These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
Feature · Assets
Example screen with sample data
Assets
Keep campus equipment, its location and its service state tied to the work performed.
OverviewAssets In Service×
Campus Facility Management · Assets
New
Assets In Service
Assets
| Asset tag | Name | Location | Status | |
|---|---|---|---|---|
| AT-548 | Asset 970 | M-16 | Active | |
| AT-519 | Asset 442 | M-18 | Active | |
| AT-361 | Asset 460 | H-10 | Active | |
| AT-555 | Asset 846 | R-8 | Active | |
| AT-757 | Asset 200 | B-19 | Active |
6 of 6 records
AT-548Assets · ASS-55143
ActiveNameAsset 970
LocationM-16
What you can do
Know which asset needs attention
A facility manager needs to identify the right equipment before anyone starts a repair. The asset register gives each item a name, asset tag, location, manufacturer, serial number, commissioning date and service state. A technician can check those details on the work order rather than relying on a room description in a message.
The asset record connects requests, preventive plans, meter readings and completed service. When a reading reaches its action limit, the capture action flags the asset for maintenance. During execution, the work action also flags the asset for maintenance. An accepted inspection closes the work order, records service history and returns the asset to active service. That sequence gives the team a direct way to distinguish equipment still under work from equipment ready for use.
How the work is organized
- Identify equipment. Use the asset tag and serial number to distinguish similar units in the same building.
- Review current state. Read the asset status alongside its open work and recent service.
- Follow the history. Keep meter readings, plans and completed service connected to the asset that received the work.
A cooling unit in a campus teaching building might have a routine preventive plan and a later meter reading that reaches its action limit. The facility manager can see both records against that unit, then inspect the open work order and its assigned technician. The reading is an observation; the work order is the record of the intervention.
What to agree during setup
Choose a consistent asset tag format and location naming rule. Decide who can change an asset’s state and how staff will confirm a physical serial number when a unit is replaced. Import the equipment that the first operating team will maintain, with enough identity data to avoid confusing adjacent units.
Agree which readings are useful for each asset and what units and action limits staff will enter. Review the plan interval and due-date convention with the maintenance team. A date is useful only when everyone uses the same local operating calendar and understands when a due item enters the queue.
Check the handoff on an actual case
Pick one known unit, enter its physical identity and location, then capture a reading below the action limit. Capture a second reading at the limit and confirm that the unit is flagged for maintenance. Request work against the same asset, authorize it with a valid permit, perform and inspect the job. Confirm that the service history names that asset and that the asset returns to active service after acceptance.
If two assets share a name, use their tags and serial numbers to check that the permit, work log, part usage and service entry all stay with the intended item. That rehearsal catches ambiguous location and equipment labels before the team depends on them.
What your team sees
- Asset Register — Equipment identity, location and current service state in one register.
- Assets In Service — Active equipment available for routine operations.
- Service History Register — Completed outcomes and next due dates for serviced assets.
Follow the work through
Start with condition readings and follow a flagged asset into the maintenance work order. The data model shows the record links.
What it keeps track of
Data model- Assets
- Campus asset registry
- Work orders
- Maintenance work orders through their lifecycle
- Building meters
- Building meter readings per asset: measurement point, value, unit and action limit.
- Preventive maintenance plans
- Preventive maintenance intervals per asset: last completion and next due date.
- Service history
- Completed maintenance history per asset
Who uses it
Permissions- Facility Manager
- Maintains the asset scope and reviews state changes.
- Technician
- Checks the equipment before work.
- Inspector
- Verifies the accepted result.
- Admin
- Maintains the initial register.
Set up Campus Facility Management your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.