All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

QMS for Food and Beverage · Available now

Food and beverage quality management from check to correction.

A food and beverage quality team can schedule an inspection, assign a person, record the checks and evidence, and review the result. HACCP control point readings and allergen changeover verifications connect to the inspection that gives them operational context.

  • No per-user fees
  • Manual work is free
  • Configure it in Proto
OverviewOpen inspections
Food and Beverage QMS · Inspections

Open inspections

Inspections in one list

New inspection
Inspections in view
6
Incoming
2
In process
2
Final
1
Incoming2
Tomato soup batch 418INS-40397
20 Nov
Sauce pouch run 2206INS-44909
28 Nov
Add
In process2
Granola line 1 changeoverINS-41164
22 Nov
Cooler 4 morning checkINS-30587
06 Nov
Add
Final1
Oat flour lot 73INS-81052
07 Nov
Add
Service1
Bar line 3 metal detectorINS-67944
23 Nov
Add
Tomato soup batch 418Inspections · INS-40397
Incoming
Scheduled at20 Nov
StatusPlanned
Assigned toYuna Patel
Review inspectionINS-40397 · Tomato soup batch 418

Quality Manager decides whether the inspection is Accepted or Rejected.

Waiting for Quality Manager
ApproveReturn
Example screen with sample data
Tables, ready to use
12
Saved views
15
Roles with set permissions
6
Reports and dashboards
8
Features

Quality work in one place

Every feature works on the same records. Pick one to see the screen your team works in.

Inspections

Assign inspections, capture check evidence and decide whether work is accepted or rejected.

  • Schedule and ownership
  • Check evidence
  • Decision
  • Inspections
  • Inspection checks
  • People
  • Nonconformances
Explore inspections
OverviewInspections in review
Food and Beverage QMS · Inspections

Inspections in review

Approval conditions

New
Inspection numberSubject referenceCompleted atStatusAssigned to
INS-81010Tomato soup batch 418ReviewTalia Mensah
INS-93987Granola line 1 changeoverReviewElise Rahman
INS-77471Oat flour lot 73ReviewLeila Park
INS-52119Bar line 3 metal detectorReviewYuna Patel
INS-17576Sauce pouch run 2206ReviewNadia Flores
6 of 6 records
Tomato soup batch 418Inspections · INS-81010
Review
Assigned toTalia Mensah
Example screen with sample data
Process

From inspection to correction

Inspection to corrective action ships ready to use. 2 steps need a named approval before the work moves on: Review inspection (Quality Manager) and Approve correction (Quality Manager).

Drag a card to another stage, or focus it and use the arrow keys. It updates to match the stage.

  1. Plan inspection

    Assign the subject, type, date and inspector.

    Tomato soup batch 418INS-40397 · Quality Inspector
    Plan inspectionBy Quality Inspector
  2. Record checks

    Keep observations, results and attachments with the inspection.

    Tomato soup batch 418INS-40397 · Quality Inspector
    Record checksBy Quality Inspector
  3. Review inspection

    Quality Manager accepts or rejects the evidence.

    Tomato soup batch 418INS-40397 · Quality Inspector
    Review inspectionBy Quality Inspector
    ApprovalQuality Manager decides whether the inspection is Accepted or Rejected.
  4. Contain rejection

    Open a linked nonconformance for a rejected inspection.

    Tomato soup batch 418INS-40397 · Quality Manager
    Contain rejectionBy Quality Manager
  5. Approve correction

    Quality Manager verifies the parent case and root cause.

    Tomato soup batch 418INS-40397 · Corrective Action Owner
    Approve correctionBy Corrective Action Owner
    ApprovalQuality Manager verifies the nonconformance link and root cause before approval.
  6. Review effectiveness

    Check the completed action against the original issue.

    Tomato soup batch 418INS-40397 · Quality Manager
    Review effectivenessBy Quality Manager
Inside a record

Keep the line informed

Open any inspection to see its allergen verifications, the roles that work on it, its process stages and its approvals on one page.

  1. 1
    Record details

    Scheduled at, Status and Assigned to.

  2. 2
    Allergen verifications

    Each line is linked to this inspection.

  3. 3
    Who works on it

    Admin, Quality Manager and Quality Inspector, each with their own permissions.

  4. 4
    Process stages

    Plan inspection and Record checks, with the role that acts.

  5. 5
    Approvals

    Review inspection and Approve correction, with who decides.

Open inspectionsTomato soup batch 418
Food and Beverage QMS · Inspections

Tomato soup batch 418

Incoming

Log activity
1
Record details
Scheduled at20 Nov
StatusPlanned
Assigned toYuna Patel
2
Allergen verifications

Tomato soup batch 418

Operational recordLinePrevious allergen
Sanitation check, filling line BGranola line 1Peanut
Pre-op check, soup line 2Snack bar line 3Milk
Sanitation check, filling line BSoup filling line 2Sesame
Allergen verifications
6
3

Who works on it

  • AdminManage Users, People, Inspections, inspection checks, HACCP…
  • Quality ManagerManage Inspections, Nonconformances, corrective actions…
  • Quality InspectorManage Inspections, inspection checks, HACCP checks, allergen…
4

Process stages

  • Plan inspectionQuality Inspector, Quality Manager
  • Record checksQuality Inspector
5

Approvals

  • Review inspectionQuality Manager
    Approved
  • Approve correctionQuality Manager
    Waiting
Example screen with sample data
Approvals

Decisions with a named reviewer

Quality Inspector records check evidence; Quality Manager reviews inspection disposition and corrective action plans.

OverviewApprovals
Food and Beverage QMS · Overview

Approvals

Signed in as Quality Manager

Waiting for you

4 To review1 Overdue2 Decided todayOnly mine
0 selectedApproveReturn
  • CA-33137Steam valve responded slowly
    Soup kettle temperature below limitRequested by Priya Calder
    Effectiveness review1dActions
  • CA-71751Cleaning brush missed feed hopper
    Soup kettle temperature below limitRequested by Owen Duarte
    Effectiveness review2dActions
  • CA-22527Pallet edge tore outer flour bag
    Oat flour bag seal damagedRequested by Marco Chen
    Effectiveness review4dActions
  • CA-78250Detector sensitivity drifted
    Ingredient label missing milk warningRequested by Ravi Bell
    Effectiveness review3dActions

Who approves what

DecisionApprover
Review inspectionQuality Manager accepts or rejects the evidence.Quality Manager
Approve correctionQuality Manager verifies the parent case and root cause.Quality Manager
Approve inspection reviews and corrective action plansQuality Manager
3 approval rules · set per role in Proto
Example screen with sample data
Roles

A workspace for each role

Everyone opens Food and Beverage QMS to the work that is theirs. Pick a role to see what it starts with.

Admin

Configures access and reference data for the quality team.

  • Manage Users, People, Inspections, inspection checks, HACCP checks, allergen verifications, Nonconformances, corrective actions, Audits, audit findings, controlled documents, training acknowledgments
  • View all records
Reports

Read the evidence behind the result

Read inspection states, specialty checks, correction queues and audit follow-up from quality records.

Overview
Food and Beverage QMS · Overview

Food and Beverage QMS dashboard

This quarter

Nonconformances in view
6
Minor
2
Major
2
Critical
2

Inspections by status

How far records got this quarter

StageReachedStep
Planned41
In progress2356%
Review1461%
Accepted857%

Number of inspections by status

Sample counts per stage

500
50Planned
30In progress
20Review
20Accepted
20Rejected
Example screen with sample data
  1. 01Inspection state by type

    Group inspections by type and status to see where reviews accumulate.

  2. 02Rejected inspection follow-up

    Trace rejected inspections to their linked nonconformances and corrective actions.

  3. 03Check result evidence

    Show each inspection and its check results with attached evidence.

  4. 04HACCP readings and disposition

    Compare control point readings and limits by product lot and disposition.

  5. 05Allergen changeover outcomes

    Review swab results by line, prior allergen, next product and cleaning date.

  6. 06Corrective actions due

    List action owners, due dates and status for planned and active corrections.

  7. 07Audit finding follow-up

    Trace audit scope to findings, owners, severity, due dates and closure dates.

  8. 08Document acknowledgments by revision

    Show approved documents and the people who acknowledged them.

Controls

Follow each held or rejected result

Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.

OverviewInspection to corrective action
Food and Beverage QMS · Process

Inspection to corrective action

Each stage, the role that acts and the status it records

Process stages
9
Approval steps
2
Roles involved
3
Tables touched
3
Start inspection
Quality Inspector
StatusPlanned → in progress
Review inspectionApproval
Quality Inspector, Quality Manager
StatusIn progress → Review
Investigate cause
Corrective Action Owner
StatusContainment → Investigation
RecordsCorrective actions, Nonconformances
Inspection to corrective action
  1. Start
    Start inspectionPlanned → in progress
    Quality Inspector
  2. Approval
    Review inspectionIn progress → Review
    Quality Inspector
  3. Step
    Investigate causeContainment → Investigation
    Corrective actions
  4. Approval
    Approve correctionPlanned → Approved
    Corrective actions
  5. Step
    Implement correctionApproved → Implementing → effectiveness review
    Corrective actions
Example screen with sample data
AI agent

Ask Proto about your quality queue

Give your team practical assistance with assigned quality work and review preparation.

It can

  • Quality Inspector: Show assigned inspections in progress and the checks still awaiting a result.
  • Quality Manager: Summarize inspections in review with linked failed checks and evidence references.
  • Corrective Action Owner: List owned actions due for review with their parent nonconformance.
  • Auditor: Show open findings with owners and due dates for the current audit.

Stays with a person

  • An assistant can organize the records and point out missing context.
  • Quality Manager decides whether inspection evidence supports acceptance, whether a corrective plan is sufficient and whether an action worked.
  • The responsible person decides a pending swab result.
  • Keep those decisions with named people.
Integrations

Connects to the tools you use

Set up connections through ERP.AI and Proto workflows, with every change logged.

  • Food and Beverage QMS
  • Production records
  • Inventory handling
  • Laboratory results
  • Document distribution
Data model

Your data, in tables you can change

Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.

Browse all 12 tables
12tables
  • Inspections4
  • HACCP checks4
  • Allergen verification4
  • Nonconformances4
  • Corrective actions4
  • Audits and documents5
Implementation

Roll out one team at a time

Start with one team and one process, then add the rest once the basics are running.

  1. Choose the first subject

    Pick one incoming or in-process inspection type, its subject reference convention and the people who will use it.

  2. Set the quality records

    Prepare check requirements, control point names, product lot formats and allergen changeover names used in the pilot.

  3. Assign decisions

    Give Quality Inspector the capture work and Quality Manager the inspection and action plan reviews. Set corrective action ownership.

  4. Rehearse outcomes

    Run an accepted inspection, a rejected inspection, a held HACCP reading and a pending swab. Follow rejection into containment and correction approval.

  5. Review daily work

    Use the open, review and due lists to agree a routine for unresolved cases.

Pricing

$0per user

The base account and everyday work in the ERP.AI app are free, for every user.

  • No per-user or per-seat fees
  • Viewing, editing, approving and exporting records in the app is free
  • Pay only for machine work: API calls, imports, workflows and AI agents
  • Prepaid credits from $5. Purchased credits never expire

Pricing details

Machine work rate card Included per $1

Machine work rate card
UsagePer $1
Record reads (list, filter, get)20,000
Search or aggregate queries4,000
Record writes4,000
Imported or synced records200,000
Workflow runs2,000
AI agent runs2,000
Scheduled jobs or webhooks20,000
File uploads (MB)2,000
CSV or PDF exports100
FAQ

Questions, answered

Scope, rollout and pricing for Food and Beverage QMS.

All questions
How do I get started?

Click Get started, then use Proto to configure QMS for Food and Beverage for your business. Start with one inspection type, named reviewers and a real accepted and rejected case.

What does an inspection hold?

It records a subject reference, type, schedule, assignee, completion date and review status. Linked checks hold each requirement, observation, result and evidence attachment.

How are HACCP readings handled?

A reading records the control point, product lot, observed temperature, limits and disposition. It links to the operational inspection.

How do allergen changeovers fit?

Record the line, previous allergen, next product, cleaning date and swab result against the inspection. Pending results stay visible for review.

Who decides an inspection result?

Quality Manager reviews the inspector's checks and decides whether the inspection is accepted or rejected.

What happens after rejection?

The rejected inspection links to a nonconformance in containment. The team records severity, investigates and prepares a corrective action.

Who approves a corrective plan?

Quality Manager verifies the plan's nonconformance link and root cause before approving it. The owner then implements the action.

How do audits and findings connect?

Each finding belongs to an audit and can hold a requirement, severity, owner, due date and closure date.

Can the team track document acknowledgment?

Yes. An acknowledgment links a person to a controlled document and records the acknowledgment date.

Set up Food and Beverage QMS your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appQMS for Food and Beverage

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.