Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Manufacturing QMS
- Production execution
- Product identity
- Document source
- People directory
QMS for Manufacturing organizes scheduled inspections, their individual checks and the decision to accept or reject the inspected scope. An Inspector records observations and results.
Inspections in one list
Reviewer decides whether the inspected scope is accepted or rejected.
Every feature works on the same records. Pick one to see the screen your team works in.
Schedule inspections, capture check results and review the decision on the inspected scope.
Approval conditions
| Inspection number | Subject reference | Inspection type | Completed at | Status | |
|---|---|---|---|---|---|
| INS-82567 | Valve block lot 61 | Incoming | Review | ||
| INS-89008 | Pump housing lot 73 | In process | Review | ||
| INS-25246 | Gear shaft run 18 | Final | Review | ||
| INS-93415 | Steel bar heat 904 | Service | Review | ||
| INS-79375 | Support frame lot 42 | Incoming | Review |
Attribute a production lot, work order reference and sample to a selected inspection.
Production inspection lots
| Operational record | Work order reference | Product code | Lot number | Sample size | Lot size | |
|---|---|---|---|---|---|---|
| Weld inspection, support frame 42 | WO 4128 | VB-240 valve block | L26-7849 | 170 | 950 | |
| Weld inspection, support frame 42 | WO 4160 | PH-310 pump housing | L26-9218 | 770 | 890 | |
| In-process check, gear shaft run 18 | WO 4192 | GS-180 gear shaft | L26-5260 | 890 | 820 | |
| Dimensional check, bearing sleeve 27 | WO 4201 | SF-420 support frame | L26-7149 | 770 | 690 | |
| Final inspection, pump housing lot 73 | WO 4216 | CP-150 coated panel | L26-7557 | 50 | 360 |
Record defect codes, severity and affected units against production inspection lots.
Defect observations
| Lot | Defect code | Severity | Defective units | Observed at | |
|---|---|---|---|---|---|
| Coated panel batch 15, order 4216 | BORE-OVERSIZE | Minor | 820 | 06 Nov | |
| Support frame lot 42, work order 4201 | FLATNESS | Major | 790 | 05 Nov | |
| Bearing sleeve lot 27, order 4230 | KEYWAY-OFFSET | Critical | 90 | 05 Nov | |
| Bearing sleeve lot 27, order 4230 | LOW-HARDNESS | Minor | 170 | 19 Nov | |
| Steel bar heat 904, receipt 5811 | WELD-POROSITY | Major | 170 | 17 Nov |
Link rejected inspection scope to containment, investigation and disposition work.
Inspections
| Inspection number | Subject reference | Scheduled at | Completed at | Status | |
|---|---|---|---|---|---|
| INS-50719 | Valve block lot 61 | 07 Nov | Planned | ||
| INS-50022 | Pump housing lot 73 | 08 Nov | In progress | ||
| INS-14829 | Gear shaft run 18 | 15 Nov | Review | ||
| INS-59428 | Steel bar heat 904 | 17 Nov | Accepted | ||
| INS-36255 | Support frame lot 42 | 24 Nov | Planned |
Connect root cause, approved action and effectiveness review to a nonconformance.
Close waits for the quality manager
| Nonconformance | Owner | Root cause | Action | Completed at | Status | |
|---|---|---|---|---|---|---|
| Support frame weld porosity | Ravi Solano | Boring tool wear was not detected | Replace boring tool and sort lot | Effectiveness review | ||
| Clamp spring force below target | Ravi Solano | Fixture clamp pressure was uneven | Reset fixture and remeasure housings | Effectiveness review | ||
| Support frame weld porosity | Leila Park | Gear cutter offset entered incorrectly | Correct offset and verify first piece | Effectiveness review | ||
| Valve block bore oversize | Marcus Chen | Supplier mixed bar heat at dispatch | Segregate heat and request retest | Effectiveness review | ||
| Steel bar hardness below minimum | Nora Calder | Shield gas flow dropped during weld | Repair gas regulator and reinspect welds | Effectiveness review |
Track audit scope and findings alongside controlled versions and acknowledgments.
Audit findings
| Audit | Requirement | Finding | Severity | Due date | Owner | |
|---|---|---|---|---|---|---|
| Final inspection records audit | Valve bore 24.00 plus 0.05 mm | Tool life log missed two changes | Observation | 06 Nov | Leila Park | |
| Machine shop process audit | Housing face flatness 0.08 mm | Fixture check lacked signoff | Minor | 07 Nov | Elena Mensah | |
| Clamp assembly control audit | Keyway offset within 0.10 mm | Old cutter offset remained on screen | Major | 10 Nov | Jonah Duarte | |
| Weld cell qualification audit | Steel hardness at least 28 HRC | Heat number absent on three bars | Observation | 08 Nov | Ravi Solano | |
| Coating line parameter audit | Weld porosity per standard W-06 | Gas flow check omitted shift B | Minor | 12 Nov | Tomas Iyer |
Inspection to corrective action ships ready to use. 2 steps need a named approval before the work moves on: Review inspection (Reviewer) and Verify effectiveness (Quality Manager).
Assign the inspected subject, type and date to an Inspector.
Record each requirement's observation and result before submission.
A Reviewer examines complete checks and accepts or rejects the scope.
Track a rejected scope through its linked quality issue.
An owner records the cause and action, then submits an implementation update.
The Quality Manager tests the result before closing linked work.
Open any inspection to see its inspection checks, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Status and Assigned to.
Each line is linked to this inspection.
Inspector, Reviewer and Quality Manager, each with their own permissions.
Plan inspection and Capture production lot, with the role that acts.
Review inspection and Verify effectiveness, with who decides.
Incoming
| Inspection | Requirement | Observation |
|---|---|---|
| Coating check, panel batch 15 | Valve bore 24.00 plus 0.05 mm | Bore measured 24.08 mm |
| First piece check, valve block lot 61 | Housing face flatness 0.08 mm | Face flatness measured 0.12 mm |
| First piece check, valve block lot 61 | Keyway offset within 0.10 mm | Keyway offset measured 0.18 mm |
Use the inspection review inbox and effectiveness review queue to identify records awaiting a person.
Signed in as Reviewer
| Decision | Approver | |
|---|---|---|
| Review inspectionA Reviewer examines complete checks and accepts or rejects the scope. | Reviewer | |
| Verify effectivenessThe Quality Manager tests the result before closing linked work. | Quality Manager | |
| Approve Inspections | Reviewer | |
| Approve corrective actions | Quality Manager |
Everyone opens Manufacturing QMS to the work that is theirs. Pick a role to see what it starts with.
Records inspection checks, production inspection lots and defect observations for assigned work.
This is the first screen this role sees.
Inspections · Inspector
Decides whether reviewed inspections are accepted or rejected and opens containment work for failures.
This is the first screen this role sees.
Inspections · Reviewer
Owns nonconformance disposition and reviews the quality record across operations.
This is the first screen this role sees.
Inspections · Quality Manager
Investigates assigned nonconformances and submits corrective action evidence.
This is the first screen this role sees.
Nonconformances · Corrective Action Owner
Plans audits and records findings against their scope.
This is the first screen this role sees.
Audits · Auditor
Maintains controlled document versions and training acknowledgments.
This is the first screen this role sees.
Controlled documents · Document Control
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Valve block machining inspection plan | Rev A | 16 Nov | valve_block_inspection_c.pdf | Review | |
| Pump housing final acceptance guide | Rev B | 14 Nov | pump_housing_acceptance_b.pdf | Review | |
| Gear shaft setup work instruction | Rev C | 25 Nov | gear_shaft_setup_d.pdf | Review | |
| Steel bar receiving specification | Rev D | 06 Nov | steel_receiving_spec_a.pdf | Review | |
| Frame weld visual standard | Rev E | 21 Nov | frame_weld_standard_e.pdf | Review |
Configures access and maintains people and user records.
Read inspection outcomes, lot defects, due findings and corrective action work.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 29 | ||
| In progress | 19 | 66% | |
| Review | 10 | 53% | |
| Accepted | 6 | 60% |
Sample counts per stage
Which incoming, in-process, final or service inspections ended accepted or rejected?
Which requirement and observation led to a failed inspection?
Which defect codes and affected units were recorded against a production lot?
Which detected issues remain in containment, investigation or disposition?
Which owners have dated work awaiting implementation or effectiveness review?
Which findings have owners and due dates, and which already have closure dates?
Which people acknowledged a controlled document and when?
Which inspectors have planned or active assigned work?
See how Manufacturing QMS fits your kind of team.
Apply inspection and defect evidence to individual production lots and work orders.
Review sampled lots with recorded results, defect units and corrective follow-up.
Use inspection types and subject references to review quality across assembly stages.
Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to help prepare quality records and surface the evidence for human review.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Identify Inspectors, Reviewers, a Quality Manager, Corrective Action Owners, an Auditor, Document Control and Admin. Agree who decides inspection acceptance and action effectiveness.
Add people and user identities, inspection types, controlled documents and the production identifiers used for the pilot scope.
Schedule a real case, enter linked checks and try both complete and incomplete submission. Ask a Reviewer to decide a passing and failing example.
Create the linked Nonconformance from a rejection, assign an action owner and rehearse approval, an implementation update and effectiveness review.
Add a Production Inspection Lot and Defect Observation, then rehearse an audit finding and a document acknowledgment.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure QMS for Manufacturing for your business. Start with one inspection type, a passing and failing case, and the people who will record and review them.
The Inspector works an assigned inspection, records observations and results on linked checks, and submits complete work for review. A required check that lacks an observation or result stops submission.
The Reviewer reads the linked check results and accepts passing scope or rejects failed scope. Rejection creates a linked containment Nonconformance.
Yes. A Production Inspection Lot stores a work order reference, product code, lot number, sample size and lot size against a selected inspection.
The Inspector selects a saved production lot and records the defect code, severity, defective units and observed date. The observation remains linked to that lot.
The linked Nonconformance tracks containment, investigation and disposition. Corrective Actions record root cause, action ownership, due date and effectiveness review against that issue.
The Quality Manager checks effectiveness after the owner submits an implementation update. The linked issue closes only after every related action has been accepted.
Audits have a scope, planned date and auditor. Findings link to their audit and record requirement, severity, owner, due date and closure date.
Controlled Documents keep the title, version, attachment, effective date and status. Training Acknowledgments link a document and person with the date acknowledged.
Agree how production identifiers, people identities and document attachments reach the quality team. Rehearse those references on an inspection and lot before expanding the operating scope.
Start free, then use Proto to change fields, steps and approvals before your team goes live.