Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Textiles and Apparel QMS
- Production records
- Supplier records
- Laboratory evidence
- Document storage
QMS for Textiles and Apparel coordinates inspections of textile and garment work, the checks and evidence behind each decision, and the corrective work that follows a rejection. An inspector starts a planned inspection, records requirement-level results, and submits the case for review.
Inspections in one list
Quality Reviewer decides the inspection outcome.
Every feature works on the same records. Pick one to see the screen your team works in.
Assign textile and garment inspections, collect evidence and route each case to a quality decision.
Approval conditions
| Inspection number | Subject reference | Inspection type | Assigned to | Status | |
|---|---|---|---|---|---|
| INS-57043 | Navy twill lot NT-24 | Incoming | Daniel Kim | Review | |
| INS-80622 | Jacket style Harbor 6 | In process | Priya Nair | Review | |
| INS-54520 | Jersey roll JR-18 | Final | Nadia Rahman | Review | |
| INS-41977 | Trouser batch LT-42 | Service | Jonas Berg | Review | |
| INS-99801 | Zipper lot ZP-771 | Incoming | Sofia Petrov | Review |
Keep each requirement, result, observation and evidence item with its inspection decision.
Inspection checks
| Inspection | Requirement | Observation | Result | Evidence | |
|---|---|---|---|---|---|
| Cotton jersey shade check | Shade within approved sample | Shade matches approved swatch | Pending | navy-twill-shade-photo.jpg | |
| Navy twill roll arrival inspection | Seam strength at least 110 N | One seam puckers at hem | Fail | jacket-seam-test.pdf | |
| Linen trouser final inspection | Care label matches fiber content | Label position meets spec | Pending | linen-care-label.jpg | |
| Denim shirt measurement inspection | Fabric width within 1 cm tolerance | Roll edge shows light fraying | Fail | roll-width-log.xlsx | |
| Cotton jersey shade check | All needles accounted for | Zipper closes smoothly | Pending | zipper-pull-sample.jpg |
Attribute roll length, width and defect points to the inspection that owns the quality decision.
Fabric inspections
| Roll number | Style | Inspected length | Defect points | Width | Unit | |
|---|---|---|---|---|---|---|
| FI-33939 | Harbor field jacket | 510 | 190 | 940 | Roll | |
| FI-61336 | Ridge cotton tee | 480 | 790 | 880 | Meter | |
| FI-45185 | Solstice linen trouser | 810 | 710 | 170 | Yard | |
| FI-49505 | Cove denim shirt | 350 | 750 | 770 | Panel | |
| FI-74752 | Morrow knit polo | 70 | 230 | 570 | Swatch |
Compare garment observations with nominal measurements and tolerances in the inspection case.
Garment measurements
| Style | Size | Measurement point | Nominal | Observed | Tolerance | |
|---|---|---|---|---|---|---|
| Harbor field jacket | XS | Chest width | 460 | 210 | 770 | |
| Ridge cotton tee | S | Body length | 750 | 800 | 680 | |
| Solstice linen trouser | M | Sleeve length | 90 | 580 | 30 | |
| Cove denim shirt | L | Waist circumference | 460 | 50 | 290 | |
| Morrow knit polo | XL | Inseam length | 520 | 90 | 240 |
Contain rejected scope, approve a correction plan and close only after independent effectiveness review.
Nonconformances
| Detected at | Severity | Description | Status | Inspection | |
|---|---|---|---|---|---|
| 25 Nov | Critical | Shade varies across three rolls | Open | Linen trouser final inspection | |
| 17 Nov | Critical | Side seam opened during pull test | Containment | Spring jacket preproduction inspection | |
| 20 Nov | Critical | Care label omits cold wash | Investigation | Navy twill roll arrival inspection | |
| 22 Nov | Critical | Usable fabric width is 2 cm short | Disposition | Zipper lot incoming inspection | |
| 24 Nov | Critical | Zipper pull detached on five units | Closed | Zipper lot incoming inspection |
Plan textile quality audits, assign requirement-linked findings and close after finding resolution.
Audit findings
| Audit | Requirement | Finding | Severity | Owner | Due date | |
|---|---|---|---|---|---|---|
| Sewing line quality audit | Shade within approved sample | Shade cards lack second approval | Observation | Jonas Berg | 18 Nov | |
| Cutting room process audit | Seam strength at least 110 N | Needle log missing shift signoff | Minor | Sofia Petrov | 25 Nov | |
| Dyehouse chemical control audit | Care label matches fiber content | Two rolls have no test record | Major | Maya Desai | 21 Nov | |
| Supplier fabric mill audit | Fabric width within 1 cm tolerance | Rejected pieces mixed with accepted stock | Observation | Maya Desai | 05 Nov | |
| Cutting room process audit | All needles accounted for | Packing check skipped on night shift | Minor | Amara Okafor | 17 Nov |
Review and release quality document revisions while retaining acknowledgments tied to documents.
Controlled documents
| Title | Version | Effective date | Status | |
|---|---|---|---|---|
| Fabric shade approval procedure | Rev 1.0 | 05 Nov | Review | |
| Garment measurement work instruction | Rev 1.1 | 12 Nov | Review | |
| Needle control policy | Rev 2.0 | 27 Nov | Review | |
| Incoming yarn inspection plan | Rev 2.1 | 06 Nov | Review | |
| Final packing checklist | Rev 3.0 | 06 Nov | Review |
Inspection to verified correction ships ready to use. 3 steps need a named approval before the work moves on: Inspection review (Quality Reviewer), Action approval (Quality Manager) and Effectiveness decision (Quality Reviewer).
Assign the subject and inspector before checking begins.
Keep requirement results and fabric or garment detail with the inspection.
Quality Reviewer accepts passing scope or rejects failed scope.
Give rejected scope a linked case and severity, then name the action owner.
Quality Manager approves the correction plan before implementation.
An independent Quality Reviewer checks whether the correction worked.
Open any inspection to see its fabric inspections, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Assigned to and Status.
Each line is linked to this inspection.
Admin, Inspector and Quality Reviewer, each with their own permissions.
Inspection planning and Inspection start, with the role that acts.
Inspection review and Action approval, with who decides.
Incoming
| Roll number | Style | Inspected length |
|---|---|---|
| FI-33939 | Harbor field jacket | 510 |
| FI-61336 | Ridge cotton tee | 480 |
| FI-45185 | Solstice linen trouser | 810 |
Quality Manager approves a correction plan before work; an independent Quality Reviewer tests effectiveness later.
Signed in as Quality Reviewer
| Decision | Approver | |
|---|---|---|
| Inspection reviewQuality Reviewer accepts passing scope or rejects failed scope. | Quality Reviewer | |
| Action approvalQuality Manager approves the correction plan before implementation. | Quality Manager | |
| Effectiveness decisionAn independent Quality Reviewer checks whether the correction worked. | Quality Reviewer | |
| Approve Inspections, corrective actions | Quality Reviewer | |
| Approve corrective actions, controlled documents | Quality Manager |
Everyone opens Textiles and Apparel QMS to the work that is theirs. Pick a role to see what it starts with.
Configures access and quality reference data while preserving named decision owners.
Runs assigned inspections and records checks, fabric evidence and garment measurements.
This is the first screen this role sees.
Inspections · Inspector
Decides inspection disposition and independently tests corrective action effectiveness.
This is the first screen this role sees.
Inspections · Quality Reviewer
Approves corrective action plans and controlled document revisions.
This is the first screen this role sees.
Controlled documents · Quality Manager
| Title | Version | Effective date | Status | |
|---|---|---|---|---|
| Fabric shade approval procedure | Rev 1.0 | 23 Nov | Draft | |
| Garment measurement work instruction | Rev 1.1 | 19 Nov | Draft | |
| Needle control policy | Rev 2.0 | 20 Nov | Draft | |
| Incoming yarn inspection plan | Rev 2.1 | 23 Nov | Draft | |
| Final packing checklist | Rev 3.0 | 07 Nov | Draft |
Investigates a linked nonconformance and records implementation evidence.
This is the first screen this role sees.
Nonconformances · Corrective Action Owner
Plans audits and records requirement-linked findings.
This is the first screen this role sees.
Audits · Auditor
Prepares document revisions and collects training acknowledgments.
This is the first screen this role sees.
Controlled documents · Document Coordinator
| Title | Version | Effective date | Status | |
|---|---|---|---|---|
| Fabric shade approval procedure | Rev 1.0 | 23 Nov | Draft | |
| Garment measurement work instruction | Rev 1.1 | 19 Nov | Draft | |
| Needle control policy | Rev 2.0 | 20 Nov | Draft | |
| Incoming yarn inspection plan | Rev 2.1 | 23 Nov | Draft | |
| Final packing checklist | Rev 3.0 | 07 Nov | Draft |
Read inspection outcomes, failed requirements, corrective work and audit closure from the underlying quality records.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 35 | ||
| In progress | 12 | 34% | |
| Review | 3 | 25% | |
| Accepted | 1 | 33% |
Sample counts per stage
Which incoming, in-process and final cases were accepted or rejected?
Which requirements produced failed observations?
Which rolls have high defect points in the inspected length?
Where did observed measurements differ from nominal values?
Groups cases by severity and current status.
Which owners have work due or awaiting effectiveness review?
Which requirements still have open findings?
Shows document version and status with linked people and acknowledgment dates.
See how Textiles and Apparel QMS fits your kind of team.
Inspect fabric rolls, retain defect evidence and route failed scope into corrective work.
Review garment measurements by style, size and point before accepting production scope.
Bring incoming inspection evidence, audit findings and corrective action decisions into one quality process.
Each stage of inspection to verified correction names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to prepare quality views and explain linked evidence while people retain approval decisions.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Choose Incoming, InProcess, Final or Service inspection work for the first cycle and agree subject reference conventions.
Name required checks, fabric measurement units, garment points and tolerances, and the acceptance rule reviewers apply.
Link People to Users and identify Inspector, Quality Reviewer, Quality Manager, Corrective Action Owner, Auditor and Document Coordinator.
Release controlled instructions, create the first audit scopes and identify acknowledgment recipients.
Run a passing case, a failed case, a correction plan and an independent effectiveness review.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure QMS for Textiles and Apparel for your business. Start with one inspection type, its required checks, named inspector and reviewer, and a passing and failing rehearsal case.
Quality Reviewer reads the requirement checks and linked fabric or garment evidence, then accepts eligible passing scope or rejects failed scope.
Inspector records roll number, style, inspected length, defect points, width and unit against the selected inspection. Submission sends that linked inspection to Review.
Yes. Each garment measurement links style, size, point, nominal, observed and tolerance to the inspection that receives the decision.
The reviewer rejects failed scope and opens a nonconformance linked to the inspection, with severity; the follow-up action names its owner.
Quality Manager approves the planned action before implementation. An independent Quality Reviewer tests effectiveness before the action and linked case close.
Auditor closes the audit after every finding linked to it has been closed.
Document Coordinator prepares a new version for Review. Quality Manager approves release, and earlier training acknowledgments remain tied to their documents.
Attach supporting evidence to the relevant inspection check and agree a connection for any external laboratory system your team uses.
Start free, then use Proto to change fields, steps and approvals before your team goes live.