0188 | Compact pump housing, cast aluminum | Housing machining station | 120 | 13 Oct | 22 Oct | |
| PASS-2026-1104 | Finished irrigation pump, 2 hp | Pressure test station | 670 | 01 Nov | 06 Nov | |
| ISSUE-2026-0772 | Control panel, 24 V | Panel wiring bench | 330 | 18 Oct | 23 Oct |
Reviews evidence and authorizes eligible domain outcomes. No record entry; read-only across every operational table; can open all app pages.
This is the first screen this role sees.
Work orders · Quality Reviewer
| Id | Product | Resource | Planned quantity | Planned start | Planned end | |
|---|---|---|---|---|---|---|
| WO-2026-0412 | Conveyor roller, 300 mm | Panel wiring bench | 470 | 28 Oct | 03 Nov | |
| ORD-2026-0821 | Stainless valve body, 20 mm | Housing machining station | 160 | 21 Oct | 24 Oct | |
| PO-2026-0188 | Compact pump housing, cast aluminum | Housing machining station | 120 | 13 Oct | 22 Oct | |
| PASS-2026-1104 | Finished irrigation pump, 2 hp | Pressure test station | 670 | 01 Nov | 06 Nov | |
| ISSUE-2026-0772 | Control panel, 24 V | Panel wiring bench | 330 | 18 Oct | 23 Oct |
Maintains user access, people-to-user mapping and controlled master-data maintenance.
Approves the customer orders needed for production release and reviews purchasing commitments.
This is the first screen this role sees.
Orders · Manager
| Id | Customer | Order date | Required date | Status | |
|---|---|---|---|---|---|
| WO-2026-0412 | Stonebridge Systems | 11 Oct | 14 Oct | Draft | |
| ORD-2026-0821 | Willow Components Co. | 11 Oct | 13 Oct | Draft | |
| PO-2026-0188 | Eastbank Machinery | 22 Oct | 31 Oct | Draft | |
| PASS-2026-1104 | Eastbank Machinery | 09 Oct | 18 Oct | Draft | |
| ISSUE-2026-0772 | Pinecrest Plant Supply | 19 Oct | 22 Oct | Draft |
Read station activity, production output and stock movements at their recorded level of detail.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 34 | ||
| Released | 23 | 68% | |
| In progress | 13 | 57% | |
| Quality review | 7 | 54% |
Sample totals per stage
Which production work is still Draft, already Released or waiting for the quality decision?
List work orders under Resource with planned start, planned end and planned quantity beside the resource's declared capacity minutes per day.
What station order and target pace has the planner set for the product?
How long did the recorded serial remain at a station between entry and exit?
Where are Pass, Rework and Reject outcomes appearing in station capture?
What output did each operator report against the work order?
Which issues consumed stock and which were reversed?
List Batches by work order with lot number, produced at and Disposition for the quality review discussion.
How do received item quantities compare with the supplier quantities ordered?
See how Assembly Line Tracking fits your kind of team.
Follow serialized assemblies through benches, capture rework and review finished output.
Coordinate work-center availability, component issues and accepted output for repeat assemblies.
Connect customer orders to assembly work and keep production and acceptance responsibilities clear.
Each stage, from station plan to accepted output, names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask for planning and production evidence while keeping operating decisions with the responsible people.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 16 tablesStart with one team and one process, then add the rest once the basics are running.
Choose a familiar assembly product and the customer order it will serve. Name the planner, operator and quality reviewer who will follow it through to finished stock.
Admin checks user access and people links. Production Planner prepares items, customer and supplier records, and stations with meaningful availability and capacity.
Set the product sequence and target takt. Reconcile the component lot balances and agree how the material action selects stock when a lot spans locations.
Prepare Draft work with the intended product, order, resource and dates. Rehearse refused release conditions, then release the corrected work and confirm the operator can find it.
Process serial station passes, post and reverse a material issue, and end a production interval. Quality Reviewer releases accepted Pending output. Production Planner checks finished inventory and completed work.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Assembly Line Tracking for your business. Begin with a familiar product route, an eligible customer order and a dated work order. Rehearse material posting, a serial station pass and a reviewed batch release before expanding the pilot.
A route links a product to a station with its sequence and target takt in seconds. Production Planner uses Submit Station Route to validate the entry and reject sequence conflicts before saving.
Production Operator records the unit serial, station, entry and exit times and a disposition of Pass, Rework or Reject. Process Station Pass checks the entry and refuses invalid or duplicate identities.
Release to Production requires Draft work, an Approved or Released customer order, a positive planned quantity, an Available resource and ordered planned dates. A failed check writes nothing, allowing Production Planner to correct the input before trying again.
Yes. Post / Reverse Material Issue routes a Draft issue to posting and a Posted issue to reversal. Reversal restores the corresponding inventory balance. After an uncertain response, check the issue and stock before pressing the action again; a Posted issue selects reversal. Rehearse the full posting and correction cycle with a known component lot during setup.
Production Operator records good and scrap quantities on the production interval with the work order, operator and start and end times. Ending a valid interval creates or updates Pending output and moves the work into quality review.
Quality Reviewer uses Release Accepted Batch after reviewing the pending lot and production evidence. Eligible accepted output becomes Released, posts to finished inventory and completes the work order. Held, Rejected and zero-output batches are refused.
Agree when entry and exit are captured before comparing recorded duration with an operating target. At a shared station, identify the unit's product with the operator and use that product's route target. Discuss waiting and rework so the team understands what affected the interval.
Yes, as a setup connection. Agree record matching, permitted updates and retry handling, then rehearse the integration with the pilot product and serials. The connections guide describes the handoffs to prepare.
Confirm the operator-to-user links, station availability, route order and component lot balances. Test a refused production release, duplicate pass capture, a material reversal and a refused batch release, then reconcile an accepted run through finished inventory.
Start free, then use Proto to change fields, steps and approvals before your team goes live.