Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Quality Management
- Production or service records
- Measurement source
- Document source
An assigned Inspector starts a planned inspection, records observations and results against its linked checks, and submits the work for review. A Quality Approver decides whether the checked scope is accepted or rejected.
start waits for the inspector
| Inspection number | Subject reference | Inspection type | Scheduled at | Assigned to | Status | |
|---|---|---|---|---|---|---|
| INS-41658 | Valve lot VL-241 | Incoming | 07 Nov | Elena Morales | Planned | |
| INS-12895 | Pump housing lot PH-88 | In process | 29 Nov | Fatima Diallo | Planned | |
| INS-67945 | Seal shipment SS-104 | Final | 22 Nov | Luca Romano | Planned | |
| INS-49677 | Harness batch HB-31 | Service | 07 Nov | Arjun Patel | Planned | |
| INS-94884 | Gauge asset PG-17 | Incoming | 12 Nov | Isabel Costa | Planned |
Quality Approver decides the inspection outcome from check evidence
Every feature works on the same records. Pick one to see the screen your team works in.
Assign inspections, collect check evidence and send completed work for a quality decision.
Approval conditions
| Inspection number | Subject reference | Completed at | Assigned to | Status | |
|---|---|---|---|---|---|
| INS-18150 | Valve lot VL-241 | Luca Romano | Review | ||
| INS-74727 | Pump housing lot PH-88 | Isabel Costa | Review | ||
| INS-78422 | Seal shipment SS-104 | Noah Bennett | Review | ||
| INS-27272 | Harness batch HB-31 | Fatima Diallo | Review | ||
| INS-79842 | Gauge asset PG-17 | Noah Bennett | Review |
Keep rejected inspection scope tied to its issue, containment and disposition.
Inspections
| Inspection number | Subject reference | Scheduled at | Status | Assigned to | |
|---|---|---|---|---|---|
| INS-27754 | Valve lot VL-241 | 21 Nov | Planned | Arjun Patel | |
| INS-27165 | Pump housing lot PH-88 | 08 Nov | In progress | Elena Morales | |
| INS-85409 | Seal shipment SS-104 | 29 Nov | Review | Mei Chen | |
| INS-39187 | Harness batch HB-31 | 12 Nov | Accepted | Arjun Patel | |
| INS-44388 | Gauge asset PG-17 | 05 Nov | Planned | Elena Morales |
Assign a correction, retain its root cause and verify effectiveness before closing the issue.
Corrective actions
| Nonconformance | Owner | Action | Due date | Status | |
|---|---|---|---|---|---|
| Valve body bore outside tolerance | Mei Chen | Replace worn fixture stop | 12 Nov | Planned | |
| Mixed revisions in finished kits | Hana Sato | Add torque signoff to traveler | 29 Nov | Approved | |
| Bracket burrs on mounting edge | Omar Farouk | Require protective carton spacers | 19 Nov | Implementing | |
| Bracket burrs on mounting edge | Omar Farouk | Issue corrected wiring diagram | 10 Nov | Effectiveness review | |
| Bracket burrs on mounting edge | Elena Morales | Shorten gauge calibration interval | 13 Nov | Closed |
Plan audit scope and keep findings assigned to an auditor, owner and due date.
Audit findings
| Audit | Requirement | Finding | Severity | Due date | Owner | |
|---|---|---|---|---|---|---|
| Final release audit | Dimensions match current drawing | Two travelers lack torque initials | Observation | 08 Nov | Hana Sato | |
| Receiving inspection process audit | Torque recorded for each assembly | Quarantine labels missing on one pallet | Minor | 12 Nov | Luca Romano | |
| Supplier approval audit | Seals free of tears at receipt | Supplier certificate has no lot trace | Major | 17 Nov | Elena Morales | |
| Supplier approval audit | Pinout matches approved schematic | Gauge sticker date is illegible | Observation | 07 Nov | Mei Chen | |
| Customer complaint handling audit | Gauge within calibration period | Old drawing remains at assembly bench | Minor | 12 Nov | Noah Bennett |
Review document versions and connect acknowledgments to the people who read them.
Controlled documents
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Incoming material acceptance procedure | Rev 1.0 | 15 Nov | incoming-acceptance-v2.pdf | Review | |
| Nonconformance handling policy | Rev 1.2 | 27 Nov | ncr-handling-rev3.pdf | Review | |
| Calibration work instruction | Rev 2.0 | 11 Nov | calibration-workflow.pdf | Review | |
| Supplier approval checklist | Rev 2.3 | 18 Nov | supplier-checklist.xlsx | Review | |
| Final release procedure | Rev 3.0 | 06 Nov | final-release-procedure.pdf | Review |
Set a measured objective and retain the observed values and conclusions from each review.
Quality objectives
| Objective | Measure definition | Target value | Unit | Review date | Owner | |
|---|---|---|---|---|---|---|
| Incoming defect rate below 1 percent | Rejected units divided by received units | 380 | Percent | 08 Nov | Aisha Khan | |
| First pass yield above 98 percent | Accepted units on first inspection | 810 | Days | 06 Nov | Arjun Patel | |
| CAPA closure within 30 days | CAPAs closed before target date | 320 | Count | 13 Nov | Elena Morales | |
| No overdue gauges in production | Gauges current divided by active gauges | 730 | Defects per million | 09 Nov | Aisha Khan | |
| Returns below 0.5 percent | Returned orders divided by shipped orders | 760 | Hours | 08 Nov | Mei Chen |
Inspection to verified correction ships ready to use. 2 steps need a named approval before the work moves on: Decide inspection (Quality Approver) and Correct and verify (Quality Approver).
Assign the subject and Inspector
Record results, observations and evidence
Quality Approver accepts or rejects reviewed scope
Trace the failed scope and its response
An independent reviewer tests the completed action
Close only after linked actions close
Open any inspection to see its inspection checks, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Assigned to and Status.
Each line is linked to this inspection.
Admin, each with their own permissions.
Capture checks, with the role that acts.
Decide inspection and Correct and verify, with who decides.
Incoming
| Inspection | Requirement | Observation |
|---|---|---|
| Packaging seal verification | Dimensions match current drawing | Bore measurement within tolerance |
| Warehouse receiving inspection | Torque recorded for each assembly | Torque values recorded |
| Packaging seal verification | Seals free of tears at receipt | Carton seal intact |
Quality Approver reviews inspection outcomes and effectiveness evidence. Keep that decision separate from the Inspector's submission.
Signed in as Quality Approver
| Decision | Approver | |
|---|---|---|
| Decide inspectionQuality Approver accepts or rejects reviewed scope | Quality Approver | |
| Correct and verifyAn independent reviewer tests the completed action | Quality Approver |
Everyone opens Quality Management to the work that is theirs. Pick a role to see what it starts with.
Owns quality setup, planning and assigned operational work.
This is the first screen this role sees.
Controlled documents · Quality Manager
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Incoming material acceptance procedure | Rev 1.0 | 25 Nov | incoming-acceptance-v2.pdf | Draft | |
| Nonconformance handling policy | Rev 1.2 | 17 Nov | ncr-handling-rev3.pdf | Draft | |
| Calibration work instruction | Rev 2.0 | 19 Nov | calibration-workflow.pdf | Draft | |
| Supplier approval checklist | Rev 2.3 | 07 Nov | supplier-checklist.xlsx | Draft | |
| Final release procedure | Rev 3.0 | 05 Nov | final-release-procedure.pdf | Draft |
Captures assigned quality work and evidence.
This is the first screen this role sees.
Inspections · Inspector
| Inspection number | Subject reference | Inspection type | Scheduled at | Assigned to | Status | |
|---|---|---|---|---|---|---|
| INS-41658 | Valve lot VL-241 | Incoming | 07 Nov | Elena Morales | Planned | |
| INS-12895 | Pump housing lot PH-88 | In process | 29 Nov | Fatima Diallo | Planned | |
| INS-67945 | Seal shipment SS-104 | Final | 22 Nov | Luca Romano | Planned | |
| INS-49677 | Harness batch HB-31 | Service | 07 Nov | Arjun Patel | Planned | |
| INS-94884 | Gauge asset PG-17 | Incoming | 12 Nov | Isabel Costa | Planned |
Reviews evidence and authorizes eligible domain outcomes.
This is the first screen this role sees.
Nonconformances · Quality Approver
Maintains user access and the people records that link users to assigned quality work.
Maintains controlled document versions and the acknowledgment trail for people using them.
This is the first screen this role sees.
Controlled documents · Document Controller
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Incoming material acceptance procedure | Rev 1.0 | 25 Nov | incoming-acceptance-v2.pdf | Draft | |
| Nonconformance handling policy | Rev 1.2 | 17 Nov | ncr-handling-rev3.pdf | Draft | |
| Calibration work instruction | Rev 2.0 | 19 Nov | calibration-workflow.pdf | Draft | |
| Supplier approval checklist | Rev 2.3 | 07 Nov | supplier-checklist.xlsx | Draft | |
| Final release procedure | Rev 3.0 | 05 Nov | final-release-procedure.pdf | Draft |
Read inspection outcomes, open issues and follow-up from the records that produce them.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 44 | ||
| In progress | 12 | 27% | |
| Review | 4 | 33% | |
| Accepted | 2 | 50% |
Sample counts per stage
Show accepted and rejected inspections by inspection type and scheduled date.
Show pending, passing and failing checks by linked inspection.
Show open issues by severity, status and detected date.
Show actions due by owner, status and completion date.
Show findings, severity, owner and due date under each audit.
Show people and acknowledgment dates under each controlled document.
Compare recorded values and conclusions under each objective and target.
Read the attention list, volume counts, status mix and recent inspections.
See how Quality Management fits your kind of team.
Each stage of inspection to verified correction names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask for help preparing inspection, issue and review work from your quality records.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Connect Users and People, then choose the Quality Manager, Inspectors, Quality Approver and Document Controller for the pilot.
Agree subject references, inspection types, check requirements and what observation and attachment each requires.
Run passing and failing inspections, review rejected scope and test linked nonconformance and corrective action closure.
Plan an audit, revise a controlled document and record a quality objective with its first review.
Open the assigned queues and Quality Overview with each role, then review the source records behind the figures.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure Quality Management for your business. Begin with one inspection type, a real subject reference, assigned people and check evidence that a reviewer can inspect.
Inspector records the failed result with its observation and evidence. Quality Approver reviews the inspection, rejects failed scope and can raise a nonconformance linked to the inspection.
Quality Approver makes the decision after the Inspector submits the completed checks to Review.
After every linked corrective action has closed following effectiveness review. Quality Manager should read the linked actions before closing the issue.
Each action links to a nonconformance and an Owner in People, with a due date, root cause and action.
It provides a read-only attention list, volume counts, status mix charts and recent inspections. Open the source record for the evidence behind a decision.
Each audit finding links to an Audit and stores its requirement, finding, severity, owner, due date and closed date.
A training acknowledgment links a person to a particular controlled document record and records the acknowledgment date.
Quality objectives hold the measure definition, target, unit and owner. Linked quality reviews record dated observed values and conclusions.
Start free, then use Proto to change fields, steps and approvals before your team goes live.