Planning
Demand, master schedule, MRP and capacity: from what customers want to what the plant and suppliers must do, with every planned order traceable to its demand.
Demand
Demand comes from approved orders, forecasts and the plant’s replenishment policies:
- Sales orders with a requested date, once approved.
- Forecasts by item and period, entered or imported, consumed by actual orders as they arrive.
- Safety stock targets, which act as standing demand at the item’s location.
- Dependent demand, generated by the planning run from the bills of higher-level items.
Forecast consumption rules decide how an order eats the forecast: same period, forward, backward, or none. The rule is set per item family, not hard-coded.
Master production schedule
The MPS is the statement of what finished goods will be built, in what quantity, in which period, at which plant. It sits between demand and MRP so that the plant commits to a build plan it can actually hold, and MRP works from that commitment instead of from raw demand swings.
- Time fences: inside the demand fence the schedule is frozen and changes need a named approval; inside the planning fence MRP may propose but not move; beyond it the engine plans freely.
- Available to promise is computed from the MPS, so sales quotes a date the plant has agreed to.
- Rough-cut capacity checks the MPS against critical work centres before it is released.
MRP run
The planning run explodes every top-level demand through the bills, nets each item against on-hand stock, reservations, open purchase orders and open work orders, applies the item’s lead time and lot sizing rule, and proposes:
- Planned purchase orders for bought items, with a suggested supplier and a release date that respects lead time.
- Planned work orders for made items, dated back from the need date through the routing.
- Exception messages: expedite, de-expedite, cancel, past due, and the shortage list that no manufacturer can run without.
The run can be regenerative (rebuild the whole plan) or net change (only items with new demand or supply since the last run). Output is pegged: open any planned order and see the demand that caused it, level by level.
Capacity
Capacity requirements planning takes the released and planned work orders, walks their routings, and loads each work centre by period in hours. The load profile shows where the plan breaks. The planner then moves orders, adds shifts, chooses an alternate routing or outsources an operation, and re-runs. Finite scheduling is available per work centre for the bottlenecks where infinite loading lies.
Modules
-
Product engineering
Items, bills of material, routings and engineering change, with revision control on all of it.
-
Planning
Demand, master schedule, MRP and capacity: from what customers want to what the plant and suppliers must do, with every planned order traceable to its demand.
-
Shop floor
Work orders, dispatch, operations, labour, material issue, scrap and completion, recorded where the work happens.
-
Inventory
Warehouses, locations, lots and serials, every stock movement, cycle counting and valuation that reconciles to the ledger.
-
Purchasing
Requisitions, sourcing, purchase orders, receiving, three-way match and supplier performance, with approval where money is committed.
-
Quality
Inspection plans, incoming and in-process inspection, non-conformance, corrective action, holds and certificates, tied to the exact lot or order.
-
Costing and finance
Standard costs, cost rollups, work-in-progress, variances and the journal entries that make every movement a posting.
Roles and permissions
Owns MRP, work-order release, scheduling, and BOM/Routing maintenance.
Makes assigned purchasing and control decisions independently of the person who requested or prepared them.
Related processes
Plan to produce
From a demand line to finished goods in stock: MRP, release, dispatch, execution and completion, with the gates where a person decides.
6 stages · 2 approvals
Order to cash
Quote, sales order, promise date, reservation, pick and ship, invoice and cash, connected to the plan so the date you promise is one the plant agreed to.
6 stages · 1 approval