All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Resource Planning System
  2. Features
  3. Rates and forecasts
Feature · Rates and forecasts

Rates and forecasts

Use reviewed effective rates to explain the value of forward staffing commitments.

OverviewActive rate cards
Resource Planning System · Rates and forecasts

Active rate cards

Rate cards

New
Rate card codePracticeRegionEffective fromEffective toApproved by
US-DATA-2026Change enablementNortheast20 OctMateo Valdez
US-ARCH-2026Change enablementSoutheast22 OctIris Chen
US-QA-2026Enterprise applicationsMidwest23 OctIris Chen
US-DELIVERY-2026Delivery operationsWest16 OctEvan Sato
US-INTEGRATION-2026Delivery operationsSouth21 OctEvan Sato
6 of 6 records
US-DATA-2026Rate cards · RC-38800
Northeast
PracticeChange enablement
Effective from20 Oct
Approved byMateo Valdez
Finance approved byLeila Haddad
Example screen with sample data

What you can do

Master data setup

Admin and Practice Leads configure Practices (one per delivery practice with a practice lead and US region scope), Roles (the demand language — Senior Engineer, Tech Lead, Solution Architect — each with a Level and default bill rate), Skills (the Technical / Functional / Industry / Language / Methodology catalog with proficiency scale), and the initial rate cards with rate card rows per Practice per Region per Role. Rate card activation requires Practice Lead + Finance co-approval stamped on the rate card before Status: Draft → Active; the prior active card’s effective to is set automatically.

Assignment generation

On approval the assignment-on-approval workflow fires: a code node creates an Assignments row (Resource, Project, Role, rate card resolved from Practice + start date, bill rate resolved from rate card rows and frozen on the Assignment, cost rate snapshotted from resource cost rate, allocation pct carried from the request) plus N assignment periods rows (one per week from start date to end date at the requested allocation pct). The workflow then writes the Resource into the matched pm-projects project as a project member via the connected record service so the team appears in the project workspace. The Resource and Project Manager are emailed.

Utilization rollup and bench detection

Weekly on Monday, utilization-rollup aggregates the prior week’s closed or frozen assignment periods and effective time actuals into one Utilization row per Resource (available hours, allocated hours, actual hours, billable hours, non billable hours, utilization pct, billable utilization pct). Right after, bench-detection scans the latest Utilization plus forward-booking coverage and writes a Bench row for every Resource whose forward-4-week average utilization pct falls below the bench threshold (default 60%). Practice Leads get a digest; the bench-clearing motion (cross-Practice loan, investment work or training time) starts from the Bench Report.

Price a new assignment across a rate revision

An approved rate card applies to a practice, region, role and effective interval. Resolve the card using the assignment’s start date and preserve the resulting rate on the assignment. A new catalog rate does not reprice an assignment that was already accepted.

Finance can prepare a proposed revision, but the preparer cannot supply either independent approval. Practice Lead and a separate Finance reviewer sign the same submitted version. If the proposed dates overlap another active card, resolve the overlap before activation so a staffing decision has one applicable rate.

Forward-booked revenue multiplies the relevant planned billable hours by their frozen assignment rates. This is a forecast of staffing value. It is not proof that work was delivered, an invoice was sent or revenue was recognized. Cost-rate visibility remains more restricted than quoted bill rates, including in exports and candidate comparisons.

What your team sees

  • Active rate cards. Open the current records for this module within your assigned role and permitted scope.

What it keeps track of

Data model
Rate cards
Versioned rate cards per Practice (and optionally per US region). A rate card has effective dates and a set of rate card rows. The active card on Assignments.StartDate prices the assignment.
Rate card rows
Per-Role rate row inside a rate card. The lookup grain for pricing an Assignment.
Assignments
The staffing record — a Resource on a Project at a Role at an allocation percentage over a date span. Spawned from an approved resource request. The unit of capacity consumption.
Assignment periods
Week-by-week allocation rows for an Assignment. Generated on approve; the granular hours that roll up into weekly capacity and Utilization. Reconciled to actuals from pm-time by time-sync-from-pm-time.
Practices
Organizational practice unit — a Practice owns a set of Resources, Roles, and rate cards. Examples: Data Engineering, Cloud Infrastructure, Business Consulting, Design.

Who uses it

Permissions
Finance
Prepares rates.
Practice Lead
And a distinct Finance reviewer co-approve. authorized planners read the approved rates.

Set up Resource Planning System your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appResource Planning System

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.