Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Manufacturing TMS
- Production and purchasing
- Warehouse and customer orders
- Driver and telematics providers
- Finance
TMS for Manufacturing runs the transport work around inbound materials, inter-plant movements and outbound finished goods. Loads hold the item code, lane, requested units, transport partner and delivery promise.
Approval conditions
| Record number | Subject | Item code | Lane | Requested units | Planned departure | |
|---|---|---|---|---|---|---|
| LDS-23749 | Pressed housings to assembly plant | HSG-450-A | North plant to east assembly | 20 | 08 Nov | |
| LDS-27273 | Steel coil transfer to east plant | COIL-CR-12 | Steel yard to east plant | 70 | 17 Nov | |
| LDS-23242 | Finished pump units to regional depot | PUMP-620-M | North plant to regional depot | 130 | 26 Nov | |
| LDS-84954 | Cast brackets to finishing shop | BRKT-88-C | Foundry to finishing shop | 40 | 19 Nov | |
| LDS-26629 | Machined shafts to test facility | SHAFT-310-L | Machine shop to test facility | 660 | 09 Nov |
Transport Planner approves the current transport requirement before marking the load Planned.
Every feature works on the same records. Pick one to see the screen your team works in.
Prepare the load, transport partner and stop sequence before committing the trip.
Loads
| Record number | Subject | Owner | Lane | Planned departure | Promised delivery at | |
|---|---|---|---|---|---|---|
| LDS-78342 | Pressed housings to assembly plant | Bruno Mendes | North plant to east assembly | 10 Nov | 17 Nov | |
| LDS-41808 | Steel coil transfer to east plant | Jonas Becker | Steel yard to east plant | 26 Nov | 01 Dec | |
| LDS-56875 | Finished pump units to regional depot | Chloe Farah | North plant to regional depot | 09 Nov | 13 Nov | |
| LDS-16867 | Cast brackets to finishing shop | Bruno Mendes | Foundry to finishing shop | 28 Nov | 30 Nov | |
| LDS-96455 | Machined shafts to test facility | Jonas Becker | Machine shop to test facility | 19 Nov | 24 Nov |
Review the requested dock reservation against pallet capacity before confirming the appointment.
Approval conditions
| Appointment number | Plant | Dock | Appointment at | Planned pallets | Dock capacity pallets | |
|---|---|---|---|---|---|---|
| PA-85317 | North Assembly Plant | Dock 4, north plant | 06 Nov | 870 | 680 | |
| PA-99512 | East Components Plant | Dock 2, east plant | 09 Nov | 550 | 460 | |
| PA-86214 | South Packaging Plant | Dock 6, south plant | 29 Nov | 760 | 230 | |
| PA-24170 | West Motor Plant | Dock 3, west plant | 14 Nov | 960 | 110 | |
| PA-87588 | Linden Finishing Works | Bay 1, finishing shop | 05 Nov | 400 | 480 |
Connect each load to its driver and vehicle, then review reported transport milestones.
Vehicles
| Vehicle code | Name | Equipment class | Plate | Active | Readiness | |
|---|---|---|---|---|---|---|
| TR-014 | Tractor 14, plant shuttle | Truck | NV 8KJ421 | Active | Ready | |
| FB-006 | Flatbed trailer 06 | Trailer | OR 6LM802 | Inactive | In Service | |
| BX-009 | Box truck 09, parts route | Van | WA 4PN615 | Active | Maintenance | |
| TR-021 | Tractor 21, regional haul | Bus | ID 7RC203 | Inactive | Held | |
| DV-012 | Dry van trailer 12 | Car | CA 9VD118 | Active | Ready |
Capture the receiving evidence and verify it against the intended load and stop.
Proof of delivery
Review driver eligibility, equipment condition and due service before assigning the next trip.
Fuel transactions
| Transaction number | Vehicle | Occurred at | Fuel type | Volume | Unit cost | |
|---|---|---|---|---|---|---|
| FT-69672 | Tractor 21, regional haul | 15 Nov | Diesel | 200 | 840 | |
| FT-63178 | Flatbed trailer 06 | 07 Nov | Gasoline | 660 | 160 | |
| FT-71673 | Dry van trailer 12 | 11 Nov | DEF | 720 | 30 | |
| FT-41194 | Box truck 17, service parts | 17 Nov | CNG | 40 | 960 | |
| FT-77715 | Tractor 14, plant shuttle | 09 Nov | Electric | 790 | 600 |
Review load charges and resolve uncertain operational outcomes with their original evidence.
Operation receipts
| Receipt number | Subject | Action | Occurred at | External reference | Owner | |
|---|---|---|---|---|---|---|
| OR-56988 | Steel coils checked in at east plant | Check-in inbound trailer | 06 Nov | BOL-2026-5181 | Hector Ruiz | |
| OR-48679 | Pump units loaded at north plant | Release dock appointment | 18 Nov | ASN-2026-7732 | Ishani Rao | |
| OR-46488 | Dock slot released for trailer 12 | Dispatch plant shuttle | 29 Nov | POD-2026-1120 | Damon Lee | |
| OR-68088 | Motor shipment dispatched west | Record delivered quantity | 15 Nov | INV-2026-0448 | Femi Okoro | |
| OR-82015 | Brackets received at finishing shop | Post freight charge | 21 Nov | SEAL-2026-9821 | Esra Yilmaz |
Load planning to verified delivery ships ready to use. 2 steps need a named approval before the work moves on: Plan load (Transport Planner) and Dock review (Dock Reviewer).
Prepare the quantity, stops and receiving promise for the transport plan.
Compare the requested pallets with the plant dock capacity.
Confirm the resources and follow the reported journey.
Record the receiving time, person and signature reference.
Check the evidence against the intended load and stop.
Resolve outstanding outcomes with the responsible operating team.
Open any load to see its freight charges, the roles that work on it, its process stages and its approvals on one page.
Item code, Lane, Requested units and Planned departure.
Each line is linked to this load.
Transport Planner, Dispatcher and Dock Reviewer, each with their own permissions.
Establish operating scope and Plan load, with the role that acts.
Plan load and Dock review, with who decides.
HSG-450-A · Draft
| Charge number | Load | Charge type |
|---|---|---|
| FC-20551 | Cast brackets to finishing shop | Linehaul |
| FC-25994 | Replacement motors to west plant | Fuel Surcharge |
| FC-95458 | Machined shafts to test facility | Accessorial |
Signed in as Transport Planner
| Decision | Approver | |
|---|---|---|
| Plan loadPrepare the quantity, stops and receiving promise for the transport plan. | Transport Planner | |
| Dock reviewCompare the requested pallets with the plant dock capacity. | Dock Reviewer | |
| Approve Loads | Transport Planner | |
| Approve plant appointments | Dock Reviewer | |
| Approve freight charges | Freight Analyst |
Everyone opens Manufacturing TMS to the work that is theirs. Pick a role to see what it starts with.
Owns load preparation and the planning decision.
This is the first screen this role sees.
Loads · Transport Planner
| Record number | Subject | Item code | Lane | Requested units | Planned departure | |
|---|---|---|---|---|---|---|
| LDS-23749 | Pressed housings to assembly plant | HSG-450-A | North plant to east assembly | 20 | 08 Nov | |
| LDS-27273 | Steel coil transfer to east plant | COIL-CR-12 | Steel yard to east plant | 70 | 17 Nov | |
| LDS-23242 | Finished pump units to regional depot | PUMP-620-M | North plant to regional depot | 130 | 26 Nov | |
| LDS-84954 | Cast brackets to finishing shop | BRKT-88-C | Foundry to finishing shop | 40 | 19 Nov | |
| LDS-26629 | Machined shafts to test facility | SHAFT-310-L | Machine shop to test facility | 660 | 09 Nov |
Coordinates assignments, dock submissions and transport milestones.
This is the first screen this role sees.
Loads · Dispatcher
| Record number | Subject | Item code | Lane | Requested units | Planned departure | |
|---|---|---|---|---|---|---|
| LDS-23749 | Pressed housings to assembly plant | HSG-450-A | North plant to east assembly | 20 | 08 Nov | |
| LDS-27273 | Steel coil transfer to east plant | COIL-CR-12 | Steel yard to east plant | 70 | 17 Nov | |
| LDS-23242 | Finished pump units to regional depot | PUMP-620-M | North plant to regional depot | 130 | 26 Nov | |
| LDS-84954 | Cast brackets to finishing shop | BRKT-88-C | Foundry to finishing shop | 40 | 19 Nov | |
| LDS-26629 | Machined shafts to test facility | SHAFT-310-L | Machine shop to test facility | 660 | 09 Nov |
Independently decides submitted dock reservations against their capacity evidence.
This is the first screen this role sees.
Plant appointments · Dock Reviewer
| Appointment number | Plant | Dock | Appointment at | Planned pallets | Dock capacity pallets | |
|---|---|---|---|---|---|---|
| PA-85317 | North Assembly Plant | Dock 4, north plant | 06 Nov | 870 | 680 | |
| PA-99512 | East Components Plant | Dock 2, east plant | 09 Nov | 550 | 460 | |
| PA-86214 | South Packaging Plant | Dock 6, south plant | 29 Nov | 760 | 230 | |
| PA-24170 | West Motor Plant | Dock 3, west plant | 14 Nov | 960 | 110 | |
| PA-87588 | Linden Finishing Works | Bay 1, finishing shop | 05 Nov | 400 | 480 |
Captures and verifies delivery evidence against the load and its stop.
This is the first screen this role sees.
Tracking events · Delivery Coordinator
Maintains driver eligibility and vehicle service readiness.
This is the first screen this role sees.
Load assignments · Fleet Coordinator
Reviews freight charges and reconciles operational results.
This is the first screen this role sees.
Proof of delivery · Freight Analyst
Configures access and organization reference data with the operating owners.
Compare delivery evidence, dock requests and freight amounts using a consistent review basis.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 24 | ||
| Planned | 12 | 50% | |
| Dispatched | 5 | 42% | |
| Delivered | 2 | 40% |
Sample totals per stage
Which loads remain in planning or exception, and what item quantities do they represent?
Which appointment requests need attention when planned pallets are compared with the stated dock capacity?
How does each verified delivery time compare with the promise for its load?
Which amounts remain in draft review, and which are approved, invoiced or paid?
Which delay and exception events need investigation, and who supplied the account?
Which vehicles have active, unfinished service due today or earlier, or defects marked Open, In Repair or Deferred?
What purchases belong to each asset within an agreed unit and monetary basis?
Which actions remain pending, failed or in need of review?
See how Manufacturing TMS fits your kind of team.
Coordinate supplier loads with a reviewed plant dock reservation and receiving evidence.
Keep the sending load, receiving appointment and transport evidence aligned across plants.
Follow outbound loads through dispatch, receiving verification and freight review.
Each stage of load planning to verified delivery names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to prepare transport reviews and investigate the evidence behind an exception.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 21 tablesStart with one team and one process, then add the rest once the basics are running.
Select the pilot plant, recurring lane and receiving contact. Name the Transport Planner and Dispatcher, then agree the independent Dock Reviewer and the owners of equipment, delivery and freight review.
Resolve organizations, staff, transport partners, drivers and vehicles before importing loads. Check the stop sequence, item quantity convention and document references with the people who will use them.
Agree load planning decisions, dock capacity interpretation and the driver availability check. Configure role access and review how assignment, appointment and load progress are recorded separately.
Submit an over-capacity dock request, change equipment after a defect, and capture a delivery document with the wrong load reference. Have the responsible roles resolve each case while retaining the earlier evidence.
Compare imported records and open commitments with the source. Review operation receipts, decision revisions and freight amounts by currency. Obtain operating-owner acceptance before beginning the next transport cycle.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure TMS for Manufacturing for your business. Begin with a plant and recurring lane, import the current loads and agree the dock reviewer. Rehearse the trip through delivery verification and freight review before expanding.
The appointment references its parent load and records the plant, dock, appointment time and planned pallets. It has its own review and completion progress. Approval confirms the reservation while the Dispatcher continues to record the load's actual transport progress.
Dock Reviewer independently compares the submitted reservation with the published dock capacity and capacity note. The reviewer records an approval or rejection against the request revision, with its decision time and supporting review evidence.
The reviewer rejects an unsuitable request with a reason. Dispatcher works with the plant on a suitable reservation and prepares the corrected request for review. Keep the earlier decision understandable when comparing it with the revision that follows.
Fleet Coordinator reviews the defect or service issue with Dispatcher. Dispatcher updates the assignment to the agreed driver and vehicle, records the availability check and reviews the effect on the load and plant appointment before departure.
Staff can record events with their source, location and occurrence time. Driver-app, partner or telematics feeds need a configured connection and a tested mapping to the correct load. Confirm reported milestones against their evidence when resolving a discrepancy.
Delivery Coordinator checks the receiving time, person and signature reference against the intended load and stop. A matching account can become Verified. Conflicting evidence remains Disputed while the responsible people investigate the document and journey.
Freight charges can identify detention, layover, fuel surcharge and other supported charge types against a load. Freight Analyst reviews the amount and currency with its evidence. Vehicle fuel purchases have their own records and should be compared within an agreed unit and monetary basis.
Agree the connections needed for production demand, warehouse or customer-order handoffs, external tracking and finance. Each source needs a mapping, responsible owner and tested handling for repeated or uncertain messages. Begin with the connections required by the pilot lane.
Ordinary manual work and machine activity follow the platform's published pricing policy, with implementation scoped separately. Review the pricing page and estimate the pilot's imports, agent activity and retained data with the implementation team.
Start free, then use Proto to change fields, steps and approvals before your team goes live.