All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Product Lifecycle Mgmt (PLM)
  2. Features
  3. Batch acceptance
Feature · Batch acceptance

Batch acceptance

Release inspected pending output and reconcile the finished-goods inventory effect.

OverviewPending batch decisions
Product Lifecycle Mgmt (PLM) · Batch acceptance

Pending batch decisions

Action waits for the quality inspector

New
IdWork orderLot numberProduced atExpiry dateDisposition
WO-2026-0418Marsh bracket forming, 250 unitsL26-962917 Nov22 NovPending
ECN-2026-012Alder housing coating, 300 unitsL26-804508 Nov13 NovPending
SO-2026-0831Marsh bracket forming, 250 unitsL26-025910 Nov16 NovPending
PO-2026-0226Alder housing coating, 300 unitsL26-583122 Nov29 NovPending
LOT-26-1048Alder housing coating, 300 unitsL26-483715 Nov18 NovPending
6 of 6 records
WO-2026-0418Batches · BTC-75404
Pending
Work orderMarsh bracket forming, 250 units
Lot numberL26-9629
Produced at17 Nov
Expiry date22 Nov
Example screen with sample data

What you can do

Decide which pending output can enter finished goods

Quality Inspector reviews the Pending batch against its work order and lot identity. Production date and expiry date provide dated context for the output. The inspector needs the actual inspection and accepted-quantity evidence before authorizing release. Production Planner watches the related work-order outcome while Inventory Controller reconciles the resulting stock.

The accepted-output action requires Pending disposition. Held and Rejected batches are ineligible. Success marks the batch Released and increases finished-goods inventory by the accepted quantity once. The action completes the work order only when every sibling batch is terminal, so the planner needs the whole sibling population when explaining whether production is complete.

How the work is organized

  • Inspect pending scope. Review the work order and lot alongside production evidence. Confirm which output is being examined and resolve any disagreement about its identity before deciding acceptance.
  • Retain acceptance evidence. Keep the accepted quantity and the inspection basis available for the release action. Quality Inspector should be able to explain the decision from that evidence after the result is recorded.
  • Reconcile siblings. Inspect the other batches associated with the work order. Resolve outstanding disposition through the authorized action before explaining completion to the operating team.

What to agree during setup

Agree the inspection evidence, deciding person and finished-goods destination used by the release action. Test the decision with the ordinary Quality Inspector account. Decide how Inventory Controller retrieves the accepted basis when comparing the receipt with the changed balance. The inspector and inventory team should recognize the same product and lot without resolving identity from a name alone.

Rehearse the hold and rejection procedures your team will use and decide who follows up on excluded output. Review expiry dates as part of the operating attention routine. Agree where detailed inspection results originate; any connection to another quality system is a setup choice. Preserve the evidence needed to explain both accepted inventory and output still awaiting disposition.

Check the handoff on an actual case

Take a Pending housing batch from a recorded production interval. Quality Inspector examines the inspection and accepted-quantity evidence, then invokes release. Inspect the Released result and selected finished-goods balance. Repeat the same action and confirm that the receipt remains unchanged after its original successful effect.

Try a Held batch and a Rejected batch. Neither may pass the accepted-output action. Resolve the cause through the authorized quality procedure and keep the excluded output visible for follow-up. Inventory Controller should be able to explain why those batches have not supplied accepted stock.

Next, use a work order with another sibling still Pending and release only its eligible inspected batch. Production Planner checks that the work remains incomplete while that sibling needs a decision. Once the terminal-state requirement is satisfied, explain the work-order result and reconcile received inventory to output actually accepted. Retain the separate disposition of any held or rejected output when reporting the operating outcome.

What your team sees

  • Pending batch decisions — Inspect pending lots and their work-order context before deciding acceptance.
  • Held and rejected batches — Keep excluded output visible for authorized follow-up.
  • Lot balances on hand — Inspect positive on-hand inventory after the controlled receipt, with reservations visible.

Follow the work through

Record and accept output rehearses the final handoff. Review and implement changes supplies the earlier design context. Use implementation to prepare the pilot.

What it keeps track of

Data model
Batches
Produced batches and disposition.
Work orders
Production work orders.
Production logs
Production interval logs.
Inventory balances
Item inventory balances by location and lot.
Items
Materials, components and finished goods.
Design documents
Controlled design documents and approvals.

Who uses it

Permissions
Quality Inspector
Decides acceptance.
Production Planner
Checks work completion and Inventory Controller reconciles the stock result.
Inventory Controller
Prepares and posts eligible lot-based material issues and reconciles stock effects.
Admin
Configures access and reference data while engineering and quality owners retain their decision responsibilities.

Set up Product Lifecycle Mgmt (PLM) your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appProduct Lifecycle Mgmt (PLM)

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.