Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Campus Facility Management
- Campus identity
- Room scheduling
- Meter collection
- Purchasing
Campus Facility Management organizes maintenance around the campus asset. Facility staff can register equipment and its location, request a work order, issue a safety permit, assign a technician, record work and parts, inspect the result, and retain service history against the same asset.
scheduled waits for the facility manager
| Permit type | Valid from | Valid to | Status | Issued by | Work order | |
|---|---|---|---|---|---|---|
| Hot work | 20 Oct | 23 Oct | Approved | Aditya Rao | Test west campus generator | |
| Confined space entry | 21 Oct | 26 Oct | Approved | Keiko Tanaka | Repair dining hall wash arm | |
| Electrical isolation | 22 Oct | 31 Oct | Approved | Aditya Rao | Inspect science hall pump seal | |
| Roof access | 26 Oct | 30 Oct | Approved | Jasmine Cole | Test west campus generator | |
| Elevator lockout | 24 Oct | 30 Oct | Approved | Ibrahim Diallo | Test west campus generator |
Permit Issuer approves the work authorization and validity interval.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep campus equipment, its location and its service state tied to the work performed.
Assets
| Asset tag | Name | Location | Status | |
|---|---|---|---|---|
| LIB-AHU-02 | Library air handler 2 | Library mechanical room | Active | |
| SCI-PMP-04 | Science hall chilled water pump | Science hall basement | Active | |
| STU-ELV-01 | Student center elevator 1 | Student center west lobby | Active | |
| RES-BLR-01 | North residence boiler | North residence plant room | Active | |
| ART-EF-03 | Arts building exhaust fan | Arts building roof | Active |
Move maintenance requests through permit review, assignment, technician work, inspection and close.
Work orders
| Id | Asset | Assigned to | Completed at | Status | |
|---|---|---|---|---|---|
| WO-2026-1841 | Arts building exhaust fan | Eva Novak | Closed | ||
| WO-2026-1842 | Library air handler 2 | Keiko Tanaka | Closed | ||
| WO-2026-1843 | Student center elevator 1 | Benicio Flores | Closed | ||
| WO-2026-1844 | Science hall chilled water pump | Lucas Meyer | Closed | ||
| WO-2026-1845 | North residence boiler | Keiko Tanaka | Closed |
Link each work authorization to the correct order, issuer and valid work interval.
Safety permits
| Work order | Permit type | Status | Valid from | Valid to | Issued by | |
|---|---|---|---|---|---|---|
| Clear gym pool pump strainer | Hot work | Requested | 16 Oct | 19 Oct | Nadine Saad | |
| Repair dining hall wash arm | Confined space entry | Requested | 28 Oct | 06 Nov | Aditya Rao | |
| Test west campus generator | Electrical isolation | Requested | 19 Oct | 21 Oct | Nadine Saad | |
| Repair dining hall wash arm | Roof access | Requested | 17 Oct | 23 Oct | Aditya Rao | |
| Replace library AHU filter | Elevator lockout | Requested | 18 Oct | 25 Oct | Jasmine Cole |
Keep each asset's maintenance interval, last completion and next due date in view.
Preventive maintenance plans
| Asset | Interval days | Interval hours | Last completed at | Next due at | |
|---|---|---|---|---|---|
| West campus generator | 22 | 5 | 20 Oct | 23 Oct | |
| Library air handler 2 | 25 | 4 | 22 Oct | 23 Oct | |
| North residence boiler | 7 | 3 | 20 Oct | 23 Oct | |
| West campus generator | 10 | 10 | 21 Oct | 23 Oct | |
| Dining hall dishwasher line 2 | 17 | 11 | 12 Oct | 18 Oct |
Record asset readings with units and action limits, then bring exceptions into maintenance review.
Building meters
| Asset | Metric | Value | Unit | Action limit | Read at | |
|---|---|---|---|---|---|---|
| Student center elevator 1 | Electric consumption | 310 | kilowatt-hours | 270 | 25 Oct | |
| North residence boiler | Potable water flow | 880 | gallons | 560 | 14 Oct | |
| Arts building exhaust fan | Steam output | 130 | therms | 550 | 23 Oct | |
| Gymnasium pool pump | Natural gas consumption | 720 | hours | 510 | 17 Oct | |
| Science hall chilled water pump | Cooling water flow | 390 | each | 160 | 30 Oct |
Post parts to the work performed, monitor stock and preserve the completed service record.
Spare parts
| Part number | Name | Unit | Quantity on hand | Reorder point | |
|---|---|---|---|---|---|
| SP-52682 | Air filter, 24 by 24 inch | kilowatt-hours | 440 | 630 | |
| SP-38629 | Pump seal kit, 2 inch | gallons | 610 | 490 | |
| SP-26433 | Elevator door roller assembly | therms | 730 | 760 | |
| SP-42183 | Boiler igniter electrode | hours | 620 | 110 | |
| SP-50308 | Exhaust fan belt, B42 | each | 780 | 780 |
Maintenance work order ships ready to use. 3 steps need a named approval before the work moves on: Approve permit (Permit Issuer), Authorize schedule (Facility Manager) and Inspect work (Inspector).
Identify the asset and maintenance need.
The Permit Issuer authorizes the exact job for a valid interval.
The Facility Manager checks the current permit and assigns the work.
The Technician logs the performed task and interval.
The Inspector accepts the result before close.
Keep the outcome with the asset and completed order.
Open any safety permit to see the roles that work on it, its process stages and its approvals on one page.
Valid from, Valid to, Issued by and Work order.
Records linked to this safety permit.
Admin, Facility Manager and Permit Issuer, each with their own permissions.
Approve permit, with the role that acts.
Approve permit and Authorize schedule, with who decides.
Test west campus generator · Approved
Signed in as Permit Issuer
| Decision | Approver | |
|---|---|---|
| Approve permitThe Permit Issuer authorizes the exact job for a valid interval. | Permit Issuer | |
| Authorize scheduleThe Facility Manager checks the current permit and assigns the work. | Facility Manager | |
| Inspect workThe Inspector accepts the result before close. | Inspector | |
| Approve work orders | Facility Manager | |
| Approve safety permits | Permit Issuer |
Everyone opens Campus Facility Management to the work that is theirs. Pick a role to see what it starts with.
Configures users and maintains reference data for the facilities team.
Plans maintenance, assigns work and reviews asset condition.
This is the first screen this role sees.
Work orders · Facility Manager
Issues and closes safety permits for identified work orders.
This is the first screen this role sees.
Safety permits · Permit Issuer
Records the work and parts used on assigned work orders.
This is the first screen this role sees.
Work orders · Technician
Checks completed work and records whether it can close.
This is the first screen this role sees.
Work orders · Inspector
Maintains the spare part catalog and reviews stock at its reorder point.
This is the first screen this role sees.
Part usage · Inventory Clerk
| Work order | Part | Quantity | Used at | |
|---|---|---|---|---|
| Reset student center elevator | Generator oil filter | 180 | 20 Oct | |
| Clear gym pool pump strainer | Pump seal kit, 2 inch | 830 | 17 Oct | |
| Repair arts building exhaust fan | Air filter, 24 by 24 inch | 790 | 23 Oct | |
| Test west campus generator | Pump seal kit, 2 inch | 930 | 13 Oct | |
| Clear gym pool pump strainer | Dishwasher wash arm gasket | 810 | 13 Oct |
Review maintenance status, permit validity, asset service and spare part use.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Requested | 30 | ||
| Approved | 18 | 60% | |
| Expired | 13 | 72% | |
| Closed | 8 | 62% |
Sample counts per stage
Show the maintenance queue by current work order status.
Group scheduled work by asset and due date.
Show approved permits and their validity dates against work orders.
Show work log intervals and performed work by technician.
Group consumed quantities by work order and part.
Compare quantity on hand with each spare part's reorder point.
Show next due dates and recorded intervals by asset.
Compare each reading's value with its action limit and asset.
Group outcomes and next due dates by asset and closed work order.
See how Campus Facility Management fits your kind of team.
Coordinate maintenance across teaching buildings, plant equipment and shared campus spaces.
Maintain shared research-building equipment with clear work authorization and service history.
Keep maintenance requests and equipment records consistent across dispersed buildings.
Each stage of maintenance work order names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Give each facilities role a way to ask about its work and prepare the next action.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
Choose the first building or equipment group and identify the staff who will request, authorize, perform and inspect work.
Check asset tags, locations, staff identities, part units and stock levels. Add preventive plans and meter points with agreed dates and limits.
Run a request through permit issue, scheduling, technician log, part posting, inspection and service history.
Compare the asset state, work order status, permit interval, stock balance and completed service entry with the expected outcome.
Add the next building or asset group after the first team can repeat the handoffs consistently.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Campus Facility Management for your business. Start with a small group of campus assets, staff, permits and parts, then rehearse one complete work order.
Yes. Each asset has a tag, name, location, manufacturer and serial number. Use a consistent location rule so staff can find the same unit in the register and on site.
The planning action checks the order, its asset and an approved permit for that order whose validity covers today. The facility manager then assigns a person and due date.
The technician records the work interval and performed task. An inspector accepts the result before the order closes and service history is recorded.
A plan records an asset, day and hour intervals, last completion and next due date. The facility manager reviews due plans and starts a work order for the actual service.
It records a metric, value, unit, action limit, date and asset. A reading at its action limit flags the asset for maintenance review.
Yes. Part usage links the part and quantity to a work order. Posting reduces stock once and flags reorder at the recorded point.
Service history links the accepted outcome and next due date to the asset and work order. Closed work orders give the corresponding job record.
After the authorized work is finished, the Permit Issuer closes the permit by its identifier. The work order keeps its own inspection and service history.
Start free, then use Proto to change fields, steps and approvals before your team goes live.