All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

QMS for Manufacturing · Available now

Manufacturing quality software from lot inspection to CAPA.

QMS for Manufacturing organizes scheduled inspections, their individual checks and the decision to accept or reject the inspected scope. An Inspector records observations and results.

  • No per-user fees
  • Manual work is free
  • Configure it in Proto
OverviewInspection Queue
Manufacturing QMS · Inspections

Inspection Queue

Inspections in one list

New inspection
Inspections in view
6
Incoming
2
In process
2
Final
1
Incoming2
Valve block lot 61INS-55616
21 Nov
Support frame lot 42INS-89091
18 Nov
Add
In process2
Pump housing lot 73INS-89892
11 Nov
Panel batch 15INS-49094
22 Nov
Add
Final1
Gear shaft run 18INS-54678
20 Nov
Add
Service1
Steel bar heat 904INS-10308
12 Nov
Add
Valve block lot 61Inspections · INS-55616
Incoming
Scheduled at21 Nov
StatusPlanned
Assigned toSana Bell
Review inspectionINS-55616 · Valve block lot 61

Reviewer decides whether the inspected scope is accepted or rejected.

Waiting for Reviewer
ApproveReturn
Example screen with sample data
Tables, ready to use
12
Saved views
16
Roles with set permissions
7
Reports and dashboards
8
Features

See each quality case in context

Every feature works on the same records. Pick one to see the screen your team works in.

Inspections

Schedule inspections, capture check results and review the decision on the inspected scope.

  • Plan the assignment
  • Capture each requirement
  • Submit for decision
  • Inspections
  • Inspection checks
  • People
  • Nonconformances
Explore inspections
OverviewInspection Review Inbox
Manufacturing QMS · Inspections

Inspection Review Inbox

Approval conditions

New
Inspection numberSubject referenceInspection typeCompleted atStatus
INS-82567Valve block lot 61IncomingReview
INS-89008Pump housing lot 73In processReview
INS-25246Gear shaft run 18FinalReview
INS-93415Steel bar heat 904ServiceReview
INS-79375Support frame lot 42IncomingReview
6 of 6 records
Valve block lot 61Inspections · INS-82567
Incoming
StatusReview
Example screen with sample data
Process

Follow the inspection through correction

Inspection to corrective action ships ready to use. 2 steps need a named approval before the work moves on: Review inspection (Reviewer) and Verify effectiveness (Quality Manager).

Drag a card to another stage, or focus it and use the arrow keys. It updates to match the stage.

  1. Plan inspection

    Assign the inspected subject, type and date to an Inspector.

    Valve block lot 61INS-55616 · Quality Manager
    Plan inspectionBy Quality Manager
  2. Conduct checks

    Record each requirement's observation and result before submission.

    Valve block lot 61INS-55616 · Inspector
    Conduct checksBy Inspector
  3. Review inspection

    A Reviewer examines complete checks and accepts or rejects the scope.

    Valve block lot 61INS-55616 · Reviewer
    Review inspectionBy Reviewer
    ApprovalReviewer decides whether the inspected scope is accepted or rejected.
  4. Contain failure

    Track a rejected scope through its linked quality issue.

    Valve block lot 61INS-55616 · Quality Manager
    Contain failureBy Quality Manager
  5. Correct cause

    An owner records the cause and action, then submits an implementation update.

    Valve block lot 61INS-55616 · Corrective Action Owner
    Correct causeBy Corrective Action Owner
  6. Verify effectiveness

    The Quality Manager tests the result before closing linked work.

    Valve block lot 61INS-55616 · Corrective Action Owner
    Verify effectivenessBy Corrective Action Owner
    ApprovalQuality Manager accepts the action outcome after testing effectiveness.
Inside a record

Bring production identity into the quality record

Open any inspection to see its inspection checks, the roles that work on it, its process stages and its approvals on one page.

  1. 1
    Record details

    Scheduled at, Status and Assigned to.

  2. 2
    Inspection checks

    Each line is linked to this inspection.

  3. 3
    Who works on it

    Inspector, Reviewer and Quality Manager, each with their own permissions.

  4. 4
    Process stages

    Plan inspection and Capture production lot, with the role that acts.

  5. 5
    Approvals

    Review inspection and Verify effectiveness, with who decides.

Inspection QueueValve block lot 61
Manufacturing QMS · Inspections

Valve block lot 61

Incoming

Log activity
1
Record details
Scheduled at21 Nov
StatusPlanned
Assigned toSana Bell
2
Inspection checks

Valve block lot 61

InspectionRequirementObservation
Coating check, panel batch 15Valve bore 24.00 plus 0.05 mmBore measured 24.08 mm
First piece check, valve block lot 61Housing face flatness 0.08 mmFace flatness measured 0.12 mm
First piece check, valve block lot 61Keyway offset within 0.10 mmKeyway offset measured 0.18 mm
Inspection checks
6
3

Who works on it

  • InspectorManage Inspections, inspection checks, production inspection…
  • ReviewerManage Inspections, Nonconformances
  • Quality ManagerManage Nonconformances, corrective actions, Audits, audit…
4

Process stages

  • Plan inspectionQuality Manager, Inspector
  • Capture production lotInspector
5

Approvals

  • Review inspectionReviewer
    Approved
  • Verify effectivenessQuality Manager
    Waiting
Example screen with sample data
Approvals

Put inspection decisions with the reviewer

Use the inspection review inbox and effectiveness review queue to identify records awaiting a person.

OverviewApprovals
Manufacturing QMS · Overview

Approvals

Signed in as Reviewer

Waiting for you

4 To review1 Overdue2 Decided todayOnly mine
0 selectedApproveReturn
  • CA-36441Boring tool wear was not detected
    Support frame weld porosityRequested by Ravi Solano
    Effectiveness review2dActions
  • CA-15851Fixture clamp pressure was uneven
    Clamp spring force below targetRequested by Ravi Solano
    Effectiveness review1dActions
  • CA-17541Gear cutter offset entered incorrectly
    Support frame weld porosityRequested by Leila Park
    Effectiveness review2dActions
  • CA-95787Supplier mixed bar heat at dispatch
    Valve block bore oversizeRequested by Marcus Chen
    Effectiveness review5dActions

Who approves what

DecisionApprover
Review inspectionA Reviewer examines complete checks and accepts or rejects the scope.Reviewer
Verify effectivenessThe Quality Manager tests the result before closing linked work.Quality Manager
Approve InspectionsReviewer
Approve corrective actionsQuality Manager
4 approval rules · set per role in Proto
Example screen with sample data
Roles

A workspace for each role

Everyone opens Manufacturing QMS to the work that is theirs. Pick a role to see what it starts with.

Inspector

Records inspection checks, production inspection lots and defect observations for assigned work.

This is the first screen this role sees.

OverviewInspection Queue

Inspection Queue

Inspections · Inspector

Incoming2
Valve block lot 61INS-55616
21 Nov
Support frame lot 42INS-89091
18 Nov
Add
In process2
Pump housing lot 73INS-89892
11 Nov
Panel batch 15INS-49094
22 Nov
Add
Final1
Gear shaft run 18INS-54678
20 Nov
Add
Service1
Steel bar heat 904INS-10308
12 Nov
Add
Example screen with sample data
Reports

Read the evidence behind the outcome

Read inspection outcomes, lot defects, due findings and corrective action work.

Overview
Manufacturing QMS · Overview

Manufacturing QMS dashboard

This quarter

Audits in view
6
Planned
2
In progress
2
Reporting
2

Inspections by status

How far records got this quarter

StageReachedStep
Planned29
In progress1966%
Review1053%
Accepted660%

Number of inspections by status

Sample counts per stage

1000
100Planned
100In progress
60Review
80Accepted
90Rejected
Example screen with sample data
  1. 01Inspection outcomes

    Which incoming, in-process, final or service inspections ended accepted or rejected?

  2. 02Check results

    Which requirement and observation led to a failed inspection?

  3. 03Defects by lot

    Which defect codes and affected units were recorded against a production lot?

  4. 04Nonconformance aging

    Which detected issues remain in containment, investigation or disposition?

  5. 05Corrective action due dates

    Which owners have dated work awaiting implementation or effectiveness review?

  6. 06Audit findings by due date

    Which findings have owners and due dates, and which already have closure dates?

  7. 07Document acknowledgments

    Which people acknowledged a controlled document and when?

  8. 08Inspection workload

    Which inspectors have planned or active assigned work?

Controls

Keep linked issues open through effectiveness review

Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.

OverviewInspection to corrective action
Manufacturing QMS · Process

Inspection to corrective action

Each stage, the role that acts and the status it records

Process stages
10
Approval steps
2
Roles involved
4
Tables touched
6
Conduct checks
Inspector
StatusPlanned → in progress
RecordsInspection checks
Submit inspection
Inspector
StatusIn progress → Review
Review inspectionApproval
Reviewer
StatusReview → Accepted
Inspection to corrective action
  1. Start
    Conduct checksPlanned → in progress
    Inspection checks
  2. Step
    Submit inspectionIn progress → Review
    Inspector
  3. Approval
    Review inspectionReview → Accepted
    Reviewer
  4. Step
    Contain failureOpen → Containment
    Nonconformances
  5. Approval
    Correct causePlanned → Approved → Implementing
    Corrective actions
Example screen with sample data
AI agent

Ask Proto to prepare the next review

Ask Proto to help prepare quality records and surface the evidence for human review.

It can

  • Inspector: Find assigned inspections and the linked checks still awaiting an observation or result.
  • Reviewer: Gather the inspection, check outcomes and production lot context for a review decision.
  • Quality Manager: Show open nonconformances, linked corrective actions and work awaiting effectiveness review.
  • Auditor: Gather findings by due date with their parent audit, owner and closure date.

Stays with a person

  • A person decides whether inspected scope passes, whether a corrective action is approved and whether it was effective.
  • The assistant can prepare the linked records and identify missing evidence.
  • Keep the decision with the named role and record the outcome on the appropriate inspection or action.
  • Review usage and access with Admin before broad rollout.
Integrations

Connects to the tools you use

Set up connections through ERP.AI and Proto workflows, with every change logged.

  • Manufacturing QMS
  • Production execution
  • Product identity
  • Document source
  • People directory
Data model

Your data, in tables you can change

Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.

Browse all 12 tables
12tables
  • Inspections4
  • Production Lots3
  • Defect Observations4
  • Nonconformances5
  • Corrective Actions4
  • Audits and Documents5
Implementation

Roll out one team at a time

Start with one team and one process, then add the rest once the basics are running.

  1. Name owners

    Identify Inspectors, Reviewers, a Quality Manager, Corrective Action Owners, an Auditor, Document Control and Admin. Agree who decides inspection acceptance and action effectiveness.

  2. Prepare records

    Add people and user identities, inspection types, controlled documents and the production identifiers used for the pilot scope.

  3. Run an inspection

    Schedule a real case, enter linked checks and try both complete and incomplete submission. Ask a Reviewer to decide a passing and failing example.

  4. Follow a failure

    Create the linked Nonconformance from a rejection, assign an action owner and rehearse approval, an implementation update and effectiveness review.

  5. Extend evidence

    Add a Production Inspection Lot and Defect Observation, then rehearse an audit finding and a document acknowledgment.

Pricing

$0per user

The base account and everyday work in the ERP.AI app are free, for every user.

  • No per-user or per-seat fees
  • Viewing, editing, approving and exporting records in the app is free
  • Pay only for machine work: API calls, imports, workflows and AI agents
  • Prepaid credits from $5. Purchased credits never expire

Pricing details

Machine work rate card Included per $1

Machine work rate card
UsagePer $1
Record reads (list, filter, get)20,000
Search or aggregate queries4,000
Record writes4,000
Imported or synced records200,000
Workflow runs2,000
AI agent runs2,000
Scheduled jobs or webhooks20,000
File uploads (MB)2,000
CSV or PDF exports100
FAQ

Questions, answered

Scope, rollout and pricing for Manufacturing QMS.

All questions
How do I get started?

Click Get started, then use Proto to configure QMS for Manufacturing for your business. Start with one inspection type, a passing and failing case, and the people who will record and review them.

What does an Inspector record?

The Inspector works an assigned inspection, records observations and results on linked checks, and submits complete work for review. A required check that lacks an observation or result stops submission.

Who decides whether an inspection passes?

The Reviewer reads the linked check results and accepts passing scope or rejects failed scope. Rejection creates a linked containment Nonconformance.

Can I connect a production lot to an inspection?

Yes. A Production Inspection Lot stores a work order reference, product code, lot number, sample size and lot size against a selected inspection.

How are defects recorded?

The Inspector selects a saved production lot and records the defect code, severity, defective units and observed date. The observation remains linked to that lot.

What happens after a rejected inspection?

The linked Nonconformance tracks containment, investigation and disposition. Corrective Actions record root cause, action ownership, due date and effectiveness review against that issue.

Who closes corrective action work?

The Quality Manager checks effectiveness after the owner submits an implementation update. The linked issue closes only after every related action has been accepted.

Can auditors track findings?

Audits have a scope, planned date and auditor. Findings link to their audit and record requirement, severity, owner, due date and closure date.

How do document acknowledgments work?

Controlled Documents keep the title, version, attachment, effective date and status. Training Acknowledgments link a document and person with the date acknowledged.

What should we connect during setup?

Agree how production identifiers, people identities and document attachments reach the quality team. Rehearse those references on an inspection and lot before expanding the operating scope.

Set up Manufacturing QMS your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appQMS for Manufacturing

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.