Get started
Plan the first process for your shop and agree what it takes to put it into use.
-
1
Start with Proto
Click Start now, then use Proto to configure Job Shop Management for your business. Set up your workflows, import your data and invite your team.
Bring a representative RFQ, traveler and job-close example. Tell us where quoting, scheduling or cost tracking breaks down today.
Start now -
2
Plan your rollout
Describe what you make, the work centers you run, your customer quality requirements and the tools you use for accounting, drawings and floor reporting. Identify the first process to introduce and whether existing jobs will finish in the current system or need a reconciled transfer. We can use that scope to plan configuration, migration and operating acceptance.
Write to [email protected] -
3
Include your agent
Choose the preparation work an agent should assist with, such as estimating drafts or organizing overdue outside work. During implementation, connect it to the verified application actions with scoped access and the same required human decisions. Platform access alone does not provide a ready Job Shop application.
$ curl -s erp.ai/skill.md | paste into your agentDownload agent
Give everyone the access their work needs, with clear decisions at the points that affect cost, quality and delivery.
ReportsReportsUnderstand job margin, floor capacity and delivery risk from the work your shop has recorded.
Data modelData modelThe proposed records, relationships and migration evidence behind quoting, production and job cost.
IntegrationsIntegrationsConnect accounting, drawings and the shop floor through handoffs that preserve the job and its history.
RolloutImplementationBring the shop onto a reviewed operating plan, from quoting and travelers to the first reconciled close.
APIAgent and APIUse AI to prepare quotes, organize exceptions and keep the right work in front of your team.
Modules
-
Quotes
Quote custom work with clear quantity options, reviewed margins and a production plan that follows the accepted offer.
-
Jobs
Keep drawings, travelers, material and customer commitments together from job release through completion and cost review.
-
Routing
Build repeatable operation plans with the right drawings, inspection points and costing basis for every job.
-
Scheduling
Plan work centre queues against real capacity, material readiness and customer dates, with the effect of changes visible.
-
Time & material
Capture the work performed and stock consumed, with reviewed time, traceable heat usage and controlled remnant returns.
-
Purchasing & outside processing
Buy for the job, trace incoming material and keep each outside-processing lot visible until its return is resolved.
-
Shipping & invoicing
Ship the accepted pieces with their certs, bill the agreed scope and reconcile payments, credits and returns.
-
Costing
Understand job margin as work posts, review the reasons for variance and use the completed job to improve the next estimate.