Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Facility Maintenance Mgmt
- Condition instruments
- Purchasing
- Identity
Facility Maintenance Mgmt organizes maintenance around an asset and its work order. A manager can see requested, scheduled and active work; a planner can connect the assignee and due date; and a technician can record the work performed.
Work orders in one list
Permit Issuer approves the permit and its validity interval.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep each asset request, assignee and due date visible through review and close.
Work orders
| Id | Asset | Work type | Completed at | Assigned to | Status | |
|---|---|---|---|---|---|---|
| Work order WO-2026-0418 | Dock door motor 4 | Preventive | Emily Russo | Closed | ||
| Permit SP-2026-0142 | Fire pump 1 | Corrective | Jonah Becker | Closed | ||
| Work order WO-2026-0420 | Roof exhaust fan 7 | Inspection | Ava Coleman | Closed | ||
| Permit SP-2026-0143 | Chiller 1, plant room | Preventive | Marisol Vega | Closed | ||
| Work order WO-2026-0422 | Dock door motor 4 | Corrective | Tariq Hassan | Closed |
Keep the equipment register and threshold readings tied to the work they trigger.
Assets
| Asset tag | Name | Location | Status | |
|---|---|---|---|---|
| AHU-E2-014 | Air handler 2, east wing | East wing mechanical room | Active | |
| CH-PLANT-001 | Chiller 1, plant room | Central plant room | Active | |
| EL-FRT-003 | Freight elevator 3 | Loading dock level 1 | Active | |
| BLR-S-002 | Boiler 2, south plant | South boiler room | Active | |
| RF-EXH-007 | Roof exhaust fan 7 | Roof zone C | Active |
Keep asset intervals and next due dates ready for the planning queue.
Preventive schedules
| Asset | Interval days | Interval hours | Last completed at | Next due at | |
|---|---|---|---|---|---|
| Chiller 1, plant room | 11 | 9 | 10 Oct | 18 Oct | |
| Chiller 1, plant room | 2 | 5 | 14 Oct | 22 Oct | |
| Boiler 2, south plant | 19 | 9 | 15 Oct | 18 Oct | |
| Air handler 2, east wing | 2 | 7 | 19 Oct | 23 Oct | |
| Fire pump 1 | 21 | 16 | 13 Oct | 22 Oct |
Require a valid approved permit before work is scheduled.
Scheduled waits for the maintenance planner
| Id | Work order | Permit type | Valid from | Valid to | Status | |
|---|---|---|---|---|---|---|
| Work order WO-2026-0418 | Test boiler 2 relief valve | Hot work | 15 Oct | 18 Oct | Approved | |
| Permit SP-2026-0142 | Replace belt on air handler 2 | Confined space entry | 26 Oct | 30 Oct | Approved | |
| Work order WO-2026-0420 | Load test backup generator 2 | Electrical isolation | 27 Oct | 03 Nov | Approved | |
| Permit SP-2026-0143 | Replace belt on air handler 2 | Working at height | 22 Oct | 24 Oct | Approved | |
| Work order WO-2026-0422 | Test boiler 2 relief valve | Fire system impairment | 01 Nov | 07 Nov | Approved |
Record performed work and let a manager inspect it before close.
Work evidence
| Work order | Team member | Started at | Ended at | Work performed | |
|---|---|---|---|---|---|
| Inspect chiller 1 vibration | Jonah Becker | 28 Oct | 23 Oct | Replaced drive belt and checked tension | |
| Inspect chiller 1 vibration | Emily Russo | 22 Oct | 23 Oct | Lubricated motor bearings | |
| Replace belt on air handler 2 | Jonah Becker | 21 Oct | 23 Oct | Calibrated door sensor | |
| Repair freight elevator 3 door | Emily Russo | 11 Oct | 15 Oct | Tested pressure relief valve | |
| Replace belt on air handler 2 | Tariq Hassan | 20 Oct | 23 Oct | Cleaned intake screen |
Connect consumed spare parts and completed outcomes to each work order.
Spare parts
| Part number | Name | Unit | Quantity on hand | Reorder point | |
|---|---|---|---|---|---|
| SP-36331 | Air handler drive belt, 42 in | mm/s | 160 | 530 | |
| SP-43025 | Chiller filter cartridge, 10 in | degrees C | 250 | 670 | |
| SP-66669 | Elevator door roller, 2 in | kilopascals | 20 | 510 | |
| SP-90120 | Boiler gasket kit, 3 in | amperes | 870 | 240 | |
| SP-77186 | Roof fan bearing, sealed | hours | 900 | 370 |
Authorize and complete asset work ships ready to use. 3 steps need a named approval before the work moves on: Issue safety permit (Permit Issuer), Plan and authorize work (Maintenance Planner) and Inspect and close work (Maintenance Manager).
Name the equipment and describe the service need.
Permit Issuer approves an interval for the exact work order.
Maintenance Planner verifies permission and sets the assignee and due date.
Technician records the work performed and sends it for review.
Maintenance Manager accepts the result and preserves service history.
Use the completed outcome when planning the next visit.
Open any work order to see its safety permits, the roles that work on it, its process stages and its approvals on one page.
Asset, Status, Assigned to and Due date.
Each line is linked to this work order.
Maintenance Manager, Maintenance Planner and Technician, each with their own permissions.
Request asset work and Plan and authorize work, with the role that acts.
Issue safety permit and Plan and authorize work, with who decides.
Backup generator 2 · Preventive
| Work order | Permit type | Valid from |
|---|---|---|
| Test boiler 2 relief valve | Hot work | 18 Oct |
| Replace belt on air handler 2 | Confined space entry | 28 Oct |
| Replace roof fan 7 bearing | Electrical isolation | 21 Oct |
Permit Issuer validates the interval and approves permission for the named order.
Signed in as Permit Issuer
| Decision | Approver | |
|---|---|---|
| Issue safety permitPermit Issuer approves an interval for the exact work order. | Permit Issuer | |
| Plan and authorize workMaintenance Planner verifies permission and sets the assignee and due date. | Maintenance Planner | |
| Inspect and close workMaintenance Manager accepts the result and preserves service history. | Maintenance Manager | |
| Approve work orders | Maintenance Manager | |
| Approve safety permits | Permit Issuer |
Everyone opens Facility Maintenance Mgmt to the work that is theirs. Pick a role to see what it starts with.
Owns the maintenance queue, reviews completed work and decides whether to accept closeout.
This is the first screen this role sees.
Work orders · Maintenance Manager
Checks asset readiness, permit validity, assignee and due date before scheduling work.
This is the first screen this role sees.
Work orders · Maintenance Planner
Performs assigned work and records evidence and consumed parts against the work order.
This is the first screen this role sees.
Work orders · Technician
Issues and closes safety permits for the named work order and validity interval.
This is the first screen this role sees.
Safety permits · Permit Issuer
Maintains spare part records and checks stock after work order consumption.
This is the first screen this role sees.
Spare parts · Parts Coordinator
| Part number | Name | Unit | Quantity on hand | Reorder point | |
|---|---|---|---|---|---|
| SP-36331 | Air handler drive belt, 42 in | mm/s | 160 | 530 | |
| SP-43025 | Chiller filter cartridge, 10 in | degrees C | 250 | 670 | |
| SP-66669 | Elevator door roller, 2 in | kilopascals | 20 | 510 | |
| SP-90120 | Boiler gasket kit, 3 in | amperes | 870 | 240 | |
| SP-77186 | Roof fan bearing, sealed | hours | 900 | 370 |
Maintains user and team member access and the core reference records.
Review work state, due service, condition limits and stock decisions.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Requested | 30 | ||
| Approved | 19 | 63% | |
| Scheduled | 10 | 53% | |
| In Progress | 7 | 70% |
Sample counts per stage
Which requests still need a permit, assignment or close review?
Which assigned jobs approach their due date?
What work was completed on a particular asset?
Which recorded values reached their action limits?
Which assets have a next due date requiring attention?
Compare Approved permit valid from and valid to with its work order.
Which stocked items need replenishment review?
Group part usage Quantity by work order and Part.
See how Facility Maintenance Mgmt fits your kind of team.
Maintain building equipment across occupied sites while keeping the work queue clear for each property.
Coordinate maintenance on production equipment with a clear permission and closeout trail.
Keep equipment service organized when technicians move between facilities.
Each stage of authorize and complete asset work names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to prepare and review maintenance work with your team.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
Agree asset tags, locations, team identities, part units and starting quantities. Enter the equipment and people needed for the pilot.
Give Permit Issuer, Maintenance Planner, Technician, Maintenance Manager and Parts Coordinator their operating scope. Rehearse a denied action for each decision boundary.
Record one preventive interval and one condition metric. Check the next due list and a threshold reading against the correct asset.
Request work, issue a valid permit, assign a technician, record evidence and parts, then accept closeout. Compare the resulting asset state and service history.
Add more locations and assets only after the team can explain the pilot’s records and handoffs.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Facility Maintenance Mgmt for your business. Begin with a small group of assets, team members, one preventive plan and a representative work order. Rehearse the permit and closeout decisions before expanding.
It names the asset, work type, description, request date, assignee, due date and current state. The same order links the permit, performed work, used parts and completed service history.
Permit Issuer approves a permit for the order and a valid date interval. Maintenance Planner checks that approval before scheduling an assignee and due date.
Yes. Preventive schedules record an asset, interval and next due date. A work order carries the assignment and execution for a particular visit.
The reading is recorded against its asset and the asset is flagged for maintenance. Maintenance Manager can review the result and request the appropriate work.
Work evidence links the technician, time interval and description of performed work to the work order. Maintenance Manager reads it during close review.
Part usage links a catalog part and quantity to the order. Posting reduces on-hand stock once and checks the reorder point.
An accepted closeout marks the order Closed, creates service history for the asset and returns an asset flagged for maintenance to service.
Yes. Agree a handoff from the reorder review to your purchasing system during setup, with a named owner for stock decisions.
Start free, then use Proto to change fields, steps and approvals before your team goes live.