Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- ERP + Quality for Pharma
- Laboratory results
- Equipment service records
- Document evidence
- Regulatory filing process
ERP + Quality for Pharma keeps a manufacturing batch connected to its product, test results, deviations, corrective actions and release decisions. Production records the lot and its lifecycle.
effective waits for the QA manager
| Capa number | Title | Deviation | Owner name | Due date | Status | |
|---|---|---|---|---|---|---|
| CA-41403 | Retrain blend time checks | Late balance calibration | Amira Salcedo | 17 Oct | Pending effectiveness check | |
| CA-15808 | Add second balance verification | Unexpected fill weight variation | Dinesh Rao | 13 Oct | Pending effectiveness check | |
| CA-62379 | Revise vial seal inspection | Assay result outside alert range | Elise Moreau | 17 Oct | Pending effectiveness check | |
| CA-86379 | Install cold room alarm backup | Cold room temperature excursion | Tariq Mensah | 27 Oct | Pending effectiveness check | |
| CA-52191 | Audit carton label reconciliation | Cleaning rinse sample omitted | Hana Velasquez | 03 Nov | Pending effectiveness check |
QA Manager decides whether the batch can be marked Approved.
Every feature works on the same records. Pick one to see the screen your team works in.
Follow a manufacturing lot from its product record through quality review and release.
Batches
| Batch number | Product | Status | Manufacture date | Expiry date | |
|---|---|---|---|---|---|
| BTC-73602 | Norelis 10 mg sachets | Approved | 12 Oct | 18 Oct | |
| BTC-94274 | Viresta 2 mg oral solution | Approved | 20 Oct | 27 Oct | |
| BTC-52765 | Solmira 25 mg capsules | Approved | 24 Oct | 01 Nov | |
| BTC-33080 | Neraval 10 mg tablets | Approved | 14 Oct | 19 Oct | |
| BTC-85918 | Delmira 1 mg vials | Approved | 23 Oct | 28 Oct |
Connect product acceptance criteria to the outcome recorded for each batch test.
Approval conditions
| Result code | Batch | Quality specification | Test date | Outcome | |
|---|---|---|---|---|---|
| ASSAY-PASS | Viresta 2 mg, lot VS26012 | Delmira vial sterility standard | 11 Oct | Pending | |
| DISS-PASS | Neraval 10 mg, lot NV26041 | Neraval tablet assay, 95 to 105 percent | 28 Oct | Pending | |
| STERILE-PASS | Norelis 10 mg, lot NL26015 | Delmira vial sterility standard | 31 Oct | Pending | |
| PH-RECHECK | Teravin 20 mg, lot TV26027 | Norelis sachet fill weight limit | 17 Oct | Pending | |
| MOISTURE-PASS | Delmira 1 mg, lot DM26009 | Delmira vial sterility standard | 03 Nov | Pending |
Keep an exception, its investigation and corrective action tied to the affected batch.
Capa actions
| Capa number | Title | Owner name | Due date | Status | |
|---|---|---|---|---|---|
| CA-64339 | Retrain blend time checks | Amira Salcedo | 20 Oct | Draft | |
| CA-94289 | Add second balance verification | Dinesh Rao | 20 Oct | Open | |
| CA-35308 | Revise vial seal inspection | Elise Moreau | 13 Oct | In progress | |
| CA-23366 | Install cold room alarm backup | Tariq Mensah | 22 Oct | Pending effectiveness check | |
| CA-10964 | Audit carton label reconciliation | Hana Velasquez | 18 Oct | Effective |
Review the impact and decision for a controlled change before implementation.
Approval conditions
| Change number | Title | Change type | Impact assessment | Status | |
|---|---|---|---|---|---|
| CC-70407 | Revise tablet blend hold time | Process | No Impact | Pending approval | |
| CC-53007 | Qualify alternate carton supplier | Specification | Minor | Pending approval | |
| CC-66601 | Update assay sampling plan | Supplier | Major | Pending approval | |
| CC-74360 | Extend cold room monitoring | Equipment | Regulatory | Pending approval | |
| CC-19201 | Replace vial fill line sensor | Facility | No Impact | Pending approval |
Bring calibration and supplier qualification into quality review.
Equipment
| Equipment code | Equipment name | Calibration status | Next calibration due | Qualification status | |
|---|---|---|---|---|---|
| EQ-TAB-003 | Tablet press 3 | Due Soon | 14 Oct | IQ | |
| EQ-BLD-002 | Blend vessel 2 | Overdue | 24 Oct | OQ | |
| EQ-HPLC-004 | HPLC system 4 | Out Of Service | 13 Oct | PQ | |
| EQ-CLD-001 | Cold room logger 1 | Due Soon | 31 Oct | Qualified | |
| EQ-VIAL-002 | Vial filling line 2 | Overdue | 30 Oct | Not Qualified |
Keep the human batch decision separate from the release operation and its receipt.
Release decisions
| Decision code | Batch | Review stage | Decision | Decision date | Reviewed by | |
|---|---|---|---|---|---|---|
| REL-2026-041 | Calden 5 mg, lot CD26076 | QC Data Review | Hold | 31 Oct | Nadia Rahman | |
| HOLD-2026-018 | Moriva 50 mg, lot MV26033 | QA Review | Reprocess | 25 Oct | Victor Chen | |
| REJ-2026-007 | Neraval 10 mg, lot NV26041 | Qualified Person Release | Hold | 01 Nov | Lena Okoro | |
| COND-2026-012 | Teravin 20 mg, lot TV26027 | Final Batch Release | Reprocess | 15 Oct | Mateo Ruiz | |
| RETEST-2026-006 | Norelis 10 mg, lot NL26015 | QC Data Review | Hold | 29 Oct | Sora Kim |
Batch quality to release ships ready to use. 2 steps need a named approval before the work moves on: Quality review (QA Manager) and Batch release (Qualified Person).
Create the lot against its product and manufacturing context.
Record outcomes against the batch and product specification.
Investigate exceptions on the affected lot.
Track corrective work and its effectiveness result.
Review tests, exceptions, changes and calibration before approval.
Record the human decision and reconcile the posting receipt.
Open any capa action to see the roles that work on it, its process stages and its approvals on one page.
Deviation, Owner name and Due date.
Records linked to this capa action.
Admin, QA Manager and Qualified Person, each with their own permissions.
CAPA follow-up, with the role that acts.
Quality review and Batch release, with who decides.
Late balance calibration · Pending effectiveness check
Signed in as QA Manager
| Decision | Approver | |
|---|---|---|
| Quality reviewReview tests, exceptions, changes and calibration before approval. | QA Manager | |
| Batch releaseRecord the human decision and reconcile the posting receipt. | Qualified Person | |
| Approve change controls | QA Manager | |
| Approve release decisions | Qualified Person |
Everyone opens ERP + Quality for Pharma to the work that is theirs. Pick a role to see what it starts with.
Sets up users, reference data and access for the operating team.
Owns the batch record and follows its manufacturing status.
This is the first screen this role sees.
Batches · Production Manager
Records test outcomes and reviews the applicable product specification.
This is the first screen this role sees.
Test results · QC Analyst
| Result code | Batch | Quality specification | Test date | Outcome | |
|---|---|---|---|---|---|
| ASSAY-PASS | Viresta 2 mg, lot VS26012 | Delmira vial sterility standard | 11 Oct | Pending | |
| DISS-PASS | Neraval 10 mg, lot NV26041 | Neraval tablet assay, 95 to 105 percent | 28 Oct | Pending | |
| STERILE-PASS | Norelis 10 mg, lot NL26015 | Delmira vial sterility standard | 31 Oct | Pending | |
| PH-RECHECK | Teravin 20 mg, lot TV26027 | Norelis sachet fill weight limit | 17 Oct | Pending | |
| MOISTURE-PASS | Delmira 1 mg, lot DM26009 | Delmira vial sterility standard | 03 Nov | Pending |
Investigates quality issues, owns corrective actions and reviews controlled changes.
This is the first screen this role sees.
Change controls · QA Manager
| Change number | Title | Change type | Impact assessment | Status | |
|---|---|---|---|---|---|
| CC-70407 | Revise tablet blend hold time | Process | No Impact | Pending approval | |
| CC-53007 | Qualify alternate carton supplier | Specification | Minor | Pending approval | |
| CC-66601 | Update assay sampling plan | Supplier | Major | Pending approval | |
| CC-74360 | Extend cold room monitoring | Equipment | Regulatory | Pending approval | |
| CC-19201 | Replace vial fill line sensor | Facility | No Impact | Pending approval |
Makes the independent batch release decision after quality review.
This is the first screen this role sees.
Batches · Qualified Person
Maintains calibration and qualification records for equipment used in production or testing.
This is the first screen this role sees.
Equipment · Equipment Coordinator
| Equipment code | Equipment name | Calibration status | Next calibration due | Qualification status | |
|---|---|---|---|---|---|
| EQ-TAB-003 | Tablet press 3 | Due Soon | 14 Oct | IQ | |
| EQ-BLD-002 | Blend vessel 2 | Overdue | 24 Oct | OQ | |
| EQ-HPLC-004 | HPLC system 4 | Out Of Service | 13 Oct | PQ | |
| EQ-CLD-001 | Cold room logger 1 | Due Soon | 31 Oct | Qualified | |
| EQ-VIAL-002 | Vial filling line 2 | Overdue | 30 Oct | Not Qualified |
Maintains supplier qualification and assists with supplier changes.
This is the first screen this role sees.
Suppliers · Supplier Manager
| Supplier code | Supplier name | Qualification status | Next audit date | Material type | |
|---|---|---|---|---|---|
| SUP-ING-041 | Larkspur Ingredient Works | Prospective | 31 Oct | Active Ingredient | |
| SUP-EXC-018 | Morrow Excipient Labs | Conditional | 30 Oct | Excipient | |
| SUP-PKG-022 | Westhaven Packaging Co. | Disqualified | 02 Nov | Packaging Component | |
| SUP-CHEM-014 | Cedar Vale Chemical Supply | Prospective | 24 Oct | Primary Container | |
| SUP-GLS-009 | Harbor Ridge Glassworks | Conditional | 30 Oct | Service Provider |
Ask focused questions about batch status, exceptions, readiness and release evidence.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 38 | ||
| Open | 16 | 42% | |
| In progress | 6 | 38% | |
| Pending effectiveness check | 2 | 33% |
Sample counts per stage
Group batches by product and current status to see work awaiting review.
Compare pass, fail and pending outcomes for each referenced specification.
Show open investigations by severity, status and batch.
Show due dates, action owners and effectiveness outcomes for corrective actions.
Compare impact assessment, filing requirement and change status.
List equipment by calibration status and next calibration date.
Review qualification state and next audit date by supplier.
Follow each batch through review stage, decision, reviewer and rationale.
Compare succeeded, failed, skipped and pending release operations by batch.
See how ERP + Quality for Pharma fits your kind of team.
Track tablet lots with product specifications, test outcomes and release decisions.
Connect injectable batch testing, equipment condition and release review.
Follow investigational product lots through controlled testing and quality decisions.
Each stage of batch quality to release names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to prepare batch reviews and guide people to the right records.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Agree product codes, specifications, equipment and supplier records with the people who maintain them.
Create a batch for one product with a clear number, quantity, line, site and dates.
Record test outcomes, one investigated exception and a linked corrective action.
Review the batch with QA Manager and Qualified Person, including a Hold case.
Record the release decision, mark the reviewed batch Approved, then compare its Released status and operation receipt with that decision.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure ERP + Quality for Pharma for your business. Begin with one product, its specification and a representative batch.
The batch has a Product reference and its own batch number, quantity, dates, line, site and lifecycle status.
Quality specifications hold the product, test parameter, acceptance criteria, limits, effective date and version label.
QC Analyst enters a test results record for the batch with the observed value or text, outcome and analyst note.
QA Manager can open a deviation against the batch, record the investigation and link corrective action to it.
The action record holds the plan, owner name, due date, completion date and effectiveness check result. QA Manager reviews its status during batch quality review.
Equipment records show calibration status, last calibration date, next due date and qualification status. The Quality Exceptions & CAPA page also brings out-of-calibration equipment into view.
A change controls record can reference a supplier and carries the impact assessment, filing requirement and approval status.
Qualified Person records the independent release decision with its review stage, decision, reviewer and rationale. QA Manager marks the reviewed batch Approved only after a Release decision; the workflow posts every Approved batch.
Operation receipts record the performed batch release operation, its date, outcome, detail and evidence link. Review it with the batch and human decision.
Start free, then use Proto to change fields, steps and approvals before your team goes live.