All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. BOM Management
  2. Features
  3. Component structure
Feature · Component structure

Component structure

Review each component quantity, stated unit and scrap allowance against its editable parent revision.

OverviewDraft component structure
BOM Management · Component structure

Draft component structure

Approval waits for the manager

New
IdRevisionComponentQuantity perUnitScrap percent
WO-2026-0412Pump assembly 80 mm, revision CStainless impeller, 80 mm490each10
BOM-REV-2026-018Pressure sensor kit, revision ANitrile shaft seal, 24 mm800kilogram16
PO-2026-0881Motor coupling 24 mm, revision AStainless impeller, 80 mm50meter18
BATCH-2026-103Mounting bracket left, revision EPump assembly, 80 mm850liter4
MI-2026-0294Pump assembly 80 mm, revision DControl enclosure, compact490set17
6 of 6 records
WO-2026-0412BOM components · BMC-81528
RevisionPump assembly 80 mm, revision C
ComponentStainless impeller, 80 mm
Quantity per490
Uniteach
Scrap percent10
Example screen with sample data

What you can do

Make the assembly requirement explicit

The planner needs to know what goes into an assembly before deciding whether its structure is ready for review. A component line holds the revision and component references with quantity per assembly, unit and scrap percentage. Each line belongs to a specific BOM revision. The component reference resolves to an item record, so similar component names can be checked against the actual item identity used in purchasing and stock records.

The component workflow requires a positive quantity, a stated unit and a scrap percentage within the permitted range. Its parent revision must not be Released. Validation confirms an eligible structure once and keeps the review focused on the parent revision. Describe a component as validated only after the guard accepts it, and inspect revision status when deciding whether the parent remains editable.

How the work is organized

  • Quantity per assembly. Record quantity per assembly with its intended unit. The field describes the assembly requirement; it does not create a material issue or prove that stock has been reserved for a production run.
  • Component reference. Select an existing item for the component and link the line to the correct parent revision. The parent product and revision status provide context when the planner is checking lines outside the revision header.
  • Scrap allowance. State scrap percentage deliberately and review its meaning with the operator. The validation range is zero through one hundred. Discuss the allowance with Production Planner when agreeing the material quantities for the run.

What to agree during setup

Agree the relationship between the unit on a component line and the unit on its item record before importing quantities. Where a supplier source uses packs and production uses individual pieces, settle the quantity and unit in the source data. Ask the planner and operator to explain the same requirement using the assembly instructions. Record the agreed unit consistently before loading component quantities.

Choose who may edit component lines during Draft and Review and how the Manager receives a complete structure for release. Configure access to prevent an operator from changing a released requirement. Test the actual workflow guard as well as the screen: a hidden edit button is insufficient evidence that a direct write is rejected.

Check the handoff on an actual case

Prepare an example assembly with a fastening component whose quantity per assembly is four and whose unit is each. Add the line to an editable revision and validate it. In the rehearsal, try a zero quantity and an omitted unit; both should be rejected by the component workflow rather than becoming an apparently usable structure.

Then set scrap percentage outside the permitted range and verify rejection. Release the parent through the engineering decision and attempt to validate a changed component against it. That action must fail because the parent is Released. Prepare the replacement line on a new editable revision instead. Finally, compare the reviewed line with the operator’s instruction source so the same unit and quantity survive the manual production handoff.

What your team sees

  • Draft component structure — Components, quantities, units and allowances on Draft revisions.
  • Revision board — Revisions grouped by their review and release status.
  • Revision review — The header whose complete structure is being considered.

Follow the work through

Use revision preparation and release to validate the structure. Follow engineering change review for substitutions, and settle source references in the data model.

What it keeps track of

Data model
BOM components
Component lines within a BOM revision.
BOM revisions
Bill-of-materials revisions for a product.
Items
Materials, components and finished goods.

Who uses it

Permissions
Production Planner
Prepares lines, and Production Operator checks operating meaning during rehearsal.
Manager
Decides the structure release, and Admin maintains the agreed master-data access.
Production Operator
Captures assigned production work and evidence.
Admin
Maintains account-to-person mapping and controlled master data, with operational approvals assigned to their named decision owners.

Set up BOM Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appBOM Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.