Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Wind Farm Management
- Meter data
- Turbine controller and SCADA
- Finance and settlement
- Identity provider
Wind Farm Management keeps the operating record of wind generation sites in one place: which sites are active, which turbines are operating, curtailed, in maintenance or stopped, what the meters recorded, and what happened when something went wrong. Each site carries its meters, tariffs, operational events and maintenance tasks.
Operational events in one list
The site manager approves each maintenance task before work starts.
Every feature works on the same records. Pick one to see the screen your team works in.
Site register, turbine status and rated capacity.
Turbines
Meters, raw readings and validated energy intervals.
Energy intervals
| Id | Meter | Starts at | Ends at | Energy quantity | Unit | |
|---|---|---|---|---|---|---|
| EVT-2026-4101 | Willow Gap substation meter | 14 Nov | 23 Nov | 150 | kilowatt-hours | |
| TASK-2026-2204 | Prairie Lantern revenue meter | 11 Nov | 15 Nov | 60 | megawatt-hours | |
| SITE-031 | Silver Ridge revenue meter | 16 Nov | 25 Nov | 500 | kilowatts | |
| INT-20261015-08 | Willow Gap substation meter | 21 Nov | 29 Nov | 50 | megawatts | |
| TINT-20261015-09 | Stone Creek export meter | 09 Nov | 15 Nov | 60 | dollars per megawatt-hour |
Production intervals with wind speed and availability.
Turbine intervals
| Id | Turbine | Starts at | Ends at | Energy kWh | Wind speed MPS | |
|---|---|---|---|---|---|---|
| EVT-2026-4101 | Prairie Lantern turbine 08 | 15 Nov | 19 Nov | 660 | 760 | |
| TASK-2026-2204 | Stone Creek turbine 06 | 13 Nov | 17 Nov | 90 | 550 | |
| SITE-031 | Prairie Lantern turbine 08 | 09 Nov | 12 Nov | 230 | 250 | |
| INT-20261015-08 | Cedar Mesa turbine 02 | 06 Nov | 09 Nov | 910 | 820 | |
| TINT-20261015-09 | Cedar Mesa turbine 02 | 17 Nov | 20 Nov | 520 | 650 |
Outages, alarms, curtailments and maintenance events by site.
Approval conditions
| Id | Task | Site | Assigned to | Due date | Status | |
|---|---|---|---|---|---|---|
| EVT-2026-4101 | Inspect turbine 03 yaw drive | Cedar Mesa Wind Farm | Theo Mensah | 10 Nov | Open | |
| TASK-2026-2204 | Test substation breaker | Silver Ridge Wind Farm | Amara Singh | 26 Nov | Open | |
| SITE-031 | Replace meter communications module | Stone Creek Wind Farm | Rafael Costa | 10 Nov | Open | |
| INT-20261015-08 | Repair blade leading edge | Prairie Lantern Wind Farm | Rafael Costa | 13 Nov | Open | |
| TINT-20261015-09 | Verify grid curtailment notice | Blue Heron Wind Farm | Mei Chen | 29 Nov | Open |
Assigned tasks from approval to completion.
Maintenance tasks
| Id | Task | Site | Due date | Status | |
|---|---|---|---|---|---|
| EVT-2026-4101 | Inspect turbine 03 yaw drive | Cedar Mesa Wind Farm | 09 Nov | Open | |
| TASK-2026-2204 | Test substation breaker | Highplain Wind Farm | 14 Nov | Approved | |
| SITE-031 | Replace meter communications module | North Vale Wind Farm | 16 Nov | In progress | |
| INT-20261015-08 | Repair blade leading edge | Prairie Lantern Wind Farm | 21 Nov | Completed | |
| TINT-20261015-09 | Verify grid curtailment notice | Cedar Mesa Wind Farm | 23 Nov | Open |
Power purchase rates and production reports.
Tariffs
| Id | Site | Effective from | Effective to | Rate per unit | Unit | |
|---|---|---|---|---|---|---|
| EVT-2026-4101 | Cedar Mesa Wind Farm | 07 Nov | 15 Nov | 930 | kilowatt-hours | |
| TASK-2026-2204 | Willow Gap Wind Farm | 09 Nov | 11 Nov | 270 | megawatt-hours | |
| SITE-031 | Highplain Wind Farm | 17 Nov | 22 Nov | 210 | kilowatts | |
| INT-20261015-08 | Cedar Mesa Wind Farm | 06 Nov | 13 Nov | 850 | megawatts | |
| TINT-20261015-09 | Blue Heron Wind Farm | 11 Nov | 20 Nov | 610 | dollars per megawatt-hour |
Event to resolution ships ready to use. One step needs a named approval before the work moves on: Approve maintenance (Site Manager).
Open an event for any outage, alarm, curtailment or maintenance on the site.
Take ownership with the real start time and raise a maintenance task if needed.
The site manager approves the work before it starts.
The technician does the work and records when it was completed.
Record the real end time once the site has recovered.
Open any operational event to see the roles that work on it, its process stages and its approvals on one page.
Site, Started at, Description and Status.
Records linked to this operational event.
Site Manager, Operations Engineer and Maintenance Technician, each with their own permissions.
Log event, with the role that acts.
Approve maintenance, with who decides.
Silver Ridge Wind Farm · Outage
Signed in as Site Manager
| Decision | Approver | |
|---|---|---|
| Approve maintenanceThe site manager approves the work before it starts. | Site Manager | |
| Approve maintenance tasks | Site Manager | |
| Approve turbine intervals | Performance Reviewer |
Everyone opens Wind Farm Management to the work that is theirs. Pick a role to see what it starts with.
Owns site status, tariffs and the approval of maintenance work.
This is the first screen this role sees.
Operational events · Site Manager
Records turbine state and production and runs operational events from logging to resolution.
This is the first screen this role sees.
Operational events · Operations Engineer
Carries out approved maintenance tasks and records completion.
This is the first screen this role sees.
Maintenance tasks · Maintenance Technician
Owns meters, raw readings and the validated energy intervals derived from them.
This is the first screen this role sees.
Energy intervals · Energy Analyst
| Id | Meter | Starts at | Ends at | Energy quantity | Unit | |
|---|---|---|---|---|---|---|
| EVT-2026-4101 | Willow Gap substation meter | 14 Nov | 23 Nov | 150 | kilowatt-hours | |
| TASK-2026-2204 | Prairie Lantern revenue meter | 11 Nov | 15 Nov | 60 | megawatt-hours | |
| SITE-031 | Silver Ridge revenue meter | 16 Nov | 25 Nov | 500 | kilowatts | |
| INT-20261015-08 | Willow Gap substation meter | 21 Nov | 29 Nov | 50 | megawatts | |
| TINT-20261015-09 | Stone Creek export meter | 09 Nov | 15 Nov | 60 | dollars per megawatt-hour |
Reviews submitted turbine production evidence and records the review outcome.
This is the first screen this role sees.
Turbines · Performance Reviewer
Maintains users, people and configuration without taking operating decisions.
Energy, availability, events, maintenance, reading quality and tariffs by site.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Open | 28 | ||
| Acknowledged | 11 | 39% | |
| Resolved | 4 | 36% |
Sample counts per stage
How much validated energy did each site and meter produce, and how much coverage was rejected?
For each turbine, how many minutes was it available, what did it produce and what was the wind speed?
Which outages, alarms, curtailments and maintenance events affected each site, and for how long?
Which events are still open or acknowledged, and what maintenance task is linked to them?
Are tasks completed by their due dates, by site and assignee?
Meter readings by quality flag and meter, to find meters that need attention.
Effective power purchase rates by site and unit over time.
See how Wind Farm Management fits your kind of team.
Each stage of event to resolution names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Prepare and review wind farm operations work with Proto.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
The system holds sites, turbines, meters, readings, energy intervals, production intervals, events, maintenance tasks and tariffs. Turbine control, SCADA, settlement and spare parts stay in connected systems. Your team decides maintenance approvals and how availability is counted.
Agree stable site names, turbine numbers and meter numbers, each meter’s reading mode and unit, and each site’s timezone. Load open events and tasks, current tariffs and one period of readings.
Pilot one site: run events and maintenance live for a month and build validated energy for the same month.
A duplicate meter reading must not create a second energy interval. An invalid reading must become rejected coverage rather than zero energy. An event cannot be resolved without its real end time, and maintenance cannot start before approval.
Compare validated energy with the meter operator’s figures and event history with shift records. Get sign-off from the site manager and agree the rollback window before cut-over.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Wind Farm Management for your business. Start with one site: run events and maintenance live for a month and build validated energy for the same month before adding more sites.
No. Turbine control and instrument data stay in those systems. Wind Farm Management keeps the operating record: events, maintenance, metered energy and production intervals, which you can import from them.
Missing or invalid readings become rejected coverage, not zero energy. The gap stays visible to the energy analyst and is shown next to the validated total in energy reports.
No. A reading for the same meter and time as an existing one is ignored, so the same file can be loaded twice safely.
As operational events of type curtailment, with the real start and end times of the instruction. You agree during setup how availability treats a curtailed turbine.
The site manager approves each task before work starts. Technicians see their approved tasks and record completion with a date.
Yes. A correction is added as later evidence for the turbine; the original interval is kept, so you can always see what was first reported.
Yes. Every record belongs to a site, and reports compare energy, availability and events across sites.
Ordinary manual use has no per-user charge under the platform policy. Imports, integrations, agent execution and other machine work use prepaid credits; implementation is scoped separately. The pricing page lists current rates.
Start free, then use Proto to change fields, steps and approvals before your team goes live.