Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Manufacturing CRM
- Engineering review system
- Document repository
- Quoting and ERP system
- Mail and calendar service
Manufacturing CRM runs customer opportunities from a new sales record through qualification, engineering feasibility and a reviewed customer outcome. Manufacturing sales leaders use it to connect the expected purchasing decision with the drawing and material request their team considered.
Opportunities in one list
An eligible independent Sales Manager approves or rejects the exact submitted engineering revision.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep customer companies and team membership aligned with the organization that owns each manufacturing opportunity.
Accounts
| Name | Code | Contact name | Address | Eligibility note | Organization | |
|---|---|---|---|---|---|---|
| Cedar Brook Pumps | CBP-041 | Irene Castillo | 118 Foundry Lane, Toledo, OH | Credit terms approved for tooling | Cedarline Fabrication Co. | |
| Northvale Devices | NVD-108 | Noah Banerjee | 740 Cedar Road, Akron, OH | Prototype NDA signed | Riverforge Industrial Co. | |
| Harbor Ridge Works | HRW-215 | Salma Kim | 90 Harbor Way, Erie, PA | Requires first article inspection | Riverforge Industrial Co. | |
| Pinecrest Mobility | PCM-072 | Victor Mensah | 320 Ridge Street, Dayton, OH | Customer drawing portal access active | Hollow Ridge Machine Works | |
| Blue Marsh Equipment | BME-126 | Lucia Rahman | 62 Marsh Drive, Madison, WI | Material source approval pending | Northbank Metalcraft |
Work manufacturing sales opportunities using the customer, accountable owner, expected close date and current revision.
Qualified waits for the relationship owner
| Record number | Subject | Counterparty | Owner | Expected close date | Expected value USD | |
|---|---|---|---|---|---|---|
| OPP-60414 | Cedar Brook Pumps, valve housings | Rivergate Tools | Owen Patel | 28 Nov | 850 | |
| OPP-51841 | Northvale Devices, sensor brackets | Harbor Ridge Works | Marco Ibarra | 18 Nov | 780 | |
| OPP-67799 | Harbor Ridge Works, cast fittings | Blue Marsh Equipment | Elias Tan | 15 Nov | 590 | |
| OPP-66710 | Pinecrest Mobility, frame assemblies | Harbor Ridge Works | Elias Tan | 13 Nov | 540 | |
| OPP-13043 | Blue Marsh Equipment, gear covers | Pinecrest Mobility | Samir Desai | 08 Nov | 920 |
Submit the drawing revision, material specification and annual quantity for an independent feasibility decision.
Approval conditions
| Parent | Organization | Drawing revision | Material specification | Annual quantity | Technical review due | |
|---|---|---|---|---|---|---|
| Cedar Brook Pumps, valve housings | Meadowline Assemblies | Drawing VH-44 rev C | 6061-T6 aluminum plate | 620 | 11 Nov | |
| Rivergate Tools, precision pins | Stone Willow Manufacturing | Drawing SB-18 rev D | 304 stainless steel sheet | 860 | 14 Nov | |
| Northvale Devices, sensor brackets | Cedarline Fabrication Co. | Drawing CF-71 rev B | A356 cast aluminum | 490 | 10 Nov | |
| Cedar Brook Pumps, valve housings | Cedarline Fabrication Co. | Drawing FA-09 rev F | 1018 cold rolled steel | 390 | 25 Nov | |
| Blue Marsh Equipment, gear covers | Ironcrest Precision Works | Drawing GC-32 rev A | Glass-filled nylon, 30% | 710 | 19 Nov |
Keep the customer conversation, follow-up dates and supporting files linked to the opportunity being reviewed.
Relationship activities
| Parent | Line number | Revision | Activity type | Due at | Completed at | |
|---|---|---|---|---|---|---|
| Rivergate Tools, precision pins | 530 | 580 | Call | 11 Nov | 15 Nov | |
| Rivergate Tools, precision pins | 760 | 610 | Meeting | 16 Nov | 17 Nov | |
| Harbor Ridge Works, cast fittings | 120 | 810 | 06 Nov | 10 Nov | ||
| Stonefield Ag, conveyor supports | 130 | 730 | Task | 07 Nov | 12 Nov | |
| Willow Bend Energy, pipe clamps | 610 | 540 | Call | 08 Nov | 11 Nov |
Review the exact proposal revision and verified customer acceptance or loss before recording the deal outcome.
Review decisions
| Parent | Source revision | Reviewer | Decision | Decided at | Reason | |
|---|---|---|---|---|---|---|
| Cedar Brook Pumps, valve housings | 460 | Marco Ibarra | Return | 21 Nov | Tolerance stack verified by engineering | |
| Blue Marsh Equipment, gear covers | 70 | Maya Haddad | Return | 25 Nov | Material grade needs confirmation | |
| Blue Marsh Equipment, gear covers | 560 | Camila Okafor | Return | 29 Nov | Quote margin approved | |
| Stonefield Ag, conveyor supports | 850 | Maya Haddad | Return | 14 Nov | Tooling cost requires revision | |
| Rivergate Tools, precision pins | 650 | Leena Voss | Return | 26 Nov | Sample results support production |
Correct or cancel the authorized scope while retaining its earlier decisions and any executed effects.
Team members
| Name | User | Organization | Active | Role name | Time zone | |
|---|---|---|---|---|---|---|
| Ada Velasquez | Jin Alvarez | Hollow Ridge Machine Works | Account manager | America/New_York | ||
| Farid Nwosu | Aisha Moreno | Riverforge Industrial Co. | Applications engineer | America/Chicago | ||
| Mika Chen | Owen Patel | Blue Quarry Components | Sales operations lead | America/Denver | ||
| Luis Kaur | Maya Haddad | Stone Willow Manufacturing | Quote reviewer | America/Los_Angeles | ||
| Nina Salcedo | Jin Alvarez | Hollow Ridge Machine Works | Customer quality liaison | America/Phoenix |
Match each guarded action to the expected revision and supporting effect evidence before accepting completion.
Operation receipts
| Parent | Operation key | Action | Expected revision | Result state | Occurred at | |
|---|---|---|---|---|---|---|
| Willow Bend Energy, pipe clamps | review-valve-1015 | Submit feasibility review | 790 | Pending | 24 Nov | |
| Stonefield Ag, conveyor supports | quote-sensor-1015 | Approve revised quote | 690 | Needs review | 13 Nov | |
| Northvale Devices, sensor brackets | attach-casting-1016 | Attach drawing evidence | 80 | Pending | 08 Nov | |
| Cedar Brook Pumps, valve housings | approve-frame-1016 | Request sample inspection | 350 | Needs review | 07 Nov | |
| Blue Marsh Equipment, gear covers | sample-gear-1017 | Record customer decision | 870 | Pending | 20 Nov |
Manufacturing opportunity to verified outcome ships ready to use. 3 steps need a named approval before the work moves on: Engineering review (Sales Manager), Proposal review (Sales Manager) and Customer outcome (Sales Manager).
Start with the customer company, responsible owner and expected purchasing decision.
Use existing customer evidence to establish which requests belong in the qualified pipeline.
Review the submitted drawing and material scope before carrying the request forward.
Give the independent reviewer the current proposal scope and supporting customer context.
Record the verified customer answer with the review evidence that supports the close.
Compare the recorded action with its actual effect and keep uncertain results visible.
Open any opportunity to see its engineering inquiries, the roles that work on it, its process stages and its approvals on one page.
Counterparty, Expected close date, Expected value USD and Revision.
Each line is linked to this opportunity.
Auditor, Sales Manager and Relationship Owner, each with their own permissions.
Opportunity capture and Activity and evidence, with the role that acts.
Engineering review and Proposal review, with who decides.
Pinecrest Mobility · New
| Parent | Drawing revision | Material specification |
|---|---|---|
| Stonefield Ag, conveyor supports | Drawing VH-44 rev C | 6061-T6 aluminum plate |
| Stonefield Ag, conveyor supports | Drawing SB-18 rev D | 304 stainless steel sheet |
| Pinecrest Mobility, frame assemblies | Drawing CF-71 rev B | A356 cast aluminum |
Signed in as Sales Manager
| Decision | Approver | |
|---|---|---|
| Engineering reviewReview the submitted drawing and material scope before carrying the request forward. | Sales Manager | |
| Proposal reviewGive the independent reviewer the current proposal scope and supporting customer context. | Sales Manager | |
| Customer outcomeRecord the verified customer answer with the review evidence that supports the close. | Sales Manager |
Everyone opens Manufacturing CRM to the work that is theirs. Pick a role to see what it starts with.
Read authorized evidence and reports.
This is the first screen this role sees.
Engineering inquiries · Auditor
| Parent | Organization | Drawing revision | Material specification | Annual quantity | Technical review due | |
|---|---|---|---|---|---|---|
| Cedar Brook Pumps, valve housings | Meadowline Assemblies | Drawing VH-44 rev C | 6061-T6 aluminum plate | 620 | 11 Nov | |
| Rivergate Tools, precision pins | Stone Willow Manufacturing | Drawing SB-18 rev D | 304 stainless steel sheet | 860 | 14 Nov | |
| Northvale Devices, sensor brackets | Cedarline Fabrication Co. | Drawing CF-71 rev B | A356 cast aluminum | 490 | 10 Nov | |
| Cedar Brook Pumps, valve housings | Cedarline Fabrication Co. | Drawing FA-09 rev F | 1018 cold rolled steel | 390 | 25 Nov | |
| Blue Marsh Equipment, gear covers | Ironcrest Precision Works | Drawing GC-32 rev A | Glass-filled nylon, 30% | 710 | 19 Nov |
Maintain organization configuration and membership.
This is the first screen this role sees.
Accounts · App Administrator
| Name | Code | Contact name | Address | Eligibility note | Organization | |
|---|---|---|---|---|---|---|
| Cedar Brook Pumps | CBP-041 | Irene Castillo | 118 Foundry Lane, Toledo, OH | Credit terms approved for tooling | Cedarline Fabrication Co. | |
| Northvale Devices | NVD-108 | Noah Banerjee | 740 Cedar Road, Akron, OH | Prototype NDA signed | Riverforge Industrial Co. | |
| Harbor Ridge Works | HRW-215 | Salma Kim | 90 Harbor Way, Erie, PA | Requires first article inspection | Riverforge Industrial Co. | |
| Pinecrest Mobility | PCM-072 | Victor Mensah | 320 Ridge Street, Dayton, OH | Customer drawing portal access active | Hollow Ridge Machine Works | |
| Blue Marsh Equipment | BME-126 | Lucia Rahman | 62 Marsh Drive, Madison, WI | Material source approval pending | Northbank Metalcraft |
Review eligible revisions independently and reconcile operational evidence.
This is the first screen this role sees.
Engineering inquiries · Sales Manager
| Parent | Drawing revision | Material specification | Annual quantity | Technical review due | Status | |
|---|---|---|---|---|---|---|
| Stonefield Ag, conveyor supports | Drawing VH-44 rev C | 6061-T6 aluminum plate | 210 | 09 Nov | Draft | |
| Stonefield Ag, conveyor supports | Drawing SB-18 rev D | 304 stainless steel sheet | 850 | 15 Nov | Draft | |
| Pinecrest Mobility, frame assemblies | Drawing CF-71 rev B | A356 cast aluminum | 950 | 24 Nov | Draft | |
| Cedar Brook Pumps, valve housings | Drawing FA-09 rev F | 1018 cold rolled steel | 300 | 28 Nov | Draft | |
| Blue Marsh Equipment, gear covers | Drawing GC-32 rev A | Glass-filled nylon, 30% | 860 | 23 Nov | Draft |
Prepare assigned operational records and execute eligible reviewed actions.
This is the first screen this role sees.
Engineering inquiries · Relationship Owner
| Parent | Drawing revision | Material specification | Annual quantity | Technical review due | Status | |
|---|---|---|---|---|---|---|
| Stonefield Ag, conveyor supports | Drawing VH-44 rev C | 6061-T6 aluminum plate | 210 | 09 Nov | Draft | |
| Stonefield Ag, conveyor supports | Drawing SB-18 rev D | 304 stainless steel sheet | 850 | 15 Nov | Draft | |
| Pinecrest Mobility, frame assemblies | Drawing CF-71 rev B | A356 cast aluminum | 950 | 24 Nov | Draft | |
| Cedar Brook Pumps, valve housings | Drawing FA-09 rev F | 1018 cold rolled steel | 300 | 28 Nov | Draft | |
| Blue Marsh Equipment, gear covers | Drawing GC-32 rev A | Glass-filled nylon, 30% | 860 | 23 Nov | Draft |
Maintains user access and investigates configuration without replacing independent business decisions.
Read current pipeline estimates, engineering review work and unresolved operation evidence.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| New | 38 | ||
| Qualified | 15 | 39% | |
| Proposal | 4 | 27% | |
| Negotiation | 2 | 50% |
Sample totals per stage
Which open opportunities carry expected USD value, and what probability information is actually recorded?
Which customer company and organization own the opportunity context?
Which submitted or approved requests need attention against their technical review date?
What customer discussion or task outcome explains the next action?
Which customer evidence supports Won or Lost, and what expected value was retained?
Does the independent decision cover the revision currently being considered?
Which receipt is unresolved, failed or supported by matching effect evidence?
Which attachment classification and uploader explain access to the supporting file?
See how Manufacturing CRM fits your kind of team.
Coordinate customer opportunities where a drawing revision and material requirement determine the commercial discussion.
Preserve customer scope, independent review and correction evidence when fabricated work changes during the sales cycle.
Review technical requirements and customer decisions on equipment opportunities without confusing sales estimates with execution results.
Each stage of manufacturing opportunity to verified outcome names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Prepare customer evidence and investigate review exceptions with Proto while retaining human decision authority.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 10 tablesStart with one team and one process, then add the rest once the basics are running.
Start with customer companies, opportunity stages and engineering feasibility scope. Identify any external quoting, production or accounting responsibility before designing a handoff.
Resolve business entities, user identities, team membership and customer companies before loading opportunities. Preserve drawing references, source revisions and operation keys with their evidence.
Set up the work screens and user administration for the pilot. Give the eligible Sales Manager reviewer a controlled, authorized decision action. Enforce live membership, current-revision and independent-review checks.
Qualify a supported request, submit a drawing inquiry and review proposal scope. Include owner self-review, a stale revision, a changed drawing and a repeated operation key. Test verified acceptance and a loss with its reason.
Check that unresolved handoffs remain Pending or Needs review, and that an inquiry completes only with real external evidence. Compare the migrated records with their source, obtain the business owner’s acceptance and release the reviewed configuration.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Manufacturing CRM for your business. Pilot a customer opportunity with a verifiable drawing request, an accountable Relationship Owner and an independent Sales Manager. Rehearse qualification, changed scope and a customer outcome before expanding the team.
Keep the company name, stable company code and main contact together with the address, eligibility note and owning organization. App Administrator maintains this context. Agree who verifies changed contact details and whether the company remains active before preparing another opportunity.
Each engineering inquiry retains the drawing reference and submitted revision with the material requirement. Freeze that scope for review. A changed drawing needs current review coverage; an earlier decision cannot authorize a different revision merely because it belongs to the same opportunity.
An eligible Sales Manager reviews the submitted revision through an authorized action. The preparer cannot approve their own work. Configure decision execution explicitly: a visible queue alone does not grant permission to write a decision.
Approved records the review outcome. Completed requires evidence of the real external effect agreed during setup. A timeout or missing acknowledgment remains unresolved until its actual result can be verified.
Configure a quoting or ERP connection when that system owns the commercial document. Retain its current reviewed reference and supporting evidence with the opportunity. The Sales Manager can then check which document supports the submitted scope before making the decision.
Relationship Owner submits verified acceptance or loss evidence for independent review of the exact revision. Won requires win date and Lost requires loss reason. Earlier customer activity and expected USD sales value remain available; the estimate does not become recognized revenue.
The correction action distinguishes unexecuted scope from executed effects. It retains the reason and earlier records. Executed scope needs independently reviewed compensation, with the receipt Pending until downstream confirmation establishes the result.
Configure the provider connection with matching, private-content rules and duplicate handling. Agree how an imported conversation is associated with the customer opportunity, then rehearse a repeated provider event and a private thread before enabling the connection.
Use the pricing page for the platform's manual-use and machine-work policy. Estimate imports, agent requests and connected actions for the pilot; implementation and migration are priced separately under that policy.
Start free, then use Proto to change fields, steps and approvals before your team goes live.