Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Hotels and Hospitality QMS
- Property operations
- Guest service
- Document storage
A hospitality quality team can plan an inspection, assign a person, and collect linked check results and evidence. The reviewer accepts the inspected work or rejects it.
Inspections in one list
Quality Manager decides whether to accept or reject the inspection.
Every feature works on the same records. Pick one to see the screen your team works in.
Plan service inspections, capture linked checks and review acceptance.
Approval conditions
| Inspection number | Subject reference | Completed at | Status | Assigned to | |
|---|---|---|---|---|---|
| INS-90411 | Suite 204 at Westbank House | Review | Owen Chen | ||
| INS-99704 | Pool gate at Cedar Quay | Review | Mei Rivera | ||
| INS-22554 | Harborlight breakfast buffet | Review | Darius Mensah | ||
| INS-29153 | Floor 6 at Willow Court | Review | Elena Park | ||
| INS-83514 | East wing linen room | Review | Darius Mensah |
Keep rejection, containment and investigation tied to the inspection.
Nonconformances
| Detected at | Severity | Description | Status | Inspection | |
|---|---|---|---|---|---|
| 05 Nov | Critical | Air filter change was overdue | Open | Spa treatment room check, room 3 | |
| 06 Nov | Critical | Pool gate failed self-close test | Containment | Breakfast service check, terrace | |
| 09 Nov | Critical | Buffet food measured 9 C | Investigation | Breakfast service check, terrace | |
| 09 Nov | Critical | Exit sign was unlit | Disposition | Spa treatment room check, room 3 | |
| 09 Nov | Critical | Linen cart blocked fire exit | Closed | Guest room inspection, suite 204 |
Approve a linked response and check effectiveness before closure.
Approval waits for the quality manager
| Root cause | Action | Due date | Status | Nonconformance | Owner | |
|---|---|---|---|---|---|---|
| Filter replacement missed handover | Replace filter and inspect nearby rooms | 17 Nov | Planned | Suite 204 air filter overdue | Owen Chen | |
| Gate spring lost tension | Repair latch and retest gate | 08 Nov | Planned | Spa sink lacks hand soap | Leila Moreno | |
| Buffet chiller fan failed | Discard food and service chiller | 20 Nov | Planned | Suite 204 air filter overdue | Mei Rivera | |
| Exit sign battery expired | Replace battery and verify sign | 19 Nov | Planned | Suite 204 air filter overdue | Mei Rivera | |
| Cart parking area was not marked | Mark cart bay and brief linen crew | 23 Nov | Planned | Clean linen stored near chemicals | Owen Chen |
Plan scope, record findings by requirement and retain the close decision.
Audit findings
| Requirement | Finding | Severity | Due date | Closed at | Audit | |
|---|---|---|---|---|---|---|
| Room ready checklist item 4.2 | Room filter log missing two dates | Observation | 18 Nov | 17 Nov | Westbank guest room standards audit | |
| Pool gate closes from any angle | Gate test not recorded on Sunday | Minor | 15 Nov | 17 Nov | Westbank guest room standards audit | |
| Cold buffet held at or below 5 C | Buffet temperature log had a gap | Major | 26 Nov | 17 Nov | Breakfast allergen labeling audit | |
| Exit signs illuminated at all times | Exit sign check omitted floor 6 | Observation | 16 Nov | 17 Nov | Pool operations compliance audit | |
| Fire exit kept clear of storage | Linen cart stored at exit door | Minor | 18 Nov | 17 Nov | Breakfast allergen labeling audit |
Review revisions and see who acknowledged each controlled document.
Approval waits for the quality manager
| Title | Version | Effective date | Status | Document | |
|---|---|---|---|---|---|
| Guest room readiness standard | Rev A | 08 Nov | Review | room_readiness_rev_c.pdf | |
| Pool deck opening checklist | Rev B | 23 Nov | Review | pool_opening_checklist_b.pdf | |
| Breakfast food safety procedure | Rev C | 13 Nov | Review | breakfast_food_safety_d.pdf | |
| Emergency exit inspection guide | Rev D | 16 Nov | Review | exit_inspection_guide_a.pdf | |
| Linen handling work instruction | Rev E | 16 Nov | Review | linen_handling_rev_e.pdf |
Record property, room and standard results alongside the inspection.
Property checks
| Property name | Room number | Standard code | Checked at | Result | Operational record | |
|---|---|---|---|---|---|---|
| Westbank House, suite 204 | PC-62049 | ROOM-READY-04 | 15 Nov | Fail | Elevator lobby inspection, floor 6 | |
| Harborlight Hotel, kitchen | PC-20622 | POOL-SAFE-02 | 07 Nov | Fail | Kitchen sanitation check, Harborlight | |
| Willow Court Inn, floor 6 | PC-26137 | FOOD-COLD-07 | 29 Nov | Fail | Linen room inspection, east wing | |
| Cedar Quay Suites, pool deck | PC-15938 | FIRE-EXIT-01 | 09 Nov | Fail | Linen room inspection, east wing | |
| North Terrace Lodge, linen room | PC-61459 | LINEN-STORE-03 | 05 Nov | Fail | Breakfast service check, terrace |
Keep guest impact tied to a property, stay reference and inspection.
Guest service issues
| Property name | Stay reference | Category | Opened at | Resolved at | Guest impact | |
|---|---|---|---|---|---|---|
| Westbank House | Stay 26418 | Room comfort | 07 Nov | 08 Nov | Room change required | |
| Harborlight Hotel | Stay 26435 | Housekeeping | 13 Nov | 17 Nov | Breakfast service delayed | |
| Willow Court Inn | Stay 26462 | Dining service | 11 Nov | 13 Nov | Guest waited 35 minutes | |
| Cedar Quay Suites | Stay 26501 | Noise complaint | 15 Nov | 17 Nov | Spa booking rescheduled | |
| North Terrace Lodge | Stay 26517 | Accessibility | 17 Nov | 17 Nov | Accessible route unavailable |
Inspection to corrective action ships ready to use. 2 steps need a named approval before the work moves on: Review inspection (Quality Manager) and Approve corrective action (Quality Manager).
Schedule the case and name its Inspector.
Keep requirement results and evidence with the inspection.
Send the completed checks to review.
The Quality Manager accepts or rejects the case.
Follow a rejection into linked containment and investigation.
Review root cause and the parent issue before approval.
Open any inspection to see its guest service issues, the roles that work on it, its process stages and its approvals on one page.
Scheduled at, Status and Assigned to.
Each line is linked to this inspection.
Quality Manager, Inspector and Corrective Action Owner, each with their own permissions.
Plan inspection and Record checks, with the role that acts.
Review inspection and Approve corrective action, with who decides.
Incoming
| Property name | Stay reference | Category |
|---|---|---|
| Westbank House | Stay 26418 | Room comfort |
| Harborlight Hotel | Stay 26435 | Housekeeping |
| Willow Court Inn | Stay 26462 | Dining service |
Inspectors record checks; the Quality Manager makes acceptance and corrective action approval decisions.
Signed in as Quality Manager
| Decision | Approver | |
|---|---|---|
| Review inspectionThe Quality Manager accepts or rejects the case. | Quality Manager | |
| Approve corrective actionReview root cause and the parent issue before approval. | Quality Manager | |
| Approve corrective actions | Quality Manager |
Everyone opens Hotels and Hospitality QMS to the work that is theirs. Pick a role to see what it starts with.
Owns inspection decisions, corrective action approval and effectiveness review.
This is the first screen this role sees.
Inspections · Quality Manager
Carries out assigned inspections and records check evidence.
This is the first screen this role sees.
Inspections · Inspector
Investigates a linked nonconformance and maintains the action plan.
This is the first screen this role sees.
Nonconformances · Corrective Action Owner
Plans audits and records findings and follow-up ownership.
This is the first screen this role sees.
Audits · Auditor
Reviews controlled revisions and tracks acknowledgment records.
This is the first screen this role sees.
Controlled documents · Document Controller
| Title | Version | Effective date | Status | Document | |
|---|---|---|---|---|---|
| Guest room readiness standard | Rev A | 08 Nov | Review | room_readiness_rev_c.pdf | |
| Pool deck opening checklist | Rev B | 23 Nov | Review | pool_opening_checklist_b.pdf | |
| Breakfast food safety procedure | Rev C | 13 Nov | Review | breakfast_food_safety_d.pdf | |
| Emergency exit inspection guide | Rev D | 16 Nov | Review | exit_inspection_guide_a.pdf | |
| Linen handling work instruction | Rev E | 16 Nov | Review | linen_handling_rev_e.pdf |
Records local property evidence and coordinates the people involved.
This is the first screen this role sees.
Inspections · Property Manager
Maintains access and the people directory.
Answer inspection, issue, audit and document questions from the recorded work.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 27 | ||
| In progress | 7 | 26% | |
| Review | 2 | 29% | |
| Accepted | 1 | 50% |
Sample counts per stage
Compare accepted and rejected inspections by inspection type and completion date.
Review pass and fail results with their inspection and recorded evidence.
Find failed property checks by property, room and standard code.
Review guest service issue categories, impact and resolution dates by property.
Compare open nonconformances by severity and detection date.
Review action status and due date by owner and linked nonconformance.
See findings, severity and due date under each audit and owner.
See acknowledgment dates and people under each controlled document.
See how Hotels and Hospitality QMS fits your kind of team.
Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to help prepare and inspect quality work with human decisions retained.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Select a property and service area, agree subject references, standard codes and issue categories.
Add the team, assign responsibilities and rehearse the inspection and approval decisions.
Bring in controlled documents, inspection requirements and current open work with their required links.
Run an accepted inspection, a rejected inspection with corrective action, an audit and a document revision.
Check reports and linked evidence with the people who will own daily work.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure QMS for Hotels and Hospitality for your business. Start with one property and one inspection path, then rehearse a review decision with linked check evidence.
The Inspector records the inspection and linked requirement checks, then submits the case for a Quality Manager decision.
Yes. A property check records the room, standard and result and points to the inspection for that operating event.
Use a guest service issue for property, stay reference, category, impact and resolution date. Link it to the related inspection.
A linked nonconformance enters containment, preserving the inspection as the source for investigation.
The Quality Manager verifies the linked nonconformance and root cause before approving the plan.
The Quality Manager reviews retained evidence when the action reaches effectiveness review, then closes it and the parent issue.
Audit findings have their own owner, due date and close date, so follow-up remains visible after audit reporting.
A controlled document records title, version, attachment, effective date and status. Acknowledgments link people to that document.
Review inspection decisions, property exceptions, corrective action due dates and open audit findings with their underlying records.
Start free, then use Proto to change fields, steps and approvals before your team goes live.