Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Aerospace and Defense QMS
- Part and assembly records
- Document source
- Certificate source
- Identity
The system organizes assigned incoming, in-process, final, and service inspections around characteristic checks and retained evidence. Inspectors record requirements and results before an inspection reaches review.
Inspections in one list
Quality Approver decides acceptance or rejection after reviewing linked checks.
Every feature works on the same records. Pick one to see the screen your team works in.
Assign an inspection, record characteristic results and submit a complete evidence set for review.
Inspections
| Inspection number | Subject reference | Inspection type | Scheduled at | Status | Assigned to | |
|---|---|---|---|---|---|---|
| INS-84277 | Actuator housing lot 641 | Incoming | 28 Nov | Planned | Daniel Sato | |
| INS-71574 | Flight bracket revision C | In process | 23 Nov | In progress | Evan Haddad | |
| INS-73223 | Guidance enclosure 112 | Final | 17 Nov | Review | Asha Novak | |
| INS-46848 | Valve body batch 27 | Service | 21 Nov | Accepted | Mei Okafor | |
| INS-29231 | Titanium fastener heat 8841 | Incoming | 12 Nov | Planned | Camila Adeyemi |
Review linked checks, accept inspected scope or raise a nonconformance for rejected work.
Approval conditions
| Inspection number | Inspection type | Subject reference | Status | Assigned to | |
|---|---|---|---|---|---|
| INS-39032 | Incoming | Actuator housing lot 641 | Review | Owen Velasquez | |
| INS-98156 | In process | Flight bracket revision C | Review | Evan Haddad | |
| INS-81268 | Final | Guidance enclosure 112 | Review | Daniel Sato | |
| INS-74576 | Service | Valve body batch 27 | Review | Nadia Rahman | |
| INS-31862 | Incoming | Titanium fastener heat 8841 | Review | Evan Haddad |
Keep root cause, approved action, owner and effectiveness review attached to a nonconformance.
Corrective actions
| Nonconformance | Root cause | Action | Due date | Status | Owner | |
|---|---|---|---|---|---|---|
| Bracket hole pattern out of tolerance | Fixture locator worn beyond limit | Replace locator and recheck first articles | 05 Nov | Effectiveness review | Asha Novak | |
| Fastener certificate missing heat trace | Old drawing remained at inspection bench | Remove obsolete drawings from workstations | 20 Nov | Effectiveness review | Daniel Sato | |
| Valve bore finish exceeds roughness limit | Supplier heat records were misfiled | Reconcile heat certs to received lots | 12 Nov | Effectiveness review | Camila Adeyemi | |
| Bracket hole pattern out of tolerance | Gage calibration interval was missed | Recall and recalibrate affected gages | 16 Nov | Effectiveness review | Nadia Rahman | |
| Bracket hole pattern out of tolerance | Deburring step omitted from traveler | Add deburr signoff to traveler | 17 Nov | Effectiveness review | Ravi Mercer |
Plan audit scope, assign an auditor and close reporting with linked findings in view.
Audit findings
| Audit | Requirement | Finding | Severity | Due date | Owner | |
|---|---|---|---|---|---|---|
| Supplier machining traceability audit | AS9100 8.5.2 identification | Heat numbers missing from two travelers | Observation | 26 Nov | Camila Adeyemi | |
| Supplier machining traceability audit | AS9100 8.7 nonconforming output | Obsolete drawing found at cell 4 | Minor | 23 Nov | Ravi Mercer | |
| Supplier machining traceability audit | AS9100 7.1.5 monitoring resources | One gage lacked current calibration label | Major | 20 Nov | Owen Velasquez | |
| Foreign object prevention audit | Drawing 214-7 flatness 0.10 mm | FOD log unsigned on night shift | Observation | 16 Nov | Daniel Sato | |
| Special process supplier audit | Traveler 18 torque verification | Torque record missing for unit 112 | Minor | 22 Nov | Mei Okafor |
Review quality document revisions and record who acknowledged the approved material.
Approval conditions
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| First article inspection procedure | Rev A | 10 Nov | first_article_inspection_rev_c.pdf | Review | |
| Material traceability work instruction | Rev B | 09 Nov | material_traceability_rev_b.pdf | Review | |
| Final acceptance test plan | Rev C | 17 Nov | final_acceptance_plan_rev_d.pdf | Review | |
| Foreign object prevention standard | Rev D | 18 Nov | fod_prevention_rev_a.pdf | Review | |
| Calibration control procedure | Rev E | 10 Nov | calibration_control_rev_e.pdf | Review |
Keep first article characteristics and material certificate references close to quality decisions.
Inspections
Inspection to corrective action ships ready to use. One step needs a named approval before the work moves on: Decide inspection (Quality Approver).
Assign the inspected subject, type and person.
Capture characteristic requirements, results and evidence.
Send complete checks into review.
Review the checks and accept or reject the scope.
Follow rejected work into containment and cause review.
Check retained cause, action and linked action states before closure.
Open any inspection to see its nonconformances, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Status and Assigned to.
Each line is linked to this inspection.
Quality Manager, Inspector and Quality Approver, each with their own permissions.
Plan inspection and Record checks, with the role that acts.
Decide inspection, with who decides.
Incoming
| Detected at | Severity | Description |
|---|---|---|
| 08 Nov | Minor | Casting pore exceeds drawing limit |
| 26 Nov | Major | Two holes shifted 0.4 mm from datum |
| 12 Nov | Critical | Gasket compression below acceptance limit |
Quality Approver reads inspection evidence and decides disposition. Quality Manager follows corrective actions, audit reporting and document revisions.
Signed in as Quality Approver
| Decision | Approver | |
|---|---|---|
| Decide inspectionReview the checks and accept or reject the scope. | Quality Approver |
Everyone opens Aerospace and Defense QMS to the work that is theirs. Pick a role to see what it starts with.
Owns quality setup, planning and assigned operational work.
This is the first screen this role sees.
Inspections · Quality Manager
Captures assigned quality work and evidence.
This is the first screen this role sees.
Inspections · Inspector
Reviews evidence and authorizes eligible domain outcomes.
This is the first screen this role sees.
Nonconformances · Quality Approver
Reviews assigned audit scope, findings, and reporting before closure.
This is the first screen this role sees.
Audits · Auditor
Configures access and maintains the people directory for quality work.
Ask focused questions about inspections, corrective actions, audits and document acknowledgment.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 25 | ||
| In progress | 11 | 44% | |
| Review | 7 | 64% | |
| Accepted | 3 | 43% |
Sample counts per stage
Group inspections by inspection type and lifecycle status.
Read each inspection with its linked characteristic results and evidence.
Compare severity and current status for detected nonconformances.
List owners, due dates, status, and completed dates for corrective actions.
Read each audit and its requirement-linked findings, severity, owner, and due date.
List title, version, effective date, and current document status.
Read each controlled document with the people and dates of acknowledgment.
Compare characteristic requirement, actual result, and disposition by part and revision.
See how Aerospace and Defense QMS fits your kind of team.
Connect assembly inspections, first article checks and corrective work to the inspected subject.
Follow inspection disposition, audit findings and controlled instructions for program work.
Review incoming parts, supplier audit findings and retained certificate evidence.
Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to prepare quality records and surface evidence for a named reviewer.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Choose one inspected part or assembly, its quality owners and the first document revision to manage.
Link People to platform users and agree inspection, audit, part and revision naming.
Assign an inspection, record linked characteristic results and review an accepted and rejected case.
Rehearse containment, the approved action state and effectiveness review on the rejected case.
Run one audit through reporting, submit one controlled document for release and check a first article and trace entry.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure QMS for Aerospace and Defense for your business. Begin with one inspection type, one assigned Inspector, a Quality Approver and a representative part or assembly.
Use incoming, in-process, final or service inspections. Each case keeps its subject, planned date, assigned person and linked characteristic checks.
Inspector records the requirement, observation, result and evidence. Quality Approver reviews the inspection scope and decides acceptance or rejection. Rejected scope creates a linked nonconformance in containment.
A corrective action links to its nonconformance and keeps cause, action, owner, due date and status. At effectiveness review, the workflow checks the retained cause and action; the parent issue closes when its linked actions meet the close condition.
Yes. A first article check records part number, revision, characteristic, requirement, actual result and disposition against an inspection.
A material trace entry keeps the part serial, heat number, supplier certificate, process certificate and verifying person.
An audit moves through planned, in progress and reporting. When the audit reaches reporting, the workflow checks its scope against linked findings before closure.
Quality Manager prepares a revision. The release workflow checks the title when the revision is submitted for review and then marks it approved. Acknowledgments link a person and date to the document.
The My inspections view lists cases by assigned person. Open inspections and inspections in review support the wider quality queue.
Use an inspected subject with a few clear characteristics, one document revision and a quality issue the team can follow from review through effectiveness.
Start free, then use Proto to change fields, steps and approvals before your team goes live.