Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- QMS for Electronics Manufacturing
- Production records
- Measurement capture
- Document storage
- Identity
QMS for Electronics Manufacturing coordinates planned inspections, their individual check results and evidence, and the quality decision on an inspected subject. An inspector works the checks and submits the inspection for review.
Inspections in one list
Quality Reviewer decides Accepted or Rejected after checking the failed evidence.
Every feature works on the same records. Pick one to see the screen your team works in.
Plan inspections, capture check evidence and give reviewers the complete decision record.
Approval conditions
| Inspection number | Subject reference | Inspection type | Scheduled at | Status | Assigned to | |
|---|---|---|---|---|---|---|
| INS-70709 | Power board lot 42 | Incoming | 16 Nov | Review | Ivy Mercer | |
| INS-98894 | Controller PCB revision D | In process | 13 Nov | Review | Lena Okafor | |
| INS-14236 | Connector J4 batch 118 | Final | 23 Nov | Review | Lena Okafor | |
| INS-23097 | Board serial 01884 | Service | 17 Nov | Review | Rafael Nwosu | |
| INS-76222 | Assembly bench 7 | Incoming | 24 Nov | Review | Mateo Park |
Attribute a defect to the board and inspection before the reviewer chooses its disposition.
Approval conditions
| Operational record | Board serial | Revision | Reference designator | Defect code | Disposition | |
|---|---|---|---|---|---|---|
| First article, controller PCB revision D | PCB-26-01884 | Rev A | R36 | SOLDER-BRIDGE | Review | |
| Rework inspection, board serial 01884 | PCB-26-01885 | Rev B | C112 | MISSING-PART | Review | |
| ESD check, assembly bench 7 | PCB-26-01902 | Rev C | J4 | VOIDING | Review | |
| First article, controller PCB revision D | PCB-26-01916 | Rev D | U7 | LIFTED-PAD | Review | |
| First article, controller PCB revision D | PCB-26-01931 | Rev E | D12 | POLARITY | Review |
Record workstation resistance with its limits and send failed readings to quality review.
ESD checks
| Operational record | Workstation | Checked at | Resistance ohms | Lower limit | Upper limit | |
|---|---|---|---|---|---|---|
| X-ray check, connector J4 batch | SMT line 2 station 4 | 28 Nov | 270 | 40 | 820 | |
| X-ray check, connector J4 batch | ESD bench 7 | 29 Nov | 230 | 590 | 540 | |
| X-ray check, connector J4 batch | Rework bay 3 | 07 Nov | 400 | 70 | 470 | |
| Coating inspection, oscillator region | Coating cell 5 | 16 Nov | 680 | 780 | 100 | |
| Coating inspection, oscillator region | Final test bench 2 | 22 Nov | 140 | 740 | 630 |
Tie failed inspection scope to containment, investigation and a reviewed disposition.
Inspections
| Inspection number | Subject reference | Inspection type | Scheduled at | Status | Assigned to | |
|---|---|---|---|---|---|---|
| INS-96063 | Power board lot 42 | Incoming | 19 Nov | Planned | Eli Rahman | |
| INS-76128 | Controller PCB revision D | In process | 15 Nov | In progress | Noah Haddad | |
| INS-99714 | Connector J4 batch 118 | Final | 20 Nov | Review | Sora Velasquez | |
| INS-45263 | Board serial 01884 | Service | 19 Nov | Accepted | Kiran Duarte | |
| INS-76977 | Assembly bench 7 | Incoming | 17 Nov | Planned | Rafael Nwosu |
Preserve the root cause, approved action and independent effectiveness decision.
Close waits for the independent reviewer
| Nonconformance | Owner | Root cause | Action | Due date | Status | |
|---|---|---|---|---|---|---|
| Bridged pads on power board lot 42 | Kiran Duarte | Stencil aperture held excess paste | Rework bridged pads and reinspect | 10 Nov | Effectiveness review | |
| Missing resistor on controller board | Rafael Nwosu | Feeder ran empty without alarm | Add feeder presence check at setup | 06 Nov | Effectiveness review | |
| Cold joint at terminal block | Amina Cho | Reflow soak time was too short | Adjust reflow profile for J4 | 16 Nov | Effectiveness review | |
| Cold joint at terminal block | Lena Okafor | Rework iron dwell exceeded instruction | Review pad repair under microscope | 17 Nov | Effectiveness review | |
| Bridged pads on power board lot 42 | Sora Velasquez | Tester lead had intermittent break | Replace wrist strap tester lead | 17 Nov | Effectiveness review |
Follow audit findings, document versions and individual training acknowledgments.
Posting waits for the quality manager
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| ESD workstation verification procedure | Rev A | 22 Nov | esd_station_check_rev_c.pdf | Draft | |
| Solder paste handling instruction | Rev B | 07 Nov | solder_paste_handling_b.pdf | Draft | |
| Board rework acceptance standard | Rev C | 24 Nov | board_rework_standard_d.pdf | Draft | |
| AOI review work instruction | Rev D | 24 Nov | aoi_review_instruction_a.pdf | Draft | |
| Conformal coating inspection plan | Rev E | 28 Nov | coating_inspection_plan_e.pdf | Draft |
Inspection to corrective action ships ready to use. 3 steps need a named approval before the work moves on: Review failed scope (Quality Reviewer), Approve corrective action (Quality Manager) and Verify effectiveness (Independent Reviewer).
Assign the inspected subject and schedule.
Capture each requirement, result and observation.
Link failed scope to its inspection when review begins.
A quality reviewer decides the inspection outcome from the recorded checks.
The quality manager accepts the plan before implementation.
An independent reviewer accepts the evidence before closure.
Open any inspection to see its board defects, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Status and Assigned to.
Each line is linked to this inspection.
Admin, Inspector and Quality Reviewer, each with their own permissions.
Plan inspection and Record check evidence, with the role that acts.
Review failed scope and Approve corrective action, with who decides.
Incoming
| Operational record | Board serial | Revision |
|---|---|---|
| First article, controller PCB revision D | PCB-26-01884 | Rev A |
| Rework inspection, board serial 01884 | PCB-26-01885 | Rev B |
| ESD check, assembly bench 7 | PCB-26-01902 | Rev C |
Signed in as Quality Reviewer
| Decision | Approver | |
|---|---|---|
| Review failed scopeA quality reviewer decides the inspection outcome from the recorded checks. | Quality Reviewer | |
| Approve corrective actionThe quality manager accepts the plan before implementation. | Quality Manager | |
| Verify effectivenessAn independent reviewer accepts the evidence before closure. | Independent Reviewer | |
| Approve Inspections | Quality Reviewer | |
| Approve corrective actions | Independent Reviewer | |
| Approve corrective actions, controlled documents | Quality Manager |
Everyone opens QMS for Electronics Manufacturing to the work that is theirs. Pick a role to see what it starts with.
Configures access and maintains the People and Users directory for the quality team.
Performs assigned inspections, records check evidence and captures workstation and board observations.
This is the first screen this role sees.
Inspections · Inspector
Reviews inspection evidence, contains failed scope and decides board defect and ESD dispositions.
This is the first screen this role sees.
Inspections · Quality Reviewer
Investigates the nonconformance linked to an owned corrective action and records root cause and action.
This is the first screen this role sees.
Corrective actions · Corrective Action Owner
Reviews approved corrective action and accepts effectiveness before closure.
This is the first screen this role sees.
Corrective actions · Independent Reviewer
Sets quality priorities and oversees audit, document and corrective action decisions.
This is the first screen this role sees.
Controlled documents · Quality Manager
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| ESD workstation verification procedure | Rev A | 22 Nov | esd_station_check_rev_c.pdf | Draft | |
| Solder paste handling instruction | Rev B | 07 Nov | solder_paste_handling_b.pdf | Draft | |
| Board rework acceptance standard | Rev C | 24 Nov | board_rework_standard_d.pdf | Draft | |
| AOI review work instruction | Rev D | 24 Nov | aoi_review_instruction_a.pdf | Draft | |
| Conformal coating inspection plan | Rev E | 28 Nov | coating_inspection_plan_e.pdf | Draft |
Read quality workload and failure patterns from the underlying records.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 31 | ||
| In progress | 9 | 29% | |
| Review | 3 | 33% | |
| Accepted | 1 | 33% |
Sample counts per stage
Which Incoming, in process, Final or Service inspections are still awaiting work or review?
Which requirements fail, and what observation and attachment explain each case?
Which workstation readings were marked Fail against their recorded ranges?
Which defect codes and board revisions lead to Review, Rework, Scrap or Accepted?
Which cases remain in Containment, Investigation or Disposition?
Which owner has an action due while it is still active?
Which findings and owners sit under each audit?
Which people acknowledged a particular controlled document version, and when?
See how QMS for Electronics Manufacturing fits your kind of team.
Keep in-process board observations tied to inspection and disposition.
Capture ESD readings with the workstation, inspection and limits used for each check.
Coordinate inspections, corrective work, audits and controlled instructions for an electronics operation.
Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to prepare quality work and point people to the records behind each decision.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Agree inspection subject references, inspection types, requirement wording, evidence rules and named reviewers. Enter People and Users before assigning work.
Create a planned inspection with linked checks, submit it for review and verify both Accepted and Rejected outcomes. Trace a failed check into a linked nonconformance.
Capture a board defect with serial, revision and reference designator. Capture ESD Pass and Fail readings with the workstation, measurement and limits. Review each against its operational inspection.
Assign an owner to the linked corrective action, record root cause and proposed action, obtain plan approval and test independent effectiveness review.
Add an audit with a finding, a controlled document version and a person’s training acknowledgment. Check the reports against their source records.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Scope, rollout and pricing for QMS for Electronics Manufacturing.
All questionsClick Get started, then use Proto to configure QMS for Electronics Manufacturing for your business. Start with one inspection type, a named inspector and reviewer, and a real failed-check case that can be followed into containment.
An inspection records its subject, type, schedule, assignee and status. Linked checks carry requirements, observations, results and evidence for the review decision.
Inspector submits the inspection at Review with its check evidence. At Review, Quality Reviewer checks failed scope and opens a linked nonconformance in Containment before deciding the inspection outcome.
Yes. Capture board serial, revision, reference designator and defect code against an inspection, then send the attributed observation for disposition.
Each check records its workstation, date, resistance and lower and upper limits. An out-of-limits reading is Fail and goes to quality review; an in-limits reading remains Pass.
The corrective action references the nonconformance, which references the inspection. Its owner records root cause, action and due date. The independent reviewer examines effectiveness evidence before closure.
Independent Reviewer accepts effectiveness after the owner submits the action for review. Quality Manager approves the action plan before implementation.
Yes. Findings stay under their audit with requirement, observation, severity, owner and due date. Audit status and finding closure are reviewed separately.
A training acknowledgment connects a person with a controlled document and the date acknowledged. Keep document versions distinct so the record identifies what the person received.
Rehearse a passing inspection, a failed inspection with check evidence, an ESD Fail, a board disposition and a corrective action whose effectiveness needs independent review.
Start free, then use Proto to change fields, steps and approvals before your team goes live.