Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Asset Tracking
- Equipment and finance registers
- Meter-reading sources
- Purchasing systems
- Employee identity sources
Asset Tracking identifies physical equipment by asset tag, name and serial number, with a home location and operating state. Asset Manager maintains the register while Maintenance Planner records preventive intervals and upcoming service dates.
Tracked assets in one list
Maintenance Approver authorizes eligible work after the command verifies the ticket, asset and approved coverage spanning today.
Every feature works on the same records. Pick one to see the screen your team works in.
Identify equipment by its tag and serial number, then follow its operating state and maintenance history.
Tracked assets
| Asset tag | Name | Home location | Serial number | Status | |
|---|---|---|---|---|---|
| FL-003 | Forklift 3 | North dock | TA-61528 | Active | |
| PJ-012 | North dock pallet jack | Packaging line 2 | TA-89783 | Active | |
| CV-002 | Packaging line conveyor 2 | Receiving bay | TA-30872 | Active | |
| SC-001 | Receiving bay scale | Cold room plant | TA-67008 | Active | |
| SL-004 | East aisle scissor lift | East aisle | TA-83027 | Active |
Record the service interval and next due date against the asset the team will maintain.
Maintenance schedules
| Tracked asset | Interval days | Interval hours | Last serviced at | Next due at | |
|---|---|---|---|---|---|
| Forklift 3 | 2 | 15 | 13 Oct | 21 Oct | |
| Label printer, pack station 6 | 8 | 11 | 12 Oct | 17 Oct | |
| Packaging line conveyor 2 | 10 | 7 | 11 Oct | 13 Oct | |
| Forklift 3 | 20 | 10 | 22 Oct | 25 Oct | |
| Packaging line conveyor 2 | 7 | 13 | 31 Oct | 30 Oct |
Record asset usage with its unit and action limit, then review equipment flagged for maintenance.
Asset usage meters
| Tracked asset | Reading at | Meter type | Reading | Unit | Action limit | |
|---|---|---|---|---|---|---|
| Forklift 3 | 23 Oct | Engine hours | 260 | hours | 350 | |
| Label printer, pack station 6 | 16 Oct | Operating hours | 560 | kilometers | 120 | |
| Receiving bay scale | 13 Oct | Distance traveled | 200 | cycles | 590 | |
| Label printer, pack station 6 | 11 Oct | Lift cycles | 230 | pieces | 510 | |
| East aisle scissor lift | 13 Oct | Generator run hours | 680 | liters | 650 |
Authorize eligible work, record the technician's activity and inspect the result before returning equipment to service.
Maintenance tickets
| Id | Tracked asset | Ticket type | Description | Completed at | Status | |
|---|---|---|---|---|---|---|
| MT-2026-0412 | North dock pallet jack | Preventive | Hydraulic hose leaking at mast | Closed | ||
| MT-2026-0413 | Packaging line conveyor 2 | Corrective | Drive belt slipping under load | Closed | ||
| MT-2026-0414 | Packaging line conveyor 2 | Inspection | Scale reading high by 0.4 kg | Closed | ||
| MT-2026-0415 | East aisle scissor lift | Preventive | Generator due for oil change | Closed | ||
| MT-2026-0416 | Receiving bay scale | Corrective | Steering wheel binds on turns | Closed |
Post spare-part consumption against the maintenance ticket and review stock that reaches its reorder point.
Spare parts
| Part number | Name | Unit | Quantity on hand | Reorder point | |
|---|---|---|---|---|---|
| SP-98101 | Hydraulic hose, 3/8 inch | hours | 640 | 610 | |
| SP-68468 | Conveyor drive belt, 2 meter | kilometers | 840 | 230 | |
| SP-83926 | Forklift air filter | cycles | 510 | 940 | |
| SP-83449 | Thermal label roll, 4 inch | pieces | 300 | 540 | |
| SP-50547 | Pallet jack wheel kit | liters | 200 | 50 |
Check approved coverage dates before authorizing work and retain the outcome accepted for each serviced asset.
Warranty information
| Maintenance ticket | Warranty type | Start date | End date | Status | Issued by | |
|---|---|---|---|---|---|---|
| Check van 4 brake pads | Parts and labor | 20 Oct | 28 Oct | Approved | Malik Bennett | |
| Replace scissor lift battery | Manufacturer limited | 13 Oct | 18 Oct | Approved | Maya Desai | |
| Replace Forklift 3 hydraulic hose | Extended service | 12 Oct | 18 Oct | Approved | Arun Mehta | |
| Service cold room generator | Powertrain coverage | 16 Oct | 23 Oct | Approved | Arun Mehta | |
| Calibrate receiving bay scale | Battery replacement | 14 Oct | 22 Oct | Approved | Elena Ruiz |
From asset identification to accepted service ships ready to use. 2 steps need a named approval before the work moves on: Authorize maintenance (Maintenance Approver) and Accept inspection (Maintenance Approver).
Identify the equipment by tag and serial number, with its home location and operating state.
Record service intervals and dates, then prepare the work required for the asset.
Check the ticket and current approved warranty before assigning authorized work.
Start the maintenance ticket and retain the technician's work evidence.
Post the consumed quantity once and review stock reaching its reorder point.
Review the completed service before closing the ticket and returning the asset to Active.
Open any tracked asset to see its asset usage meters, the roles that work on it, its process stages and its approvals on one page.
Name, Home location, Manufacturer and Commissioned at.
Each line is linked to this tracked asset.
Asset Manager, Maintenance Planner and Technician, each with their own permissions.
Register assets and Plan maintenance, with the role that acts.
Authorize maintenance and Accept inspection, with who decides.
Forklift 3 · Active
| Tracked asset | Reading at | Meter type |
|---|---|---|
| Packaging line conveyor 2 | 01 Nov | Engine hours |
| Label printer, pack station 6 | 12 Oct | Operating hours |
| Forklift 3 | 20 Oct | Distance traveled |
Review coverage eligibility, authorize work and accept its inspection through the agreed commands.
Signed in as Maintenance Approver
| Decision | Approver | |
|---|---|---|
| Authorize maintenanceCheck the ticket and current approved warranty before assigning authorized work. | Maintenance Approver | |
| Accept inspectionReview the completed service before closing the ticket and returning the asset to Active. | Maintenance Approver | |
| Approve warranty information, maintenance tickets | Maintenance Approver |
Everyone opens Asset Tracking to the work that is theirs. Pick a role to see what it starts with.
Maintains equipment identity, home location and operating state, and reviews accepted service history.
This is the first screen this role sees.
Tracked assets · Asset Manager
Prepares preventive plans and maintenance requests with the assigned technician and due date.
This is the first screen this role sees.
Tracked assets · Maintenance Planner
Captures asset readings and work evidence and submits completed maintenance for inspection through the authorized commands.
This is the first screen this role sees.
Tracked assets · Technician
Reviews warranty eligibility, authorizes maintenance and accepts completed work for return to service.
This is the first screen this role sees.
Tracked assets · Maintenance Approver
Maintains spare-part records and posts ticket-linked consumption through the controlled usage command.
This is the first screen this role sees.
Maintenance tickets · Parts Coordinator
Maintains employee-to-user mappings and the access configuration agreed for the operating team.
Review upcoming service, maintenance work and the stock and coverage decisions behind each ticket.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Active | 47 | ||
| Maintenance | 24 | 51% | |
| Out of service | 17 | 71% | |
| Retired | 11 | 65% |
Sample counts per stage
Which identified equipment is Active, under maintenance or out of service in each home location?
Which service plans need a planning decision based on the next due date and last recorded service?
Which comparable meter readings are approaching or reaching their action limits?
Which technicians have work waiting, in progress or awaiting inspection?
List maintenance logs by Technician and maintenance ticket with started at, ended at and work performed; date fields do not establish precise labor hours.
Group part usage by maintenance ticket and Part with Quantity and used at, interpreting quantities in the part's Unit.
Which part balances require replenishment attention against their reorder points?
Which ticket-linked coverage records are approved and valid for the operating date?
What result was retained for an asset after its maintenance inspection was accepted?
See how Asset Tracking fits your kind of team.
Keep similar equipment distinguishable and coordinate the maintenance work that determines its operating state.
Review preventive service and usage limits for the equipment supporting daily production work.
Coordinate assigned technicians, current warranty coverage and the evidence retained after accepted service.
Each stage, from asset identification to accepted service, names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to prepare maintenance reviews while people retain responsibility for equipment identity and acceptance.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
Start with tagged assets the operating team can identify physically. Agree names and home locations, then check serial numbers against the register. Select a service case suitable for a complete rehearsal.
Have Admin confirm employee-to-user mappings. Name the planner, Technician, Maintenance Approver and Parts Coordinator for the pilot. Agree command authority and restrictions on direct changes to controlled states or stock.
Enter the preventive intervals and dates, then confirm meter types, units and action limits. Prepare a ticket and review the warranty approval practice and current validity window before authorization.
Start eligible work, record the intervention and post the consumed part. Repeat the posting through its supported retry path and confirm that stock changes once. Bring the work to inspection and verify the accepted outcome across the ticket, certificate and asset.
Review the queues using the actual operating accounts. Confirm the owner of due-plan review and reorder follow-up. Expand the scope when the team can explain the evidence and responsibility at each handoff.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Asset Tracking for your business. Start with an identifiable tagged asset, a preventive plan and a maintenance ticket that the team can carry through authorization, parts posting and inspection acceptance.
Use the asset tag and serial number alongside the equipment name and home location. Confirm the physical item before recording a reading or starting maintenance so its evidence remains attached to the correct asset.
Maintenance Planner records the interval, last serviced date and next due date against the asset. Scheduled Maintenance brings upcoming plans into review so the planner can prepare the required work and confirm its assignment.
The validated reading is stored against the selected asset and the workflow flags that equipment for maintenance. Maintenance Planner reviews the condition and prepares the appropriate work through the normal authorization process.
The command checks the maintenance ticket, its asset and an Approved warranty record whose validity interval covers today. Check the record's ticket link and dates together before relying on its approval state.
Maintenance Approver reviews the completed work and accepts its inspection through the agreed execution command. Acceptance closes the ticket, records the linked service certificate and returns the asset to Active.
Parts Coordinator submits the maintenance ticket, part and quantity through the usage action. It records the consumption exactly once and reduces stock on hand by the accepted quantity. Rehearse its retry behavior before live use.
The posting action flags reorder when stock reaches the part's reorder point. Parts Coordinator reviews the condition and follows the customer's purchasing process, with any purchasing-system connection configured separately.
Confirm that the certificate identifies the correct asset and maintenance ticket. Review the performed date, recorded result and next due date alongside the Technician's work evidence before using the history for the next planning decision.
Test current and expired coverage, a reading at its action limit and a repeated parts submission. Accept a completed inspection and confirm the closed ticket, service certificate and Active asset together. Check personal work access using the actual employee mappings.
Start free, then use Proto to change fields, steps and approvals before your team goes live.