Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Automotive QMS
- Production or inventory source
- Customer submission channel
- Measurement device or file store
- Identity source
QMS for Automotive connects an inspection with its individual checks and evidence. An Inspector records results against each requirement and sends the inspection for Quality Reviewer decision.
Inspections in one list
Quality Reviewer decides whether the inspected scope is accepted or rejected.
Every feature works on the same records. Pick one to see the screen your team works in.
Plan incoming, in-process, final and service inspections, retain each check and send a complete case for review.
Approval conditions
| Inspection number | Subject reference | Inspection type | Completed at | Status | Assigned to | |
|---|---|---|---|---|---|---|
| INS-31683 | Brake bracket lot 84 | Incoming | Review | Arun Bell | ||
| INS-10246 | Door hinge press line 3 | In process | Review | Leila Varga | ||
| INS-71287 | Steering link batch 19 | Final | Review | Elena Duarte | ||
| INS-14306 | Seat frame weld cell 2 | Service | Review | Leila Varga | ||
| INS-51006 | Molded seal lot 307 | Incoming | Review | Priya Solis |
Link a rejected inspection to severity, containment and the issue that corrective action must resolve.
Nonconformances
| Inspection | Detected at | Severity | Description | Status | |
|---|---|---|---|---|---|
| Dimensional check, pedal carrier tool 6 | 20 Nov | Critical | Burr remains at bracket mounting hole | Open | |
| Torque audit, suspension arm line 2 | 23 Nov | Critical | Hinge flange angle exceeds tolerance | Containment | |
| Final check, latch assembly lot 53 | 15 Nov | Critical | Link thread fails go gage | Investigation | |
| First off check, door hinge press line | 15 Nov | Critical | Weld undercut found at seat joint | Disposition | |
| Dimensional check, pedal carrier tool 6 | 08 Nov | Critical | Seal flash exceeds 0.3 mm limit | Closed |
Keep cause, approved action, due date and independent effectiveness review tied to a nonconformance.
Close waits for the quality reviewer
| Nonconformance | Root cause | Action | Due date | Status | Owner | |
|---|---|---|---|---|---|---|
| Steering link thread gage failure | Deburr wheel worn below replacement size | Deburr stock and verify hole edges | 05 Nov | Effectiveness review | Nora Mensah | |
| Pedal carrier datum shift | Press stop shifted after die change | Reset press stop and check first pieces | 12 Nov | Effectiveness review | Arun Bell | |
| Suspension arm torque below target | Thread insert replaced without setup check | Quarantine thread gage failures | 15 Nov | Effectiveness review | Leila Varga | |
| Suspension arm torque below target | Weld tip wear changed bead profile | Adjust weld current and inspect coupons | 14 Nov | Effectiveness review | Marcus Iqbal | |
| Suspension arm torque below target | Seal mold vent buildup caused flash | Trim seal flash and update tool check | 06 Nov | Effectiveness review | Marcus Iqbal |
Review controlled revisions, release an effective version and record who acknowledged it.
Approval waits for the document controller
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Brake bracket control plan | Rev A | 26 Nov | brake_bracket_control_plan_c.pdf | Review | |
| Door hinge press work instruction | Rev B | 17 Nov | hinge_press_work_instruction_b.pdf | Review | |
| Steering link inspection standard | Rev C | 26 Nov | steering_link_inspection_d.pdf | Review | |
| Seat frame weld acceptance guide | Rev D | 19 Nov | seat_frame_weld_guide_a.pdf | Review | |
| Molded seal receiving procedure | Rev E | 08 Nov | seal_receiving_procedure_e.pdf | Review |
Plan an audit, keep findings against its scope and review reporting before closure.
Audit findings
| Audit | Requirement | Finding | Severity | Due date | Closed at | |
|---|---|---|---|---|---|---|
| IATF 16949 layered process audit | Control plan step 14 edge condition | Setup signoff missing for die change | Observation | 28 Nov | ||
| Torque tool calibration audit | Drawing H-218 flange angle 92 degrees | Two PPAP gage studies expired | Minor | 16 Nov | ||
| Brake bracket PPAP evidence audit | Thread class 6H go gage acceptance | Weld coupon log omitted shift B | Major | 22 Nov | ||
| Torque tool calibration audit | Weld standard WS-04 undercut limit | Seal lot labels lacked cavity number | Observation | 16 Nov | ||
| Press line setup verification audit | Seal drawing S-91 flash maximum | Torque audit skipped one station | Minor | 09 Nov |
Attach part submission details and measurement study evidence to the inspection that gives them context.
Approval conditions
| Part number | Revision | Submission level | Customer | Status | Operational record | |
|---|---|---|---|---|---|---|
| PPP-20525 | Rev A | Level 1 | Silver Mesa Motors | Submitted | Dimensional check, pedal carrier tool 6 | |
| PPP-33299 | Rev B | Level 2 | Northcove Vehicle Works | Submitted | Weld inspection, seat frame shift B | |
| PPP-93186 | Rev C | Level 3 | Hearthline Mobility | Submitted | Incoming inspection, brake bracket lot 84 | |
| PPP-56761 | Rev D | Level 4 | Pinecrest Auto Systems | Submitted | Torque audit, suspension arm line 2 | |
| PPP-11579 | Rev E | Level 5 | Vale Harbor Transport | Submitted | Dimensional check, pedal carrier tool 6 |
Inspection to corrective action ships ready to use. 2 steps need a named approval before the work moves on: Review inspection (Quality Reviewer) and Verify effectiveness (Quality Reviewer).
Identify the subject, type, date and Inspector.
Capture each requirement, result and required evidence.
Quality Reviewer accepts passing scope or rejects failed scope.
Link a rejected case to severity and immediate follow-up.
Record the root cause and approved action against the issue.
A separate reviewer tests the result before closure.
Open any inspection to see its inspection checks, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Status and Assigned to.
Each line is linked to this inspection.
Inspector, Quality Reviewer and Corrective Action Owner, each with their own permissions.
Plan inspection and Contain failure, with the role that acts.
Review inspection and Verify effectiveness, with who decides.
Incoming
| Inspection | Requirement | Observation |
|---|---|---|
| First off check, door hinge press line | Control plan step 14 edge condition | Edge burr visible at hole 2 |
| First off check, door hinge press line | Drawing H-218 flange angle 92 degrees | Flange measured 93.1 degrees |
| Torque audit, suspension arm line 2 | Thread class 6H go gage acceptance | Go gage stopped after two turns |
Quality Reviewer decides inspection results and tests corrective action effectiveness independently of the person who performed the work.
Signed in as Quality Reviewer
| Decision | Approver | |
|---|---|---|
| Review inspectionQuality Reviewer accepts passing scope or rejects failed scope. | Quality Reviewer | |
| Verify effectivenessA separate reviewer tests the result before closure. | Quality Reviewer | |
| Approve Inspections, corrective actions | Quality Reviewer | |
| Approve Audits | Audit Lead | |
| Approve controlled documents | Document Controller |
Everyone opens Automotive QMS to the work that is theirs. Pick a role to see what it starts with.
Performs assigned inspections, records required checks and prepares linked specialty evidence.
This is the first screen this role sees.
PPAP submissions · Inspector
| Part number | Revision | Submission level | Customer | Status | Operational record | |
|---|---|---|---|---|---|---|
| PPP-20525 | Rev A | Level 1 | Silver Mesa Motors | Submitted | Dimensional check, pedal carrier tool 6 | |
| PPP-33299 | Rev B | Level 2 | Northcove Vehicle Works | Submitted | Weld inspection, seat frame shift B | |
| PPP-93186 | Rev C | Level 3 | Hearthline Mobility | Submitted | Incoming inspection, brake bracket lot 84 | |
| PPP-56761 | Rev D | Level 4 | Pinecrest Auto Systems | Submitted | Torque audit, suspension arm line 2 | |
| PPP-11579 | Rev E | Level 5 | Vale Harbor Transport | Submitted | Dimensional check, pedal carrier tool 6 |
Decides inspection results, reviews containment and independently tests corrective action effectiveness.
This is the first screen this role sees.
PPAP submissions · Quality Reviewer
| Part number | Revision | Submission level | Customer | Status | Operational record | |
|---|---|---|---|---|---|---|
| PPP-20525 | Rev A | Level 1 | Silver Mesa Motors | Submitted | Dimensional check, pedal carrier tool 6 | |
| PPP-33299 | Rev B | Level 2 | Northcove Vehicle Works | Submitted | Weld inspection, seat frame shift B | |
| PPP-93186 | Rev C | Level 3 | Hearthline Mobility | Submitted | Incoming inspection, brake bracket lot 84 | |
| PPP-56761 | Rev D | Level 4 | Pinecrest Auto Systems | Submitted | Torque audit, suspension arm line 2 | |
| PPP-11579 | Rev E | Level 5 | Vale Harbor Transport | Submitted | Dimensional check, pedal carrier tool 6 |
Investigates a linked issue and retains its root cause, action and completion evidence.
This is the first screen this role sees.
Corrective actions · Corrective Action Owner
Plans audits, owns reporting and checks findings before audit closure.
This is the first screen this role sees.
Audits · Audit Lead
Maintains controlled revisions and records who acknowledged the effective document.
This is the first screen this role sees.
Controlled documents · Document Controller
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Brake bracket control plan | Rev A | 26 Nov | brake_bracket_control_plan_c.pdf | Review | |
| Door hinge press work instruction | Rev B | 17 Nov | hinge_press_work_instruction_b.pdf | Review | |
| Steering link inspection standard | Rev C | 26 Nov | steering_link_inspection_d.pdf | Review | |
| Seat frame weld acceptance guide | Rev D | 19 Nov | seat_frame_weld_guide_a.pdf | Review | |
| Molded seal receiving procedure | Rev E | 08 Nov | seal_receiving_procedure_e.pdf | Review |
Maintains user and person access and can inspect the quality records for support.
Read inspection outcomes, open corrective work, audit findings and controlled evidence from their source records.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 40 | ||
| In progress | 17 | 43% | |
| Review | 7 | 41% | |
| Accepted | 2 | 29% |
Sample counts per stage
Which inspection types are being accepted or rejected, and when were they completed?
Which requirements failed and what evidence was attached?
Which issues are Critical and where are they in follow-up?
Which owner has an action due and what is its current state?
Which finding belongs to which audit, owner and due date?
Which version is Approved and when did it become effective?
Which people acknowledged a particular controlled document?
What is the state of each part revision for its named customer?
Which sample and trial produced a measured value for the linked inspection?
See how Automotive QMS fits your kind of team.
Follow incoming and final inspection decisions through part evidence and corrective action.
Review in-process quality checks, contain failures and keep corrective action tied to the source case.
Organize service inspections, controlled instructions and audits around named owners and evidence.
Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to prepare quality work while your team keeps inspection, release and effectiveness decisions.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Choose an incoming or in-process subject with known requirements and people who will perform and review the checks.
Set up users and people, inspection numbering, check requirements, severity meanings and the controlled instruction for the pilot.
Run a passing and failing inspection; require evidence before Review, then test acceptance, rejection, containment and independent effectiveness review.
Rehearse a document revision and acknowledgment, a scoped audit with findings, and linked PPAP and gauge evidence where those records fit the operating case.
Use the saved queues and reports to reconcile active issues, due actions, released documents and audit follow-up with their source cases.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure QMS for Automotive for your business. Begin with one inspection type, its required checks, an Inspector and a Quality Reviewer.
It identifies the subject, type, schedule, assignee and decision status. Linked checks hold the individual requirements, observations, results and attachments.
Quality Reviewer reads the required check evidence after Inspector submits the case to Review, then accepts eligible passing scope or rejects failed scope.
The Quality Reviewer links a rejected inspection to a nonconformance with severity and containment follow-up. Corrective action then records the cause, approved response and effectiveness review.
The owner submits implementation evidence. A separate Quality Reviewer tests effectiveness before the action and linked issue close.
Document Controller prepares a titled, versioned document with an attachment and effective date, reviews it for release and records acknowledgments by person.
Each finding references its audit and carries the requirement, observation, severity, owner and dates. Audit Lead checks the findings against scope before closing reporting.
A PPAP submission holds part number, revision, submission level, customer and status, linked to the inspection that provides its operating context.
Yes. A gauge study records the gauge, study date, appraiser, sample, trial and measured value against a linked inspection.
Agree on production subject identifiers, customer submission handling, measurement evidence and staff identity. Test each connection with a representative case.
Start free, then use Proto to change fields, steps and approvals before your team goes live.