Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Medical Devices QMS
- Manufacturing or service records
- Supplier document source
- Document repository
- Identity management
QMS for Medical Devices brings inspection work and its evidence into a traceable quality record. Inspectors plan incoming, in-process, final or service inspections, record each requirement check with observations and attachments, and submit the inspection for review.
close waits for the quality reviewer
| Root cause | Action | Due date | Status | Nonconformance | Owner | |
|---|---|---|---|---|---|---|
| Extrusion die drifted after changeover | Quarantine tubing and verify wall gauge | 23 Nov | Effectiveness review | Valve connector thread out of tolerance | Lena Calder | |
| Clamp fixture pin was worn | Sort clamps and adjust assembly fixture | 06 Nov | Effectiveness review | Sterile tray seal channel leak | Nina Duarte | |
| Sealer jaw pressure was uneven | Reset heat sealer and retest trays | 13 Nov | Effectiveness review | Sterile tray seal channel leak | Evan Mensah | |
| Threading insert exceeded tool life | Replace threading tool and reinspect | 20 Nov | Effectiveness review | Guidewire coating nick found | Lena Calder | |
| Display calibration profile was stale | Calibrate display and repeat test | 13 Nov | Effectiveness review | Monitor display fails brightness test | Daniel Iyer |
Quality Reviewer decides acceptance or rejection from the inspection checks.
Every feature works on the same records. Pick one to see the screen your team works in.
Follow incoming, in-process, final and service inspections from assignment through reviewer disposition.
Approval conditions
| Inspection number | Subject reference | Inspection type | Scheduled at | Assigned to | |
|---|---|---|---|---|---|
| INS-22848 | Catheter tubing lot 261 | Incoming | 23 Nov | Amir Voss | |
| INS-49873 | Infusion set lot 884 | In process | 23 Nov | Tariq Chen | |
| INS-44810 | Sterile tray batch 41 | Final | 20 Nov | Tariq Chen | |
| INS-22570 | Valve connector lot 73 | Service | 16 Nov | Evan Mensah | |
| INS-10529 | Portable monitor 118 | Incoming | 19 Nov | Lena Calder |
Keep failed inspection scope, containment, root cause and effectiveness review connected.
Approval conditions
| Inspection number | Subject reference | Inspection type | Assigned to | Status | |
|---|---|---|---|---|---|
| INS-29985 | Catheter tubing lot 261 | Incoming | Tariq Chen | Review | |
| INS-19314 | Infusion set lot 884 | In process | Tariq Chen | Review | |
| INS-13596 | Sterile tray batch 41 | Final | Evan Mensah | Review | |
| INS-87003 | Valve connector lot 73 | Service | Maya Nwosu | Review | |
| INS-13290 | Portable monitor 118 | Incoming | Priya Park | Review |
Review a device lot's record package against the inspection that identifies its operational scope.
Approval conditions
| Device lot | Device identifier | Record package | Reviewed at | Status | Operational record | |
|---|---|---|---|---|---|---|
| INF-26-0884 | UDI-DI 00815472000126 | dhr_infusion_set_0884.pdf | 27 Nov | Pending | Final inspection, infusion set lot 884 | |
| CATH-26-0261 | UDI-DI 00815472000133 | dhr_catheter_tubing_0261.pdf | 18 Nov | Pending | Label review, sensor kit batch 206 | |
| TRAY-26-0041 | UDI-DI 00815472000140 | dhr_sterile_tray_0041.pdf | 29 Nov | Pending | Service check, portable monitor 118 | |
| VALVE-26-0073 | UDI-DI 00815472000157 | dhr_valve_connector_0073.pdf | 08 Nov | Pending | Final check, suction tip lot 919 | |
| WIRE-26-0052 | UDI-DI 00815472000164 | dhr_guidewire_0052.pdf | 08 Nov | Pending | Final inspection, infusion set lot 884 |
Keep component certificate evidence, expiry and supplier identity with the related inspection.
Supplier certificates
| Supplier | Component code | Certificate type | Expiry date | Certificate | Operational record | |
|---|---|---|---|---|---|---|
| Cedar Vale Polymer Works | TUBE-041 catheter liner | Certificate of conformity | 05 Nov | tubing_lot_261_coc.pdf | Seal test, sterile tray batch 41 | |
| Harborline Sterile Packaging | TRAY-018 sterile base | Sterilization certificate | 07 Nov | tray_batch_41_sterilization.pdf | Dimensional check, valve connector 73 | |
| Northfield Precision Tubing | CLAMP-072 flow clamp | Material test report | 06 Nov | clamp_lot_884_material.pdf | Seal test, sterile tray batch 41 | |
| Willow Crest Molded Parts | VALVE-033 connector | Biocompatibility statement | 08 Nov | valve_lot_73_dimensions.pdf | Visual check, guidewire lot 52 | |
| Stone Quay Sensor Components | SENSOR-024 electrode | Dimensional inspection report | 05 Nov | sensor_batch_206_biocomp.pdf | Seal test, sterile tray batch 41 |
Keep controlled document versions and staff acknowledgments in a shared quality record.
Approval conditions
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Catheter tubing incoming inspection | Rev A | 12 Nov | tubing_incoming_rev_c.pdf | Review | |
| Infusion set device master record | Rev B | 24 Nov | infusion_set_dmr_rev_b.pdf | Review | |
| Sterile barrier seal test method | Rev C | 25 Nov | sterile_seal_method_rev_d.pdf | Review | |
| Valve connector dimensional plan | Rev D | 29 Nov | connector_inspection_rev_a.pdf | Review | |
| Portable monitor service checklist | Rev E | 13 Nov | monitor_service_rev_e.pdf | Review |
Plan internal or supplier quality audits and keep each finding assigned to an owner.
Audit findings
| Audit | Requirement | Finding | Severity | Due date | Closed at | |
|---|---|---|---|---|---|---|
| Connector inspection process audit | Tubing wall at least 0.35 mm | One device history record lacked signoff | Observation | 05 Nov | 06 Nov | |
| Sterile barrier validation audit | Clamp holds under 20 N pull | Seal test log missed a cavity | Minor | 10 Nov | 13 Nov | |
| CAPA closure evidence audit | Tray seal passes dye penetration | Tubing cert lacked resin lot | Major | 14 Nov | 15 Nov | |
| Connector inspection process audit | Thread passes ring gage M12 | Connector gage check was overdue | Observation | 15 Nov | 16 Nov | |
| Supplier tubing traceability audit | Display at least 400 cd per m2 | Service record omitted brightness value | Minor | 09 Nov | 10 Nov |
Inspection to corrective action ships ready to use. 2 steps need a named approval before the work moves on: Disposition inspection (Quality Reviewer) and Verify effectiveness (Quality Reviewer).
Assign the subject, type and inspector.
Capture each requirement, observation and result.
Send the completed inspection to its reviewer.
Accept passing scope or reject failed scope.
Link the nonconformance and carry out its action.
Close the action after the reviewer accepts its effect.
Open any corrective action to see the roles that work on it, its process stages and its approvals on one page.
Action, Due date, Nonconformance and Owner.
Records linked to this corrective action.
Admin, Quality Reviewer and Corrective Action Owner, each with their own permissions.
Correct failed scope and Approve action, with the role that acts.
Disposition inspection and Verify effectiveness, with who decides.
Quarantine tubing and verify wall gauge · Effectiveness review
Inspector submits inspection evidence; Quality Reviewer decides its disposition.
Signed in as Quality Reviewer
| Decision | Approver | |
|---|---|---|
| Disposition inspectionAccept passing scope or reject failed scope. | Quality Reviewer | |
| Verify effectivenessClose the action after the reviewer accepts its effect. | Quality Reviewer | |
| Approve Inspections, corrective actions | Quality Reviewer |
Everyone opens Medical Devices QMS to the work that is theirs. Pick a role to see what it starts with.
Configures access and the quality workspace.
Performs assigned inspections and submits their evidence.
This is the first screen this role sees.
Device history reviews · Inspector
| Device lot | Device identifier | Record package | Reviewed at | Status | Operational record | |
|---|---|---|---|---|---|---|
| INF-26-0884 | UDI-DI 00815472000126 | dhr_infusion_set_0884.pdf | 27 Nov | Pending | Final inspection, infusion set lot 884 | |
| CATH-26-0261 | UDI-DI 00815472000133 | dhr_catheter_tubing_0261.pdf | 18 Nov | Pending | Label review, sensor kit batch 206 | |
| TRAY-26-0041 | UDI-DI 00815472000140 | dhr_sterile_tray_0041.pdf | 29 Nov | Pending | Service check, portable monitor 118 | |
| VALVE-26-0073 | UDI-DI 00815472000157 | dhr_valve_connector_0073.pdf | 08 Nov | Pending | Final check, suction tip lot 919 | |
| WIRE-26-0052 | UDI-DI 00815472000164 | dhr_guidewire_0052.pdf | 08 Nov | Pending | Final inspection, infusion set lot 884 |
Decides inspection disposition and checks corrective action effectiveness.
This is the first screen this role sees.
Device history reviews · Quality Reviewer
Investigates failed scope and carries out the assigned action.
This is the first screen this role sees.
Nonconformances · Corrective Action Owner
Maintains controlled revisions and follows acknowledgments.
This is the first screen this role sees.
Controlled documents · Document Controller
| Title | Version | Effective date | Document | Status | |
|---|---|---|---|---|---|
| Catheter tubing incoming inspection | Rev A | 12 Nov | tubing_incoming_rev_c.pdf | Review | |
| Infusion set device master record | Rev B | 24 Nov | infusion_set_dmr_rev_b.pdf | Review | |
| Sterile barrier seal test method | Rev C | 25 Nov | sterile_seal_method_rev_d.pdf | Review | |
| Valve connector dimensional plan | Rev D | 29 Nov | connector_inspection_rev_a.pdf | Review | |
| Portable monitor service checklist | Rev E | 13 Nov | monitor_service_rev_e.pdf | Review |
Plans audits and records findings against requirements.
This is the first screen this role sees.
Audits · Auditor
Answer questions about inspection decisions, follow-up, device history and evidence dates.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 46 | ||
| Approved | 22 | 48% | |
| Implementing | 14 | 64% | |
| Effectiveness review | 8 | 57% |
Sample counts per stage
Show accepted and rejected inspections by inspection type and completed date.
Group failed checks by inspection and requirement.
Compare open issues by severity and detected date.
Show owner, due date and current status for each action.
Show lot and device identifier by review status and reviewed date.
List suppliers, component codes and expiry dates with linked inspections.
Show title, version, effective date and current status.
Group findings and due dates by audit and owner.
See how Medical Devices QMS fits your kind of team.
Connect in-process and final inspections with lot history review and corrective follow-up.
Keep incoming inspection checks and supplier certificates with the component quality decision.
Record service inspection evidence and trace rejected work into corrective action.
Each stage of inspection to corrective action names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Use Proto to prepare quality records and surface decisions for the responsible people.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 12 tablesStart with one team and one process, then add the rest once the basics are running.
Choose an incoming or final inspection with a known subject reference, assigned Inspector and Quality Reviewer.
Set up Users and People, then load the controlled instruction and any supplier certificate or device history package needed for the case.
Record requirement checks, submit the inspection and have the reviewer accept or reject its scope.
Open a linked nonconformance, assign a corrective action owner and carry the action through effectiveness review.
Add audit findings, training acknowledgments and more inspection types after the core case is clear.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure QMS for Medical Devices for your business. Pilot one incoming or final inspection with its requirement checks, evidence and reviewer decision before adding more quality work.
The inspection type can be Incoming, in process, Final or Service. Each inspection has a subject reference, schedule, assigned person and status.
Inspection checks sit beneath an inspection. Each check records a requirement, observation, result and optional evidence attachment.
The Quality Reviewer examines an inspection in Review and accepts passing scope or rejects failed scope. A rejected case can raise a linked nonconformance.
The nonconformance keeps the inspection link, severity and description. A corrective action connects to that issue and retains its owner, root cause, action and due date. Effectiveness is reviewed before the action closes.
A device history review records the device lot, identifier, record package, review date and linked operational inspection. The review moves through pending and incomplete work before approval.
A supplier certificate keeps the supplier, component code, certificate type, expiry date and attachment beside its linked inspection. The inspector submits it with the operational case for review.
A training acknowledgment links a person and acknowledgment date to a controlled document. The document carries its title, version, effective date, file and status.
Each finding links to an audit and records its requirement, description, severity, due date, closed date and owner. The audit holds its scope, auditor and progress status.
Agree on a stable subject reference for each inspection and test it with one representative case. The integration guide describes the handoff.
Start free, then use Proto to change fields, steps and approvals before your team goes live.