All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. BOM Management
  2. Features
  3. Engineering changes
Feature · Engineering changes

Engineering changes

Put the revision, reason, requester and named approver on the same engineering change request.

OverviewEngineering review
BOM Management · Engineering changes

Engineering review

Approval conditions

New
IdRequested atRevisionRequested byApproved byReason
WO-2026-041226 NovImpeller cartridge 80 mm, revision BRina PatelOwen MercerReplace seal material after leak test
BOM-REV-2026-01826 NovPump assembly 80 mm, revision CGabriel ChenElias NovakReduce bracket bend tolerance
PO-2026-088109 NovMotor coupling 24 mm, revision AKofi MensahLucas PereiraAdd alternate sensor supplier
BATCH-2026-10319 NovPump assembly 80 mm, revision CLucas PereiraGabriel ChenCorrect fastener quantity
MI-2026-029421 NovPump assembly 80 mm, revision DGabriel ChenAnika ShahImprove access to test port
6 of 6 records
WO-2026-0412BOM change requests · BR-59890
Review
Requested at26 Nov
RevisionImpeller cartridge 80 mm, revision B
Requested byRina Patel
Approved byOwen Mercer
ReasonReplace seal material after leak test
Example screen with sample data

What you can do

Give a change a deciding owner

A substituted component or revised assembly requirement needs a reason people can inspect. An engineering change request connects that reason to a revision, requester and approver. Request date provides request timing. Status distinguishes Draft, Review, Approved, Rejected and Implemented, so the team can separate a request from the decision and from the work needed to apply it.

The change workflow resolves the revision, requester and approver and requires a recorded reason before moving Draft to Review once. It does not approve the change. The approver reference identifies the intended deciding person, while the approval action itself needs a permission and an actual human decision. Manager owns the engineering decision.

How the work is organized

  • Requested scope. Select the revision under discussion and explain the change in the reason. The revision’s product and status show parent context for the reviewer.
  • Accountable people. Select the requester and approver from people records linked to their user accounts. A similarly named person or a role title typed into reason cannot replace the intended reference.
  • Decision and application. Submit to Review, decide Approved or Rejected, and use Implemented only after the agreed change has actually been applied. The submission workflow stops at Review and cannot establish the later outcomes.

What to agree during setup

During setup, configure approval and rejection actions for the person acting as Manager, plus the planner’s implementation update. Agree what the reviewer inspects in the revision and component lines before deciding. Keep signed design documents in the engineering source your team uses, and agree how the requester directs the reviewer to the applicable instructions. Rehearse an accepted change and a rejected request with that person.

Configure My engineering requests using the requester’s linked user account. Test it with different people and confirm that direct record access follows the same assigned scope. A current-user filter helps a requester find work; it must not grant permission to approve that work or reveal another person’s restricted requests.

Check the handoff on an actual case

Use a demonstration request to replace a component on an assembly. Production Planner records the target revision, explains the reason and names the deciding person. Try submission without reason and with an unresolved approver reference. The workflow should reject those cases, leaving no successful Review transition to imply that the packet is complete.

With the references resolved, submit the request and verify Review. Ask Manager to reject one request and approve a corrected request through the decision actions. Check that an operator cannot make those decisions with ordinary production access. When applying the accepted change, prepare an editable revision, keep the old released structure available and set Implemented only after the planner can show what changed. Include a work order already underway and discuss its instructions separately, so its operator receives the instructions agreed for that run.

What your team sees

  • Engineering review — Submitted requests with reason and deciding person visible.
  • My engineering requests — Requests belonging to the authenticated requester.
  • Approved change follow-up — Decisions awaiting their agreed implementation work.

Follow the work through

Engineering change review covers the decision. Continue with revision preparation and release, and rehearse access using roles.

What it keeps track of

Data model
BOM change requests
Engineering change requests against BOM revisions.
BOM revisions
Bill-of-materials revisions for a product.
BOM components
Component lines within a BOM revision.
People
People records for BOM Management.
Users
Sign-in accounts for the people who use the app.

Who uses it

Permissions
Production Planner
Prepares the request, Manager decides it and Admin maintains account-to-person mapping.
Manager
Owns the named engineering approval and reviews customer and supplier commitments under the agreed decision permissions.
Admin
Agree the decision permissions before go-live.

Set up BOM Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appBOM Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.